NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
LTSEC summer auction Transmission Workstream 6 th April 2006 Dave Adlam, National Grid NTS.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
DRSEC Update Transmission Workstream 06 November 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Transitional Exit Capacity Proposals -Update
Transmission Workstream February 2009
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
Transmission Workgroup – 1st December 2011
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements
Annual Review - Methodology Statements
Simon Trivella – 22nd May 2008 Distribution Workstream
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
MOD Flow Swap Scenario’s – Initial Thoughts
Upcoming Title III Events
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD National Grid NTS Initiated Flow Swaps
MOD Deemed applications – User pays initial thoughts.
Interruptible to Firm – NTS Supply Point Transition
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Assured Pressures Proposal
Flat, flex, assured pressures Network Development Statement
Information Provision for Transitional Exit Capacity
Review: Entry Capacity Transfer and Trade Methodology Statement
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Transmission Workstream, 1 Mar 07
Revised Tender Timescale for DN Interruption Arrangements
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Transmission Workstream 05 November 2009
Indicators regarding the total revenue approved for the period October 2018 – September 2019 a) Total revenue approved by ANRE is allocated by the fix.
MOD Flow Swap Scenario’s – Initial Thoughts
Presentation transcript:

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010

2010 DN Adjustment Window – Brief Overview  31 July-Annual Application Window Closes  15 Sept-National Grid NTS - provides Indicative OCS/OPS Statements DNO Users - have 5 Business Days to seek clarification and resubmit applications for NTS Exit (Flexibility) Capacity, Assured Pressures and NTS Exit (Flat) Capacity  22 Sept-Final date for DNO Users to submit requests  30 Sept-National Grid NTS issues the final Offtake Capacity Statement (OCS) and Offtake Pressure Statement (OPS) and allocate requests for NTS Exit (Flat) Capacity

Proposed Changes  National Grid NTS is proposing to amend the date that the indicative OCS/OPS will be issued from the 15 th September to the 1 st September  DNO Users to be then given [10] Business Days to clarify and/or resubmit applications for NTS Exit (Flexibility) Capacity/Assured Pressures, and submit revised applications for NTS Exit (Flat) Capacity (n.b. only where request for NTS Exit (Flexibility) Capacity/Assured Pressure have been rejected)

2010 Adjustment Window – Current UNC

2010 Adjustment Window – Proposed Changes