PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

PN UNC Workgroup (AQ topic)
1 Project Nexus Modelling costs and benefits Andrew Wallace, Cesar Coelho Ofgem Project Nexus IA Subgroup 25 July 2012.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Implementation of Non Effective Days Nexus Workgroup – March
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
PN UNC Workgroup Supply Point Register 25 th October 2011.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Nexus Workgroup CSEP Transition Topic June
IGT Single Service Provision Requirements Update – 27 th March 2013.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Project Nexus Workgroup – Invoicing 11 th August 2014.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
PN UNC Workgroup Settlement topic 4 th October 2011.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
PN UNC Workgroup Settlement Issues 1 st November 2011.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Options for Mod 640 Replacement
PN UNC Workgroup Invoicing 4th October 2011.
Incentives 26 September 2018.
PN UNC Workgroup iGT Services
Project Nexus Workgroup
Project Nexus Workgroup
Impacts of Project Nexus Implementation Date to AQ17
Project Nexus Workgroup
PN UNC Workgroup iGT Services
Project Nexus Workgroup
PN UNC Workgroup Settlement Overview
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
PN UNC AMR Topic Workgroup
Non Functional Topic 6th December 2011
PN UNC Workgroup (Settlement topic)
UK Link Replacement Programme additional supporting UNC modifications
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
PN UNC Workgroup iGT Services
Project Nexus Workgroup
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Nexus Workgroup Read Validation Scenarios
Project Nexus Workgroup
Modification Proposal 136
Mod 209 – Rolling AQ.
Project Nexus Workgroup
Project Nexus Workgroup
PN UNC Workgroup (AQ topic)
Customer Issue Management CoMC Update
Presentation transcript:

PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011

2 Objectives of the Workgroups Determine detailed business requirements for future determination of the Meter Point AQ Consider/review comments made during the Project Nexus consultation and the high level principles agreed at the Principle Workgroup. Review existing Modifications relevant to the topic area Workgroup deliverables; –Process maps –Business Requirements Document. Document to provide sufficient definition around business rules to: Enable the proposed requirements to be incorporated in xoserve’s investment decisions, and Support the raising of any UNC Modification Proposals Monitor & align with latest SMIP position Focus will be on requirements for Project Nexus delivery

3 Approach & Workplan Review; –High level AQ principles –Mod 0209; Rolling AQ –Mod 0380; Periodic AQ Calculation –Mod 0379; Provision of an AQ review audit (including 0379A) –Mod 0378; Greater transparency over AQ Appeal performance –Mod 0292; Change AQ Amendment Tolerance for SSP Agree scope Consider requirements from Settlement Workgroup & impacts on the AQ Agree future requirements Develop process maps and detailed business rules

4 Scope of AQ Determination Submit Meter Reading to GT Timing & Calculation of AQ Calculate BSSOQ Calculate SOQ/SHQ Notification of AQ Challenges to the AQ Determination of the AQ, SOQ, SHQ & BSSOQ for all directly connected sites.

5 Business Issues Raised Issues identified during the AQ Principle Workgroup during March – April 2010 –Changes in consumption are not immediately reflected in the AQ –Current AQ is based on historic consumption data, does not accurately reflect current consumption –Unable to appeal SSP AQ’s –Manually labour intensive during the summer –Approx. 3.5 months to validate AQ’s on portfolio –Impacts on other processes during the processing & updating the annual AQ review –Current process does not provide an incentive to submit reads more frequently

6 Issues Raised at the 1 st AQ Meeting that need to be resolved Maintaining a static SOQ Transition Inaccurate asset data for legacy sites (& smart sites) Is a rolling monthly AQ required with meter point Rec? -Resolved Nomination of the SOQ & SHQ - Resolved Validation of the AQ before submission to the Shipper - Resolved Process for significant change in loads (BTU process) -Resolved

7 Summary of the 4 Processes being developed in the Settlement Workgroup Process Description Process for initial Allocation Process for Energy Balancing close-out Read Submission Timescales Type of Read Submission Reconciliation 1 – Daily Metered Time Critical Readings Uses daily read By 10am on GFD+1 All reads daily on GFD+1 Meter Point level following a re- synch or estimate 2 - Daily Metered not Time Critical Readings Transporter estimate Uses daily read By end of GFD+1 (05.59 am) All reads daily by end of GFD+1 Meter Point level following a re- synch or estimate 3 – Batched Daily Readings Transporter estimate Daily Reads in batches All daily reads in batches Daily Rec at Meter Point level on receipt of a batch of reads 4 – Periodic Readings Transporter estimate PeriodicPeriodic reads Meter Point level at receipt of read

8 Objectives for Today’s Meeting Review first draft of the future state process maps Agree content of BRD, in particular; –Assumptions –Scope –Business drivers & goals –Business Issues, constraints, risks, design considerations –High level AQ review requirements agreed at the last meeting Review Mod 209 business rules –Agree which apply to ‘Monthly Rolling AQ’ –Define (over next meetings) any new business rules for the new regime