Hybrid Option(s) Ritchard Hewitt – August 2010. Fundamentals  Parameters – Cost Reflective, Incentive, Value  Cost – What does it cost the service provider.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
AUGUST 7-9, 2013 | LENOX, MA Andrew Gillespie MARKET DEVELOPMENT (413) Review of Market Rule 1: Section.
Operating Margins UNC Sub Group Tuesday 4 th November 2008.
EIUG – Wheeling Methodologies
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
National Grid: Gas Transmission System Operator
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
Managerial Accounting:
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Financial performance measures and transfer pricing
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
RG0291 – NTS Licence SC27 – Balancing Arrangements Linepack – Commercial Considerations/Options Review Group 291 – 19 th July 2010.
McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc. All rights reserved. 7-1 Defining Competitiveness Chapter 7.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Contribution. Definition of contribution Contribution is the difference between sales revenue and variable cost Contribution is the difference between.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Your Competitive Edge In Energy. Designing Liquid, Transparent, Reliable Wholesale Markets Nigel Evans Executive Vice President Head of Global Energy.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Inter-day Energy Transfer – Opportunity and Risk
Review Group 291- Ofgem Update
Background and Process
UNC Modifications 061 & 062 – An Overview
SO Incentives from April 2010
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Mod 0452 (PARCA) – Further thoughts
User Compensation for NEC Storage Curtailment – Draft Proposal
Cashout actions and further considerations
Joint Office Presentation for Modification 0678
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
Review Group 291- Ofgem Update
Ritchard Hewitt – September 2010
Draft Mod: Update of default System Marginal Prices
EU Balancing Code – Mod 494 Imbalance Charge Amendments
Entry Overrun Calculation
Ofgem presentation to Gas Transmission Workstream
Presentation transcript:

Hybrid Option(s) Ritchard Hewitt – August 2010

Fundamentals  Parameters – Cost Reflective, Incentive, Value  Cost – What does it cost the service provider to provide the service  Incentive – Promote use or discourage use?  Value – Customer signals requirement before use – Auction

Options  Value option  Previous industry meetings have developed a “Value” model  Auction based  Advantages:  Discovers the customers’ value for the product (market responsive)  Disadvantages:  Complexity

Incentive option  What behaviour do we want to incentivise?  Current Cashout incentives seek in part to reduce use of day on day linepack service.  NG Incentives directly encourage reduced change in Linepack levels.  SMP prices set by Residual Balancer actions reflect the cost of both the energy bought and the cost of replacing “utilised” but unavailable Linepack flexibility service.  Above incentives therefore could be viewed as being at odds with an objective of maximising the “efficient release” of available linepack flexibility  Incentives are however required to encourage “efficient use” of Linepack flexibility

Incentive option ….  Should the shipper incentives vary according to system position or overall shipper imbalance position?, i.e.  Small linepack change / imbalance = moderate (or no?) incentive  Larger linepack change / imbalance = greater incentive  NB – if Balancing Actions taken then Marginal SMPs still apply  Should incentives be different for those who “helped” the system?  Do shipper actions on D-1 affect D balancing actions?.  If yes – then should the D-1 shipper that “contributed” to the need to balance incur a proportion of the costs of addressing the imbalance on D?  If yes – then should the D-1 shipper attribution be the same or different than the D shippers?

Incentive option cont…  Advantages  Promotes efficient use of available linepack flexibility  Disadvantages  May discourage use of available linepack flexibility

Cost Option  National Grid Transmission (NGT) is a monopoly  Assessment of its service provisions are therefore generally based on “cost reflectivity”.  Linepack flexibility service in its simplest possible form is a function of the cost to put a piece of pipe in the ground divided by the amount of linepack it could generate each day over its useful service life plus the injection and withdrawal costs (compressors)  But what happens on the day that you run out of pipe…?

