CONTRACTORS AND SOFT LANDINGS. TARGETS Smooth Handover at Practical Completion Defect Free installation Completed Environmental and BMS Testing Conversant.

Slides:



Advertisements
Similar presentations
Christine Pasquire, Nick Blismas, Alistair Gibb
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Develop an Information Strategy Plan
Information delivered by: Alan Coole from Scape System Build Ltd Fresh Thinking.
Soft Landings. Challenges and opportunities By Roderic Bunn A revolution in the way we deliver projects Seminar chairman: Roderic Bunn, BSRIA.
Soft Landings: Design mapping Gary Clark Principal Architect, Atkins.
Managing a Successful Mechanical System project Following design – what next?
Effective Contract Management - Getting it Right! 24 th January 2007.
BREEAM use at the University of Bristol. Overview Background Our Approach Progress to date Lessons learnt.
A Match made in Heaven? Connecting you with a builder.
ESTATES SERVICES Soft Landings – An Introduction 2013.
This project is funded with support from the European Commission " Legal disclaimer: the contents of this material is the sole responsibility of implementing.
BIM Sarah Birchall and Jo Harris 25 th September 2014.
HEALTH and SAFETY Michael Martin Director Construction Consultancy MAY 2002 HONG KONG.
Tang Report 2001 “Construct for Excellence”. Background Sub-standard foundation works in several public housing developments in 1999 The Secretary for.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Annual Report 2004/05 Presented by: Russell Smith Estates.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
BIM Execution Planning (BEP)
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
BUILDING – FROM THE GROUND UP HOSPITAL ENGINEERING INVOLVEMENT IN PROJECT IMPLEMENTATION.
Responsibilities of partners – need for continuing active contribution Lesley Rickards MEDIN Open Meeting, 2 November 2011.
Pathways to change Day 2, Informing Changes Workshop 4: Pathways to change.
Personalisation Self Directed Support & Supported Employment in Scotland.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
1 A Member of the Team Focus Group Integrated Management Systems Industry View 2 Michael Thompson BSc (Eng), FFICE, MCIWEM Roe Thompson Limited.
John Stevens Spectrum Housing Group Source Design & Project Toolkit.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Sustainable Procurement National Action Plan: Flexible Framework Paul Hinsley Sustainable Procurement Manager.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
Methodologies for improvement of non-residential buildings' day- to-day energy efficiency reliability Minder May 2014, HJG & TB (contact: thomas. berker.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
a guidance to conversion
Developed by:.  What is it?  Approaches  Processes  Objectives of PM  Conclusion.
Building Performance Evaluation £8m funding between 2010 & 2014 Case study investigations Identify factors that encourage good performance Domestic &
Manchester Town Hall Complex – Achieving Energy Performance.
Capital Insight Pty Ltd ABN SYDNEY MELBOURNE BRISBANE Staff Training 11 March 2009 Health Infrastructure’s.
Sydney (02) Melbourne (03) Brisbane (07) Presenter Capital Insight Conference 2013 – Brian Davenport.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
CDM 2015 Simon Longbottom 20 May Progress Significant culture change over last years Long-term downward trend fatals/major injuries Greater.
Delivering Successful LED and Energy projects Ken Carter 29/6/2015.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Maintenance Delivery Peter Beasley Maintenance Delivery Manager Property Business Services Surrey County Council Tel:
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Scape – The effective and sustainable route to procurement for the Public Sector Adrian Hill – National Business Manager.
Maintenance Delivery Peter Beasley Maintenance Delivery Manager Property Business Services Surrey County Council Tel:
Commission of Inquiry into achieving best value in the procurement of construction. Andrew Smith Chair of NIEP Board National Improvement and Efficiency.
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
GOVERNMENT SOFT LANDINGS (GSL) FRAMEWORK Overview and record sheet
‘Sustainability Matters – it’s the future of your business’
Areas Separate Approaches Parallel Approaches Joint Approaches
Engineering Activities In Software Development
PRESENTATION TO PORTFOLIO COMMITTEE AG REPORT ON CONSULTANTS
UNIT V QUALITY SYSTEMS.
Introduction to building contract
Building the future Workshop 3 24 November 2017
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Rachel Calver – Post 16 Assistant Head, Virtual School Kent
5.b3 Monitoring & Reporting 2019
ECM Step Program Report November 2012
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

CONTRACTORS AND SOFT LANDINGS

TARGETS Smooth Handover at Practical Completion Defect Free installation Completed Environmental and BMS Testing Conversant Client Operating and Maintenance Staff

HOW DO WE ACHIEVE THIS? Does the Soft Landings approach help? What is making it so difficult?

APPOINTMENT TIMING When should the M&E sub contractor be appointed? The earlier the better can determine type of contract 2 Stage tender Partnering

RIGID CONTRACTUAL STRUCTURE Main Contractor M&E Contractor CDP Contractor

FORM OF CONTRACT JCT NEC Adversarial Collaborative Does the Form of Contract need to change?

DESIGN AND BUILD Stage C Stage D Stage E Stage F Forward and retrospective design responsibility

CAN SL STILL WORK WITH D&B? Original Consultants involvement Continuity Responsibility

EMPLOYER’S REQUIREMENTS Does stating the requirement of Soft Landings drive a different approach? What is that different approach?

COLLABORATIVE WORKING A structured approach by ALL parties to meet the Targets. Soft Landings provides the framework for this.

OTHER DRIVERS FOR THE ADOPTION OF SOFT LANDINGS BREEAM WRAP GOVERNMENT PART L

CHAMPIONS A continuous thread from inception to end of defects and beyond. ALL Contractors – Main and Sub – to have a Champion. Should Champions be part of the on site team? What authority should a Champion have?

CHANGE OF MINDSET? Training of on site teams from PM down. Irrespective of the contract is there a will to change? Are contractors being proactive or reactive to soft landings?

TRAINING Involvement of FM throughout the process Training by association as the contract progresses Training on an operating and completed system User Guidance

LAST 20% OF THE CONTRACT Adherence to programmed periods Adherence to commissioning periods Adherence to environmental and BMS validation periods

DOCUMENTATION The influence of Part L 2010 O&Ms Record Drawings EPC

PRACTICAL COMPLETION PC Milestone. Should contractor involvement in aftercare be a separate contract? Should the Contractors Champions be part of aftercare? Seasonal Commissioning.

THE IMPORTANCE OF THE SOFT LANDINGS PHILOSOPHY Driver for change Driver for more energy efficient buildings Driver for greater occupant satisfaction Driver for better operated and maintained buildings