1.

Slides:



Advertisements
Similar presentations
Developing a Decommissioning Acquisition Strategy for
Advertisements

1 Establishment of site security Chemical plant drain down & dismantling ->500 Tanks ->5000 Pipe Runs Demolition Site assessment and characterisation Construction.
Commissioned from Pact Consultancy by the National Primary and Care Trust Development Programme August 2003 Whole System Commissioning Insights from beyond.
Sif Johansson Marine unit, DG Environment
Module N° 7 – Introduction to SMS
NDA’s Strategy - Update
NuLeAF Opportunities for Storage Consolidation of Higher Activity Wastes 4 th November 2011.
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Safe and Sustainable Water Resources Research Integrate the existing Drinking Water and Water Quality research programs into one holistic program that.
Integrated Approach to Area Master Planning in Jubail Industrial City
Contract Models Terms and Conditions Joyce Matthews September 2003 LMU Tier 1 Supplier Forum.
Generation of Radioactive Waste Radioactive Waste Management and Disposal NUCP
GenTax® Upgrade to Version 9
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
P ROJECT S TATUS S UMMARY. Insert Date Presentation Title Goes Here Sample Project Status/Schedule Summaries In addition to managing a project plan in.
16+ Learning Choices data hub State of Play scotXed - 7 April 2011 Simon Marshall – Information Manager.
A presentation to the Spent Fuel Management and Nuclear Materials Working Group of the West Cumbria Sites Stakeholder Group Spent Fuel Management & Nuclear.
West of England Joint Waste Core Strategy. 2 The Purpose of the Joint Waste Core Strategy (JWCS) 1. To provide a strategic spatial planning framework,
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
CINAHL Keyword Searching. This presentation will take you through the procedure of finding reliable information which can be used in your academic work.
TM/WSP 5-9 Nov Group D3- Nuclear fuel cycle, nuclear waste - Site and supporting facilities - Environmental protection - Emergency planning QUESTIONS.
Indicative Business Case
International Atomic Energy Agency IX.4.3. Waste management.
A Sustainable Environmental Programme Enel Maritza East 3 Mike Foster CEO Enel Operations Bulgaria.
WWTF’s MPCA Permit Renewal January 14,  Our current NPDES permit expired Sept. 30,  NPDES permits are a 5 year term.  Upon expiration,
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
Tritium Management by Design
Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND.
Dounreay Nuclear and Chemical Land Contamination.
1 Nuclear Legacy Advisory Forum NuLeaf Presentation NDA Strategy II 20 th April 2010 NDA Programme Manager Richard Arnott NDA Head of Strategy Clive Nixon.
CH/1 © Dr. Christian Hicks and Dr Tom McGovern An analysis of the impact of the restructuring of the UK civil nuclear industry on tier 1 and tier 2 suppliers.
Sellafield Commercial Opportunities 2014 Presented by David Magrath and Rob Harries-Harris 12 June 2014.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
MODULE “STRATEGY DEVELOPMENT”
UK Cleanup Market Overview A Strategic approach to Cleanup & Hazard Reduction Nov 2010 Marcus Mackay mercury stone.
Implementing NDA’s Strategy - a year on Update to NuLeaf September 2012 Bill Hamilton, NDA Head of Stakeholder Relations.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
MACINTOSH 5.0. A form of energy produced by an atomic reaction, capable of producing an alternative source of electrical power to that supplied by coal,
Magnox Swarf Storage Silos Programme Decommissioning Delivery Partnership Requirements February 2014 Gavin Askew.
University of Pretoria
SAFESPUR 9/7/08 1 Innovation in Nuclear Decommissioning: New Technologies and Research, SAFESPUR Forum, July 9, 2008 G.R. Elder Bradtec Decon Technologies.
NuLeAF presentation Magnox ILW strategy 14 th May 2015 May 14th
Part 2 - Simplified Strategy. The IWCM Process The IWCM process consists of two main parts: Part 1: An Evaluation Study ( recently completed); and Part.
Decommissioning Delivery Partnership Rebecca Weston Tuesday 11 February 2014.
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
First Generation Magnox Storage Pond (FGMSP) Programme Partner Requirements February 2014 Steve Topping.
MODULE “PROJECT MANAGEMENT AND CONTROL” QUALITY ASSURANCE SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
CRESCENDO CRESCENDO Philippe HOMSI Paul WEBSTER
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
Howard Cooper Head of Quality, Sellafield Ltd The Sellafield Excellence Journey Date: 2 nd November 2011.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Need to Invest Investment Objectives and Case for Change Programme Option Identification and Assessment Analysis Strategic Case: Economic Case: Financial.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Everyone is a risk manager Risk & Opportunity Management.
PNISG Update June Xoserve’s UKLP Assessment Principles 1.Maintain current delivery plans where possible and appropriate e.g. don’t just push all.
Integrated Waste Management Strategy – preparing for SIII NuLeAF – 29 th January 2015.
RISK MANAGEMENT IN PROJECT DELIVERY (CONSTRUCTION)
Roger D Smith 27 February 2007 Building a Nuclear Future Breaking down the barriers to building the new generation of nuclear power plants in the UK Roger.
Offset Purchase Agreements: Key Issues RON EZEKIEL Fasken Martineau
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
Paul Henry with thanks to co-reviewers: Wolfgang Hees, Karin Rathsman, Peter Rådahl, Mats Lindroos Review of TDR Chapter 7 “Conventional Facilities”
Spent Fuel Management and Nuclear Materials (SFM&NM) July 2016 Update
NDA Draft Strategy.
NDA Draft Strategy.
Tom McGovern and Chris Hicks Newcastle University Business School
Simonson & Rosen’s Influence Mix Template
Presentation transcript:

