RRAC Open Forum - Church House Westminster - 14 November 20031 Radio Technology & Compatibility Group Whyteleafe Surrey Leakage Emissions from ADSL & Power.

Slides:



Advertisements
Similar presentations
Iain Nicol Assistant Director DTI Standards and Technical Regulations Directorate Responsible for EMC Directive.
Advertisements

Seminar Report On Digital Power Line Carrier Communication
European Standards for (RF)ID-Systems Helmut Wolf Phone: +49 (0) 6131 – ETSI Workshop on RFID and The Internet.
Basic Wave Theory Review
Nairobi, Kenya, 26 – 27July 2010 Role of ITU-T & ITU-R Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU-T Workshop on Delivering Good.
International Telecommunication Union Accra, Ghana, June 2009 Conformance and Interoperability Testing: (WTSA-08) Resolution 76 Joshua Peprah Director,
RRC 04/05 ITU Information meeting September Computer methods for planning Ken Hunt Rapporteur for Chapter 10.
Nairobi, Kenya, 26 – 27July 2010 Maintaining Equipment Standards to ensure good QoS Mwende Njiraini Engineer I/NT/LCS Communications Commission of Kenya.
Milano 25/2/20031 Bandwidth Estimation for TCP Sources and its Application Prepared for QoS IP 2003 R. G. Garroppo, S.Giordano, M. Pagano, G. Procissi,
Noise Lecture 6.
Radio over fiber.
25 July Navigating Doors. 25 July Starting the Program A Doors shortcut icon is on the computer desktop Double-click the icon to start Doors.
Computers Are Your Future © 2005 Prentice-Hall, Inc.
High Speed Digital Access
Distributed AI an overview. D Goforth - COSC 4117, fall Why distributed AI? situated expert – the importance of general knowledge and incorporation.
Presented by: Eng. Karam Al-sofy
12-Access and Interconnection Technologies
28 July Doors Creating Time Zones. 28 July What is a Time Zone? A designated period of time in which access can be granted to a secure area.
Eigen-decomposition Techniques for Skywave Interference Detection in Loran-C Receivers Abbas Mohammed, Fernand Le Roux and David Last Dept. of Telecommunications.
Analog Communications
The European Parliament and the Semantic Web - Some considerations Peter Brown Head of Information Resources Management European Parliament 01D-GRI_GEN(2003)0014.
SWCAP Budgeting July 30, 2003.
July 30, Pro Rata Budgeting. July 30, Pro Rata Budgeting Pro Rata Detail by Funds reports are available on the Internet no later than October.
Earth Stations on Mobile Platforms (ESOMPs)
Not to be used outside the RA TWG on VDSL without written permission from RA and BT RA Technical Working Group on VDSL & PLT Compatibility With Radio Services.
CompTest Residual Curing Stresses in Thin [0/90] Unsymmetric Composite Plates Marco Gigliotti°, Michael R. Wisnom, Kevin Potter Department of Aerospace.
NICC PLC Update Paul Momtahan, Head Of Marketing.
Designing a EMC Compatible Electronic Meter using AD7755 a.
1 Compatibility of Digital Broadcasting and Mobile Services Regional Seminar on Digital TV Broadcasting Algiers, 4-5 December 2007 Presented by Jan Doeven.
SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik,
EMC Mohamed Mokdad Ecole d’Ingénieurs de Bienne. Agenda Current situation EMC Theorie Equipement interaction Sprectrum allocation –National & International.
Modulation is the process of conveying a message signal, for example a digital bit stream or an analog audio signal, inside another signal that can be.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
COMMUNICATION SYSTEM EECB353 Chapter 2 Part IV AMPLITUDE MODULATION Dept of Electrical Engineering Universiti Tenaga Nasional.
Possible Impact of VDSL on Stations Operating in the Amateur Radio Service Ed Hare, W1RFI ARRL Laboratory Manager 225 Main St Newington,CT 06111
Broadband over Power Line ARRL Statement Paul L Rinaldo Chief Technology Officer American Radio Relay League Tel: , Fax:
CCNA 1 Module 4: Cable Testing.
GSC: Standardization Advancing Global Communications Resolution GSC-10/05: (GRSC) Facilitating Liaison in Relation to Measurement Methodologies for Assessing.
BPL Regulations for Access Networks  CURRENT’s Experience.
1 Business Telecommunications Data and Computer Communications Chapter 4 Transmission Media.
ADSL Raghunath M D BSNL Mobile Services, Ernakulam, Ph:
Single Ended Measuring Modes of ELQ 30A To learn more click on the selected topic! ELEKTR NIKA Receiving Modes Impulse Noise Measurement Spectrum Analyzer.
1 William Stallings Data and Computer Communications 7 th Edition Chapter 8 Multiplexing.
TELECOMMUNICATIONS Dr. Hugh Blanton ENTC 4307/ENTC 5307.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Using Telephone and Cable Networks
24/03/2003Jacques MdM / REF France1 HF Receivers desensitisation from wideband noise spurious in HF bands (1.8 to 30 MHZ) Impact of spurious radiations.
Examining the pitfalls of Power Line Telecommunication (PLT) Hans van de Groenendaal South African Radio League.
1 RF (Radio Frequency) technology BASIC TELECOMMUNICATIONS.
Basics Modulation Multiple Access
Advanced Science and Technology Letters Vol.47 (Architecture and Civil Engineering 2014), pp Electromagnetic.
VDSL Emission Measurements at BT Adastral Park 2-6 April 2001 A collaborative project by RA & BT Radiocommunications Agency.
COMPUTER NETWORKING 2 LECTURE 3: BROADBAND TECHNOLOGY & DSL.
RADIO FREQUENCY SPECTRUM POLICY NOVEMBER Making South Africa a Global Leader in Harnessing ICTs for Socio-economic Development 2 WHAT IS SPECTRUM?
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
SunSpec EMC Compatibility Considerations Charles Razzell.
Asymmetric Digital Subscriber Line
Single Ended Measuring Modes of ELQ 30A+
平成30年6月 March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Technical requirements of Japanese.
Viestintävirasto Power Line Communications in Finland Martin Andersson, Deputy Director, Ficora
William Stallings Data and Computer Communications 7th Edition
Thomas Weilacher Chairman ECC Working Group FM
Updates on the 863MHz SRD band and 872MHz Award
Regional Seminar on Digital TV Broadcasting
GSC: Standardization Advancing Global Communications
SADC WRC-15 Preparatory Meeting
GSC: Standardization Advancing Global Communications
Wireless Power Transmission – WPT
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
The Physical Layer Chapters
Presentation transcript:

