CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.

Slides:



Advertisements
Similar presentations
Some potential issues with the CDCM Franck Latrémolière CDCM review workshop, 17 May 2011.
Advertisements

July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Update on IDNO/DNO working group DCMF 12 November 2009.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Generation Use of System Charges Nigel Turvey. Background Regulatory incentive allows: Recovery of a percentage of any reinforcement costs A value per.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
EDCM update Mo Sukumaran (on behalf of CMG)
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
10 September 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY Common Distribution Charging Methodology Impact Analysis.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Presentation to DCMF Profiling and Settlement Review Group John Lucas 3 August 2010.
Structure of Charges Year-end review for DCMF 22 November 2007.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Local asset charging arrangements DCMF April 2008.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
CMG and Workstream Update
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
NTS Entry Charging Review Update
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
PARCA Timeline.
Gas Customer Forum DN Interruption Update - Introduction
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Ofgem presentation to Gas Transmission Workstream
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Presentation transcript:

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term charging arrangements (LTCA) for demand and generation customers

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 2 We are seeking to produce a holistic model that will address the charging issues that we are currently facing and is seen to be both rigorous and consistent in its approach. We have formed a project team involving the University of Bath, to develop our position on long-term charging arrangements. The proposals involve: Combining a long-run incremental cost (LRIC) model for EHV customers with the currently approved distribution reinforcement model (DRM) at lower voltages; Removing the current inconsistency in approaches for EHV customers; i.e. EHV (site-specific charges based on actual system configurations and utilisation) and HV/LV (average charges based on a representative model); Developing a consistent demand and generation charging model based on the new LRIC/DRM combined model that could give negative charges to generators; Developing an approach which is flexible enough to support future charging developments and has the potential to produce locational charges at the lower voltage levels. Overview - enhanced long-term charging arrangements

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 3 We are looking to develop a holistic model that will address all of the charging issues that we are currently facing and is seen to be both rigorous and consistent in its approach. Demand and generation charges are based on the same principles. Benefits of generation can be recognised. Flexible enough to facilitate further development. Potential stage one developments on LTCA Average generation LV charges based on a typical representative model (DRM type principles and negative coincidence factors) Operating costs (no scaling) Average generation HV charges based on a typical representative model (DRM type principles and negative coincidence factors) Average demand LV charges based on a typical representative model (DRM type principles) Average demand HV charges based on a typical representative model (DRM type principles) Nodal/locational EHV demand charges based on LRIC outputs Nodal/locational EHV generation charges based on LRIC outputs Revenue reconciliation across all voltage levels to match demand allowances Revenue reconciliation across all voltage levels to match generation allowances

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 4 Current project timeline to implement stage 1 of our LTCA developments Jan-08 Internal sign-off Data to Bath Ofgem decision Feb-08Mar-08Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Ofgem meeting Bath to process sample networks Document proposals and develop consultation paper Charging model development Sample network impact and sensitivity analysis Industry consultation Sub. to Ofgem Run LRIC on full network Full network impact and sensitivity analysis Ofgem meeting Calculation of charges Internal sign-off Charge publication Raise awareness of CE’s plans on long-term charging arrangements Updating Ofgem on progress and agreeing the target implementation date – April or October 2009 The methodology used to calculate charges will be dependent on Ofgems decision – If they decide to consult we may have to produce two sets of charges The proposed timeline is challenging and based on a April 2009 implementation data. We will have a better view of the most realistic implementation date once we have the sample network results from the University of Bath and have started to undertake the modelling of the full network. Stage 1 – represents the development of a LRIC approach at EHV (for demand and generation) and the use of a representative model at lower voltage levels

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 5 Long-term the model should be flexible enough to facilitate locational charges at lower voltage levels for both demand and generation customers. Longer-term plans for LTCA The model needs to be flexible enough to facilitate future developments, which may include; Demand and generation reactive power charges (Import/Export kVA/kVAr); Short haul tariffs for mixed demand and generation developments; and Locational signals further down the network. This could be either LRIC at lower voltages, based on standard network configuration; or The use of a number of locational yardsticks driven from the proposed model.

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 6 April 9, 2008 Potential developments in IDNO charging methodologies

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 7 We are seeking to produce cost reflective IDNO charging arrangements that reflect any avoided costs and losses savings. Initial thoughts on IDNO charging arrangements We are looking to develop IDNO charges that are cost-reflective and calculated using the same principles that are used to derive the charges for other customers (i.e. average charges based on DRM model principles); We are currently considering: Removing capacity charges for IDNO customers so that the boundary tariff has the same structure as the all the way tariffs; Incorporating avoided costs (both operating and capital costs); Incorporating any losses savings that they bring; Creating a new IDNO customer group based on a NHH customer mix that represents the host DNO; and Establishing a typical IDNO load profile so that more representative load and coincidence factors can be established – this will be based on Elexon data.

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 8 The initial problem that occurred when trying to tackle the IDNO charging issue was the lack of actual site data at a useable level of granularity. Our thinking has been developed by asking a number of key questions Implementing this approach results in the following load profile which could be used to establish IDNO yardsticks Establishing what an IDNO look like? How big will a typical IDNO site be in terms of customers? What will the customer mix be like on a typical IDNO site? Can an existing tariff be modified or is a new customer group and tariffs required? How do we develop an IDNO customer group and load profile?

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 9 End User CE - 11kV Network Band 2 (26%-50% of assets) 50% LV yardstick discount Band 1 (1%-25% if assets) 25% LV yardstick discount 75% LV yardstick discount 100% LV yardstick discount Considerations on avoided costs and losses savings 3.85% Losses 3.85% * 25% = 0.96% Displaced from loss factor 3.85% * 50% = 1.93% Displaced from loss factor 3.85% * 75% = 2.89% Displaced from loss factor 3.85% * 100% = 3.85% Displaced from loss factor Band 4 (76%-100% of assets) Band 3 (51%-75% if assets) Avoided cost and losses savings could be built into the IDNO tariff based on the proportion of length of assets that the IDNO would install against the total length of assets to the 11kV network - resulting a discounted IDNO yardstick. Discounting the yardstick will demonstrate both displaced capital and operational costs from the end user charges.

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 10 We will have a better view of the most realistic implementation date once we have consulted with the industry on our proposals. Also, if Ofgem consult on proposals we may choose to implement in April Next steps Finalise our thinking on the typical size of an IDNO size; the most appropriate customer mix; and what costs are avoided; Give some consideration as to whether, or not, there is the potential to move to a unit only charge at the boundary; Gain internal approval to the proposed approach; Documents our proposals; Potential industry consultation in May 2008, which would include a full impact and sensitivity analysis; Finalise proposals in mid June; Submission of modification proposal late June/early July; and Target implementation in October 2008, or a.s.a.p. after Ofgem decided not to veto our proposals.