Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December 2012 1 | Energy Networks.

Slides:



Advertisements
Similar presentations
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
Advertisements

Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
1
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
Performance Management Chapter 10. Performance Management 10-2 Objectives How to View Goals View State Goals View Your LWA Goals Search Goals (including.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Some potential issues with the CDCM Franck Latrémolière CDCM review workshop, 17 May 2011.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
DCUSA Secretariat 7 February 2013
Operating Systems Operating Systems - Winter 2012 Chapter 4 – Memory Management Vrije Universiteit Amsterdam.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Update on IDNO/DNO working group DCMF 12 November 2009.
Capacity to Customers (C 2 C)- Review of Standards – Accommodating Responsive Demand in ER P2/6 24 th January 2013.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
Update from DCUSA Michael Walls DCUSA Secretariat 05 April | Energy Networks Association - DCMF.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 10 Routing Fundamentals and Subnets.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
EDCM update Mo Sukumaran (on behalf of CMG)
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
Clock will move after 1 minute
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Select a time to count down from the clock above
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
Update from DCUSA Elizabeth Lawlor DCUSA Secretariat 01 December | Energy Networks Association - DCMF.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
Distribution Charging Methodologies Forum (DCMF) 27 th DCMF Institute of Physics London 01 December | Energy Networks Association.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
Update from DCMF MIG Simon Yeo Chair – DCMF MIG 01 December | Energy Networks Association - DCMF.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Update from DCMF MIG Michael Walls MIG Technical Secretary 04 August | Energy Networks Association - DCMF.
Update from DCUSA Michael Walls DCUSA Secretariat 02 February | Energy Networks Association - DCMF.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
DCUSA Update ElectraLink. The following Change Report are due to be presented to the DCUSA Panel at its meeting on Wednesday 16 January 2013: DCP 143.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
DCUSA Change Proposals Elizabeth Lawlor DCUSA Panel Secretary 15 February | Energy Networks Association - DCMF.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
CDCM Annual Review 02 February | Energy Networks Association - DCMF Date: 1 March 2012 Venue: Institute of Physics Time: 10:00 – 15:00.
DCMF Distribution Charging Methodologies Forum Institute of Physics Thursday 4 April 2013 Distribution Charging Methodologies Forum Institute of Physics.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
DCMF SIG terms of reference Harvey Jones Elizabeth Lawlor 2 December | Energy Networks Association - DCMF.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
Structure of Charges: Update and next steps DCMF 10 September 2008.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Holistic view of Charging Modifications – In flight 11th June 2018
Generation Dominated Areas(GDA)
DCMF STANDING ISSUES GROUP
Presentation transcript:

Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December | Energy Networks Association - DCMF

Work In progress DCP 130 was raised at the May 2012 DCUSA Panel Meeting the intention of removing the discrepancy between the HH and NHH UMS tariffs, awaiting Ofgem’s decision. For PC1-8 the NHH/HH subgroup is considering an enduring solution, targeted for implementation in April MIG 12, 22 and 02 - Use of HH and NHH forecast data for costing A final report produced by Frontier has been submitted to Ofgem, awaiting Ofgem’s decision. MIG 30 - The introduction of Long Term Products 6 December | Energy Networks Association - DCMF

Open Issues 3 | Energy Networks Association - DCMF 6 December 2012 Due to start 2013 MIG 15 – Time of day time bands to Seasonal time of day time bands Due to start March 2013 MIG 33 – To review the treatment of asset replacement in CDCM Customer Contributions - MIG Issue 41 – The first meeting of the Customer Contributions Group was held on 5 December, if you wish to be added onto this group please ElectraLink Combining Method M and Extended Method M (including mapping of new RRP tables) - will start following the models incorporation into DCUSA (DCPs 128 and 129) Workstream C This will be discussed at the January 2013 MIG meeting MIG 28 – Calculation of excessive reactive power units

Open Issues 4 | Energy Networks Association - DCMF 3 December 2012 The following EDCM Development Issues and Customer Measures are due to start Q1 2013: MIG Issue 42 - EDCM Customer Measure 3 – to assess measures to reduce volatility MIG Issue 43 - EDCM Customer Measure 4 – to provide visibility of cost signals MIG Issue 44 - EDCM Development Issue 1 – Consideration of peak time reactive flows MIG Issue 45 - EDCM Development Issue 2 – LDNO discount on 20% of residual revenue MIG Issue 49 - EDCM Development Issue 3 – Customer Categories – consideration of assets below the voltage of connection MIG Issue 46 - EDCM Development Issue 4 – Capping of LDNO discounts at 100 per cent. EDCM Development Issues and Customer Measures MIG 47 – Application of FCP charges to different customer categories To start following the decision on DCP139 ‘ Non-Application of FCP charge for Category 0000 Customers’, awaiting Ofgem’s decision.

Billing Group Following the work of the DCMF MIG Billing Group nine DCPs were raised at the July 2012 DCUSA Panel meeting 4 of the CPs have went out for voting with the deadline being 7 December 2012 The other 5 CPs are going to the December Panel and will be sent out for voting this month Once the above DCPs have been concluded, the group will begin to consider MIG Issue 16 – De-linking DCMF MIG Billing Group – DCPs 141 to | Energy Networks Association - DCMF 3 December 2012