RRAC Open Forum - Church House Westminster - 14 November Radio Technology & Compatibility Group Whyteleafe Surrey Leakage Emissions from ADSL & Power Line Telecommunication Networks 14 November 2003

RRAC Open Forum - Church House Westminster - 14 November ADSL & PLT Telecommunication Networks Modern ‘Local Loop’ broadband access systems Based on secondary use of existing cables ADSL utilises existing twisted pair telephone lines PLT utilises the low voltage electricity distribution network Both compete with broadband coaxial cable systems

RRAC Open Forum - Church House Westminster - 14 November ADSL & PLT Leakage Issues Telephone & Power cables were not designed for high frequency use Leakage emissions can occur on ADSL lines under certain fault conditions but will occur inherently on PLT networks. Leakage emissions may be at significant levels and thus have the potential to cause serious interference to local radio reception

RRAC Open Forum - Church House Westminster - 14 November ADSL & PLT Interference – RA’s obligations ITU Radio Regulations – Chapter IV - Interference § 8 Administrations shall take all practicable and necessary steps to ensure that the operation of electrical apparatus or installations of any kind, including power and telecommunication distribution networks, but excluding equipment used for industrial, scientific and medical applications, does not cause harmful interference to a radio communication service and, in particular, to a radio navigation or any other safety service operating in accordance with the provisions of these Regulations.

