NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Enduring NTS Offtake Arrangements Transmission Workstream 5th September 2006.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
DRSEC Update Transmission Workstream 06 November 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Distribution workstream 29th January 2009
Transitional Exit Capacity Proposals -Update
Transmission Workstream February 2009
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workstream, 6 August
Transmission Workgroup – 1st December 2011
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
Capacity Methodology Statements
Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need.
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Update on Exit Capacity Substitution and Revision
Review of Physical Regime Times for Modification Proposal 461
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD National Grid NTS Initiated Flow Swaps
UNC0376S – Increased Choice when applying for NTS Exit Capacity
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream – Partial Assignment
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Flat, flex, assured pressures Network Development Statement
Information Provision for Transitional Exit Capacity
Transmission Workstream 1st February 2007
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Presentation transcript:

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010

DN Adjustment Window – Brief Overview

Proposed Changes – Enduring and Transitional  For both the Transitional and Enduring periods National Grid NTS is proposing to amend existing timeframes so to allow Indicative OCS/OPS to be issued no later than 15 Business Days after the closure of the July Application Window.  For the Enduring period DNO Users to have 10 Business Days, post receipt of the indicative statements, to clarify and/or resubmit applications for NTS Exit (Flexibility) Capacity and/or Assured Pressures. DNOs currently able to submit revised applications for NTS Exit (Flat) Capacity from 15 th September, this is now to be included within the 10 Business Days post receipt of indicative statements. (nb. only applies where request for NTS Exit (Flexibility) Capacity/Assured Pressure have been partially or fully rejected)  For the transitional period the same is true however DNO Users may revise their Flat requirements irrespective of whether the Flex and/or Pressure request has been rejected

Adjustment Window 2010 under current UNC rules Example 1: Based on NG providing indicative OCS/OPS statement on last possible Date (e.g. 15th September 2010)

Adjustment Window 2010 under current UNC rules Example 2: Based on NG providing indicative OCS/OPS statement prior to the last possible date (e.g. 31 st August 2010)

Adjustment Window – Proposed Changes Example 1: Based on NG providing indicative OCS/OPS & (Flat) for transitional period only, on the last possible date (e.g. 20 th August 2010)

Adjustment Window – Proposed Changes Example 2: Based on NG providing indicative OCS/OPS & (Flat) for transitional period only, prior to the last possible date (e.g. 13 th August 2010)

Summary of proposed changes