3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.

Slides:



Advertisements
Similar presentations
Annual meeting with the MA of the ETC programmes April 2013 Financial management Juan Lopez Lledo, Budget and Financial mangement, Unit REGIO.A.3.
Advertisements

Health and Safety Executive Health and Safety Executive Extending Cost Recovery at HSE Gordon MacDonald Director of Special Projects.
What happened to climate change in 2010? ActionAid schools | March 2011 What happened to the climate in 2010?
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Update on IDNO/DNO working group DCMF 12 November 2009.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Generation Use of System Charges Nigel Turvey. Background Regulatory incentive allows: Recovery of a percentage of any reinforcement costs A value per.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE Stakeholder Communications for Price Control information and proposed Tariff Change information.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
EDCM update Mo Sukumaran (on behalf of CMG)
Item 3 Formula Review. Formula Review Consultation Simplification Mainstreaming grants Balance of SEN/AEN/Deprivation and impact of Pupil Premium.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
EHV generation charging methodology change Harvey Jones.
Pasadena Water and Power PROPOSED CHANGES TO THE PURCHASED WATER ADJUSTMENT CHARGE (“PWAC”) Item # 13 City Council Meeting June 15, 2015.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Structure of Charges: Update and next steps DCMF 10 September 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
European Developments Transmission Workgroup 3 rd May 2012.
1 Modification 0152V Implementation Matters 25 October 2007.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
User Pays Funding – Potential Licence Mechanism
RIIO-GD1:network charging volatility
NG Strawman – Ofgem Response
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
An Introduction to Balancing Services Use of System Charging (BSUOS)
Holistic view of Charging Modifications – In flight 11th June 2018
For more information, please see our methodology at: 
NTS Entry Charging Review Update
NG Strawman – Ofgem Response
Questions for Consultation
Generation Dominated Areas(GDA)
Transmission Planning Code Review
DNPC07 Proposal DNPC07 proposed that Capacity/Commodity split of the LDZ System Charges should be changed to 100/0 The percentage of the Firm Capacity.
Denis Aitchison/Rob Hetherington
Transmission Workgroup July 2012
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Presentation transcript:

3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators from 1 st October 2010 Extend current methodology of a calculating a “pseudo generation pot” to derive the allowed revenue to also include pre-2005 EHV generation Only include the O&M element under the DG incentive mechanism Adjust the target revenue associated with pre-2005 generation on a pro rata basis to only recover from October to March The geographical areas remain for charging purposes and generator charges are scaled to match the target revenue. This methodology is envisaged to be for an interim period and will be superseded by the implementation of the EDCM. If a pre 2005 generator paid capitalised O&M charges (covering Oct ‘10 - Mar ‘11) they will be exempt from paying DGUoS for this interim period.

SPD * Please note these charges are subject to change before we formally submit our modification report to Ofgem energynetworks.org 23 June 2010 Proposed GDUoS Charges October 2010

SPM * Please note these charges are subject to change before we formally submit our modification report to Ofgem energynetworks.org 33 June 2010 Proposed GDUoS Charges October 2010