Deliverables and Milestones in WP2 D2-2 Weather Forecast on WWW (June 2002) D2-3 Signing Tutor (June 2002) M2-3 Edit-tool (Sept.2002)

Slides:



Advertisements
Similar presentations
WP Operative Plan WP 4 : Functional requirements Task Responsible: Regione Piemonte.
Advertisements

A Model for Common Services Process Approach Assessment Planning Decision-Making Management.
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
OGSA-WG charter discussion Dec. 3, 2003 F2F meeting at ANL.
Where next…. Stakeholder workshop, 29 Jan To the end of the project.
Annual Project Review 12 October 2000 IST
ViSiCAST: Virtual sign: Capture, Animation Storage & Transmission BDA Conference 2nd August 2000 Belfast Dr John Low RNID.
Main Scenario Daniel wants to wear his black T-shirt. Daniel wants to know what can he wear with it? He would like to see some options from which he can.
Coursework.  5 groups of 4-5 students  2 project options  Full project specifications on 3 rd March  Final deadline 10 th May 2011  Code storage.
Françoise PRETEUX, Unité de Projet ARTEMIS - INT - Evry France The ViSiCAST Project Vi rtual Si gning: C apture, A nimation, S torage & T ransmission IST.
ViSiCAST 2002 Technical Audit 4 October 2002, Brussels Michele Wakefield - Project Manager, ITC.
1 Recognition Assessment Questions Answered. 2 What is Recognition Assessment? It is not an exam or test. It looks at the candidate’s industry skills.
RESEARCHING HEATED TOPICS CONTROVERSY!. CHOOSING YOUR CASE STUDY Read the 4 options in order to inform your choice. This includes the first two pages.
2009 Mid–Term Review El Verde Field Station June 4, 2009.
John Langsford 13 September 2006 CI Implementation Project.
Z39 Server DigiTool Version 3.0. Z39 Server 2 z39 SERVER Main Topics z39 server architecture z39 server services z39 server configuration Defining a new.
SYSTEMS DEVELOPMENT LIFE CYCLE (SDLC). GROUP MEMBERS HALİDE ÖZBAŞLI HALİDE ÖZBAŞLI İ. TUĞÇE BOZ İ. TUĞÇE BOZ MURAT IRKKAN MURAT IRKKAN.
Visual Languages and Human-Centric Computing September 9, 2004 Managing Duplicated Code with Linked Editing Michael Toomim, Andrew Begel and Susan L. Graham.
1 Info 1409 Systems Analysis & Design Module Lecture 5 - Feasibility HND Year /9 De Montfort University.
15 1 Chapter 15 Database Administration Database Systems: Design, Implementation, and Management, Seventh Edition, Rob and Coronel.
1 Case Study: Starting the Student Registration System Chapter 3.
Dissertation proposal Coursework 2 Due 8 May % of final grade 2,000 words.
Knowledge Science & Engineering Institute, Beijing Normal University, Analyzing Transcripts of Online Asynchronous.
Vex Release Review | © 2012 by Vex committers, made available under the EPL v1.0 Visual Editor for XML 1.0 Release and Graduation Review Florian Thienel.
Overview of the Database Development Process
Word Processors, Databases, Spreadsheets, and Data Problems.
DevInfo Implementation. Training courses No.CoursePlace No. of participants 1ChildInfoLebanon2 2 DevInfo v4.0 India3 3 Workshop on devInfo v5.0 India2.
9/14/2012ISC329 Isabelle Bichindaritz1 Database System Life Cycle.
Click to edit Master title style 1 Proprietary and Confidential—the information and materials in this document are not for use or disclosure outside of.
Computers Are Your Future Tenth Edition Chapter 13: Systems Analysis & Design Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
University Of West Florida John C. Pace Library ABI Inform Global Tutorial.
MS Access: Introduction 1Database Design. MS Access: Overview MS Access A Database Management System (DBMS) designed to create applications that organize,
Sept 2007 K. Ingram 1 Waterfall Life Cycle An introduction to the Waterfall.
CASE Tools Union Palenshus. In the early days… ► Software engineering tools consisted solely of translators, compilers, assemblers, linkers, loaders,
Revision WP2 description ViSiCAST consortium meeting 5 & 6 July.
CMPGN3007 & CMPGN3008 BSc Project Dr T.A.Etchells BSc Project Tutor
T Project Review Sotanorsu I3 Iteration
Software Production Chapter 2: Identifying Software Development Activities.
Assessment in P.E?? Plickers makes it easy! Jana McCollum 7/10/15.
1 AHM -2-4 Sept 2003 e-Science Centre Running SRB Ananta Manandhar.
eMerger Integration Planning
Database Alerts and Persistent / Durable Links  Alerts are notifications regarding additions to the database  Persistent or Durable links are links that.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Hellenic Navy Hydrographic Service HELLENIC NAVY HYDROGRAPHIC SERVICE Proposal for consideration for implementing a common Bathymetric Database under the.
Scheduler CSE 403 Project SDS Presentation. What is our project? We are building a web application to manage user’s time online User comes to our webpage.
Password? CLASP Phase 2: Revised Proposal FOCUS, 3 May 2001 Denise Heagerty, IT/IS.
© 2005 Prentice Hall, Decision Support Systems and Intelligent Systems, 7th Edition, Turban, Aronson, and Liang 6-1 Chapter 6 Decision Support System Development.
Summary Report Project Name: Infoway Testing Environment Brief Project Description: A set of tools to test that vendors have successfully implemented the.
1 Process activities. 2 Software specification Software design and implementation Software validation Software evolution.
BENCH-CAN Coordination
WP4 Models and Contents Quality Assessment
Final Project Ideas, Requirements, and Deadlines
Unit 6 Application Design Practice Assignment.
OHT Project 10/2009 Supply Chain Tooling Content Pressures Added
NET301 Lecture 2 10/9/2015 NET 301.
RDA/TDWG Metadata Standards for Attribution of Physical and Digital Collections Stewardship Anne E Thessen, Matt Woodburn, Dimitris Koureas 21 Sept, 2017/Montreal,
Using Access to Implement a Relational Database
Copyright © Simon Wallace
IDBR Re-engineering Gail Rowles.
Chapter 13 Adding Slide Transitions
WP7 – COMBINING BIG DATA - STATISTICAL DOMAINS
Database Administration
Word Lesson 6.
ODV beta Multiple views, new views bar
May 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4a 2.4 GHz CSS PHY Status Report for Cairns.
Restaurant IOS application
A Renewable Energy Operational Guide for Electric Services
Screen Capture & Screen Recording at $49.95 Screen Recoder & Video Editor at $49.75 Video & Conetnt Hosting at $9.95 per month Collaborative Feedback.
Presentation transcript:

Deliverables and Milestones in WP2 D2-2 Weather Forecast on WWW (June 2002) D2-3 Signing Tutor (June 2002) M2-3 Edit-tool (Sept.2002)

D2-2 Timetable made Improvements are being made Preparations for hosting are being made

D2-3 (Rolf)

M2-3 Work group established (John G., Thomas, Margriet) 1rst task: choice of domains further steps: –IvD, UH & UEA create lexicons –UEA creates a port from translator-type of lexicon to editor-type of lexicon –IvD investigates which parts of which signs must be changeable by the user. Feasibility of sign-editing options is discussed with UEA. –UEA continues implementing the animation of HamNoSys –UEA implements basic aspects of the editing environment: an empty sign-database with HamNoSys-entering mechanism selection of sign out of database possibility to edit the retrieved HamNoSys visual feedback the possibility to store a created SL-document and to re-edit it later