RRAC Open Forum - Church House Westminster - 14 November The ADSL Situation

RRAC Open Forum - Church House Westminster - 14 November ADSL emissions & interference mechanism ADSL frequency spectrum encompasses the LW and MW broadcast bands Leakage emissions can occur due to imbalance in the unscreened twisted-pair telephone lines The resultant flow of common mode current generates an electromagnetic field around the telephone line Domestic AM broadcast receivers with integral ferrite rod antennas couple into the electromagnetic field ADSL interference is audible as white noise, a heterodyne whistle or a combination of both

RRAC Open Forum - Church House Westminster - 14 November ADSL Spectrum

RRAC Open Forum - Church House Westminster - 14 November Actions by RA to limit ADSL interference Accepted the positioning of a domestic portable radio between 1 & 3 metres from internal telephone wiring as the default operating condition requiring protection Consulted with Broadcasters and Telcos during the development of draft emission limits intended to protect LW and MW broadcast reception Issued the limits as a draft standard called MPT1570 & conducted a regulatory impact assessment Studied the feedback received & recommended a set of limits for ministerial approval Published MPT1570 containing emission limits from 9 kHz to 1.6 MHz

RRAC Open Forum - Church House Westminster - 14 November The MPT 1570 Standard – Points to note Not a compliance standard Limits to be applied only for adjudication purposes in cases of reported interference A compromise between the need to offer some protection to radio users whilst allowing Telcos to roll out ADSL without fear of undue expenditure on interference limiting measures So what protect does the MPT1570 limit offer ?

RRAC Open Forum - Church House Westminster - 14 November ADSL interference at the MPT1570 limit Best demonstrated subjectively with audio recordings These recordings were made at Whyteleafe using BBC broadcast stat0ions adjusted to a ‘edge of service area’ field strength of 66 dBuV/m in LW & 60 dBuV/m in MW The heterodyne case - unmodulated ADSL carriers The white noise case - modulated ADSL carriers Did RA get it right ?

RRAC Open Forum - Church House Westminster - 14 November An ADSL Interference complaint

RRAC Open Forum - Church House Westminster - 14 November ADSL Interference resolution

RRAC Open Forum - Church House Westminster - 14 November ADSL Interference – The Facts Approaching 1.5 million ADSL lines in the UK MPT1570 limit offers only minimal protection to LW & MW broadcast reception RA aware of only 1 substantiated interference complaint so far So how do we reconcile this situation ?

RRAC Open Forum - Church House Westminster - 14 November ADSL Interference - Observations The majority of fault-free ADSL lines have leakage radiation well below the MPT1570 limit Any faulty lines are usually repaired quickly & before any interference being experienced has the potential to become a ‘persistent interference’ complainant White noise & heterodyne whistles may not be recognised as external interference by most listeners Most radio listeners do not know how to complain or who to complain to

RRAC Open Forum - Church House Westminster - 14 November Conclusions As the ADSL roll-out gathers pace and radio users become aware of the technology further interference complaints are deemed inevitable The situation is likely to be exacerbated by the current use of self-install ADSL products having no filter between the incoming telephone line and customer premises wiring Interference resolution is likely to be more reliant on the cooperation and goodwill of Telcos than the effectiveness of the MPT1570 emission standard ADSL interference is not expected to become a serious issue for Ofcom

RRAC Open Forum - Church House Westminster - 14 November The PLT Situation

RRAC Open Forum - Church House Westminster - 14 November Current status of PLT in the UK A recent competitor in the broadband local loop Scottish & Southern Energy plc is currently the only PLT operator in the UK S&SE has commercial trials underway at Crieff Campbeltown and Stonehaven in Scotland and most recently in Winchester In comparison with other broadband systems the current number of PLT users is still very small RA have received no interference complaints to date

