PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.

Slides:



Advertisements
Similar presentations
PN UNC Workgroup (AQ topic)
Advertisements

1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
DESC Action DE0301 & DE0302 (New Project Nexus Allocation Algorithm) 4th April 2012.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Gas Performance Assurance Framework 11 th January 2013 Confidential.
IGT Single Service Provision Requirements Update – 27 th March 2013.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
1 Performance Assurance Workgroup January 2014 A proposal by Xoserve for a Performance Assurance methodology.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
PN UNC Workgroup Settlement topic 4 th October 2011.
PN UNC Workgroup Read Validation 4 th October 2011.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
PN UNC Workgroup Settlement Issues 1 st November 2011.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gas Performance Assurance Framework 11 th January 2013.
Project Nexus UNC Workstream Consolidation of High-Level Principles Fiona Cottam 19 May 2010.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
Customer Charge On behalf of all DNs 19 November 2010.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Review of Demand Estimation Times for Modification Proposal 461
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Review Group 178 SSP as Domestic only.
Extraordinary DSC ChMC
DM Elective Transfer Scenarios 26 February 2009
Modification th July 2008.
Project Nexus Workgroup
Project Nexus Workgroup
Rolling AQ Review Group 177.
Project Nexus Workgroup
Nexus Requirements To support the current business processes
Project Nexus Workgroup
Project Nexus Workgroup
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
PN UNC Workgroup Settlement Overview
PN UNC AMR Topic Workgroup
Project Nexus Workgroup
PN UNC Workgroup (Settlement topic)
Nexus Workgroup Mod 0473 Presentation
Invoicing Proposals 20th May 2013
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Nexus Workgroup Read Validation Scenarios
Project Nexus Workgroup
Project Nexus Workgroup
Project Nexus Workgroup
Unidentified Gas (UIG)
PN UNC Workgroup (AQ topic)
Extraordinary DSC ChMC
Presentation transcript:

PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012

2 Background Allocation Scaling Adjustment discussed and principle agreed in Settlement BRD Reconciliation Scaling Adjustment agreed in Reconciliation BRD –Market Share changed from throughput to AQ in PN UNC During internal analysis questions have been raised with the new arrangements None of which are un resolvable but –clarification needed for legal text and –assurance that we all have the same understanding of the arrangements

3 Allocation processes – Timelines GAS DAY = DD - 1D+1 to D+5 INPUTS OUTPUTS Daily Energy Allocations Total System Outputs Energy Balancing Indebtedness Total LDZ Energy, Actual DM Reads Daily Energy Nominations Informs gas purchasing Estimated LDZ Energy, DM Estimates (from Shippers) ALPs, DAFs, AQs final Gas NominationsGas Allocations Gas Nominations = Day Ahead Forecasting

4 Future Allocation – Project Nexus Allocation as described in Settlement BRD Unidentified Gas shared at portfolio level in each LDZ Non-Daily Metered Daily Metered c 2. Shrinkage 3. Larger DM sector – Process 1 & 2 – Actual Measurements 4. Improved standalone estimation for NDM sector (Process 3 & 4) 5. Allocation Scaling Adjustment – remaining energy is smeared at LDZ portfolio level 1. Total Energy as measured into the LDZ

5 Current Process Non-Daily Metered Daily Metered AUGE allocates unidentified gas from SSP market to LSP market & potentially DM’s % of unidentified is defined in advance based on historical information

6 Allocation Scaling Adjustment Unidentified Gas shared at Shipper portfolio level in each LDZ Applied to all Products (daily metered and non daily metered) Reconciliation Scaling Adjustment adjusts the share following a reconciliation of a meter point Total Energy allocated within an LDZ Unidentified gas Non-Daily Metered Daily Metered

7 Issues Should the share of unidentified gas be shared using the same data? –Allocation Scaling Adjustment share is based on consumption at GFD+5 –Reconciliation Scaling Adjustment share is based on AQ What is the future role of the AUGE in the new arrangements? –Possible Options? No AUGE AUGE reviews unidentified gas & makes recommendations for process change, no impact to sharing AUGE sets rules for share of both Allocation & Reconciliation Scaling Adjustment