1

SIXEP CONTINGENCY PLANT (SCP) Spent Fuel Management & Nuclear Materials (SFM&NM) Working Group April 2014 SIXEP CONTINGENCY PLANT (SCP) Simon Wilcock – SCP Project Manager 2

What we will cover What is SIXEP ? Why is it Important ? Why Do We Need a Contingency Plant ? What Options Have We Considered ? What is the Preferred Option ? What is the Project Status ?

What is SIXEP ? Site Ion Exchange Effluent Plant (SIXEP) was built to extract radioactivity from Pond Water prior to discharge of effluent to Irish Sea. Brought into operation in 1985 the plant has been very successful in removing activity from effluent streams very reliably Current main feeds are in support of MOP and FGMSP Pond Water Purge. Water Treatment Plant with extra steps - Process uses Sand Filtration and IX Media.

Why is SIXEP Important ? Pivotal part of the Overall Site Effluent Strategy. Needs to operate to 2050. Without sea discharge treatment capability, delivery of the Magnox Operational Programme, AGR programme and high hazard and risk reduction activities would be severely impacted. High Hazard & Risk Reduction Activities would cease (FGMSP & MSSS), resulting in extended retrievals programmes and time at risk.

Why Do We Need a Contingency Plant ? SIXEP was designed in the mid-70’s and brought online 28 years ago. SIXEP is a unique, ageing single line facility. By 2050 the plant will have been in operation for 65 years. It is considered crucial that provision is made for the inclusion of a SIXEP Contingency Plant to mitigate the risk and consequential impacts should SIXEP become unavailable.

What Options have been Considered ? Do Nothing? Contingency Options Low Scope Medium Scope High Scope SIXEP 2 (Full Replacement) Based upon the balance of cost and risk a decision was made to build the Medium Scope Contingency Option.

Current Status Project delivery team in place. Initial Business Case completed. Project Concept Started. Key Milestones: Project Concept Stage May 15 Preliminary Design Apr 16 Detailed Design Mar 19 Construction Jun 23 Active Commissioning Nov 24