RRAC Open Forum - Church House Westminster - 14 November The PLT Network Comprises an electricity sub-station and those PLT users served by it Typically up to 200 electricity users per sub-station with a potential of up to 20 PLT users Typical sub-station network is 200 to 300 metres long PLT launch power is similar to ADSL at -40 dBm/Hz but high attenuation means that repeaters may be required for maximum reach Each sub-station requires a dedicated high capacity link to service its PLT users

RRAC Open Forum - Church House Westminster - 14 November PLT signals & spectrum PLT standards and equipment still evolving Several competing systems exist - built around: Gaussian minimum shift keying Direct sequence spread spectrum Orthogonal frequency division multiplex PLT spectrum lies in the 2 – 30 MHz range Band can be split between access & in-house Local Loop access from 2 to 10 MHz In-house distribution from 15 to 30 MHz

RRAC Open Forum - Church House Westminster - 14 November PLT leakage emissions Power cables are not designed for high frequency use They are unscreened and unbalanced to RF Leakage emissions are therefore inherent and unavoidable under normal PLT operating conditions Common mode PLT current generates an electromagnetic field around all power cables connected to a PLT enabled sub-station All properties fed by a PLT enabled sub-station will have high frequency electromagnetic fields radiated by their internal wiring whether they take the PLT service or not

RRAC Open Forum - Church House Westminster - 14 November Action by RA to investigate PLT emissions Field Strength measurement programme during the original Nor.Web PLT trials in Manchester /9 Field Strength measurement programme on an electricity network using a Gaussian White Noise ‘generic PLT’ signal Field Strength measurement programme during the current Scottish & Southern Energy PLT trials in Crieff and Campbeltown /3 Measurement programme planned for the S&SE PLT trials at Winchester early in 2004

RRAC Open Forum - Church House Westminster - 14 November ‘PLT’ Emissions inside a user premises

RRAC Open Forum - Church House Westminster - 14 November ‘PLT’ Emissions ‘next door’ to a ‘PLT’ user

RRAC Open Forum - Church House Westminster - 14 November PLT interference to SW Broadcast reception Relatively high emission levels are to be expected in the general vicinity of a PLT network SW broadcast reception in the home using domestic receivers having whip antennas will be particularly susceptible to PLT interference which may also be conducted into the receiver via the mains lead Typical near field strength regression levels of 1/r or 20 dB per decade indicate that external antennas situated within or at the boundaries of normal size domestic premises may also prove inadequate for the interference free reception of SW broadcast signals

RRAC Open Forum - Church House Westminster - 14 November PLT interference to Amateur Radio reception Potential to affect all 10 Amateur Radio allocations between 1.8 & 30 MHz Likely to be particularly problematic due to the low field strength levels involved Nature and extent of interference will depend on the PLT signalling system in use Amateur radio operator may or may not be able to avoid interference by changing frequency or band

RRAC Open Forum - Church House Westminster - 14 November RA consultation on PLT and VDSL interference RA’s UK technical working group met during 2001/2 to study compatibility between Radio Services and VDSL & PLT operation in the 1.6 to 30 MHz range The UKTWG comprised broadcasters radio users and network operators A full and comprehensive report on the study appears on the RA website The report concludes that neither VDSL or PLT emissions can be reduced sufficiently to meet radio users near-field protection requirements

RRAC Open Forum - Church House Westminster - 14 November PLT Interference – Points to Ponder RA measurements and UKTWG studies have shown that PLT deployment is likely to be incompatible with 1.6 to 30 MHz reception within the domestic environment due to substantial near-field emission levels Although Short Wave reception is generally considered a minority interest enjoyed by the technically aware this may change with the introduction of Digital Radio Mondiale broadcasts As PLT networks continue to roll out any interference complaints that do arise will be potentially irresolvable Ofcom will therefore need to consider their policy on this issue as a matter of urgency