Cost Option  Advantages  Cost reflective  Disadvantages  Not responsive to market conditions

Hybrid Option – “Cost + Incentive”  This option seeks to combine part of the Cost Option with the Incentive Option.  This option has a number of areas where it could be “developed” to either include or exclude certain aspects.  These aspects are identified in red text in the slides that follow.  This is a strawman and we are seeking comments on its merits and how it may be developed / improved MBA = Market Balancing Action as defined in the UNC

Hybrid Option – “Cost + Incentive”  On “Non - MBA days” the cashout differentials will be set to reflect a “LRMC type” cost of providing the “storage” facility plus the costs of injection or withdrawal  On “MBA days” the cashout differentials will be set by the SRMC type cost to the Transporter of having to arrange for “short notice” access to more “storage” plus injection and withdrawal MBA = Market Balancing Action as defined in the UNC

“Non - MBA days”  This day is one where no Market Balancing Actions were completed and there was no Market Balancing Action on the following Gas Day either.  On this day all the Linepack flexibility is provided by the system and therefore the cost proposed is one based on the “average cost” of providing an asset capable of delivering this amount of linepack flexibility and the Opex needed to operate this asset. Lets call this – “Standard flexibility”

“MBA Days”  “When use of the service outstrips supply”.  The amount of available Linepack Flexibility varies every day and therefore it is inevitable that on some days demand outstrips supply.  On these days the Linepack level is maintained within an acceptable range by taking Market Balancing Actions (MBAs).  The “cost” of these actions could be considered to be the cost of sourcing and then providing “short notice” linepack flexibility. Lets call this “Dynamic Flexibility”  MBAs also includes that day’s cost of energy and this should perhaps be factored out

Strawman  Dynamic Flexibility Charge (DFC)  Pseudo - Short run cost of linepack flexibility  Suggest this is weighted average price of all Market Balancing Actions minus EOD SAP price (other options?)  NB weighted average is calc’d separately for those actions either side of the end of day SAP price

Dynamic Flexibility Charge  Other options considered:  Full Marginal Price – not cost reflective?  Day on Day market price change – could go negative, not cost reflective

Strawman - example  Day X to Day 1 shippers maintain supplies and demand within acceptable ranges and system pressures are within acceptable limits. No Market Balancing Actions.  Cashout  Short = SAP plus Standard Flexibility Charge  Long = SAP minus Standard Flexibility Charge

Strawman  Day 1 through to Day 2 shipper imbalances lead to Market Balancing Actions on Day 2.  Cashout for D2  Short = SMPbuy set by MBAs plus Dynamic Flexibility charge  Long = SMPsell set by MBAs minus Dynamic Flexibility charge  Cashout marginal prices for D1 reset:  Replace Standard Flexibility Charge with Dynamic Flexibility Charge for those shippers who were in the same direction as the system imbalance, or  Replace Standard Flexibility Charge with Dynamic Flexibility Charge for all shippers  Note – SAP for D1 is not changed

Day One (non MBA) Day 2 (MBA) Buy System Short Day 3 (MBA) Sell System Long Shipper position ShortLongShortLongShortLong SAP+SFCSAP-SFCSMPb + (WABP - SAP) SAP – (SAP - WASP) SMPb + (WABP- SAP) SAP – (SAP- WASP) SAP+(> SFC or D2 DFC) SAP-SFCAs aboveSAP – (> Day 2 DFC or Day 3 DFC) Day 4 effect

Strawman  All revenues from the additional charges to feed into Capacity Neutrality? or  Fed back through Balancing Neutrality (SO activity)  Incentive options:  Incentive on NG Transmission to avoid taking Market Balancing Actions as per now.  Current NGT Linepack incentive removed.  New NGT incentive around the amount of energy cashed out at the Standard Flexibility rate.

Strawman  Advantages:  Automatic release of service avoids “auction” option costs and difficulty of establishing amount to release.  Cost reflective and yet dynamic and market based when required  Maintains existing Daily Clearing process  System is cleared daily to future reconciliation's are administered as now avoiding system build costs.  Disadvantages:  Does not facilitate shipper “carrying forward” an imbalance position – System is cleared daily as now.  Complex clearing process  Lack of within day Cashout price discovery

Views / Comments? ?