Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Energy24 limited Modification Proposal 0502: Amendment to Gas Quality NTS Entry Specification at the px Teesside System Entry Point.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
RIIO Gas Transmission Workshop - 5 th Sept Supplementary information 1 Hypothetical examples to illustrate the impact of combining the constraint management.
Modification: Inclusion of as a valid UNC communication Allowing as a valid form of UNC communication in specific circumstances.
Review Group -140 Thoughts on additional information requirements.
DRSEC Update Transmission Workstream 06 November 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 6 January 2011
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Transmission Workgroup 4th October 2012
NTS Entry Charging Review Update
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Discussion on Mod262 and next steps
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
Modification 0333A – implementation info
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Quantity Holders (COR2970) Presentation to UK Link Committee
Force Majeure & Emergencies: Communications by
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
QSEC auction timetable
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
Modification 501 slides for Workgroup
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Interruptible to Firm – NTS Supply Point Transition
Entry Overrun Calculation
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Stefan Leedham Transmission Workstream 2nd November 2006
Transmission Workstream 05 November 2009
Presentation transcript:

Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1

2 1.NGG issued a FM notice on 14 th September in accordance with B3.3.1 of the UNC. 2.Affected feeder 14, downstream of Tockington & will require cessation of flows for a minimum of 3 weeks. 3.As a result Seabank 2 power station will have no firm exit capacity made available for the period but will have to pay charges for the first 7 days (TPD section J 3.6.1). 4.Mod 349: Introduction of a Force Majeure ( Entry) Capacity Management Arrangement, was directed to be implemented by Ofgem on 16 th August Effectively 0349 mod ensures that when FM is called, Entry capacity charges are reimbursed from Day 1. 6.There is a difference of 7 days before reimbursement of capacity charges for FM events between Entry and Exit. Is this equitable? Rational for Raising a Modification

3 Change (TPD section J 3.6.1) such that capacity charges are reimbursed from day 1 of notification of an FM event and not day 7, whereby, aligning Exit & Entry FM capacity arrangements. Intended Outcome

4 Enabling better facilitation of Relevant Objective (a) efficient & economic operation of the pipe-line system: The proposal will require that National Grid NTS share the risk and cost that is currently borne completely by affected Shippers and is likely to assist in reducing any perception that there is an incentive to call Force Majeure. Relevant Objectives

5 1.Does the modification facilitate the achievement of the relevant objectives, efficient & economic operation of the pipeline system? 2.Impact on systems? 3.User Pays? Specific Areas for WorkGroup to Develop

Notification of Force Majeure by Fax Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 6

7 1.NGG tried to issue a FM notice on 14 th September in accordance with B3.3.1 of the UNC – by fax. Correct Fax number but message was corrupted, several attempts required before message received. 2.Did not receive the fax on 16 th September, stating FM started at Received by e mail on 21 st September. 4.Question reliability of using faxes. Better communication by , text. 5.Why do we use faxes in the gas industry? 6.Raise a mod to change all notifications to ? 7.What section of the UNC? Notification by Fax