EDCM update Mo Sukumaran (on behalf of CMG)

Slides:



Advertisements
Similar presentations
Regional Policy Common Indicators: Energy & Climate Change Definitions and Discussion Brussels, 22 nd November
Advertisements

July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
DCUSA Secretariat 7 February 2013
Update on IDNO/DNO working group DCMF 12 November 2009.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
RIIO – ED1 timetable Robert Friel Regulatory Strategy and
Update from DCUSA Michael Walls DCUSA Secretariat 05 April | Energy Networks Association - DCMF.
3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December | Energy Networks.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
Update from DCUSA Elizabeth Lawlor DCUSA Secretariat 01 December | Energy Networks Association - DCMF.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
Update from DCMF MIG Simon Yeo Chair – DCMF MIG 01 December | Energy Networks Association - DCMF.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
Update from DCUSA Michael Walls DCUSA Secretariat 02 February | Energy Networks Association - DCMF.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
DCUSA Update ElectraLink. The following Change Report are due to be presented to the DCUSA Panel at its meeting on Wednesday 16 January 2013: DCP 143.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
DCMF Distribution Charging Methodologies Forum Institute of Physics Thursday 4 April 2013 Distribution Charging Methodologies Forum Institute of Physics.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
DCMF SIG terms of reference Harvey Jones Elizabeth Lawlor 2 December | Energy Networks Association - DCMF.
Local asset charging arrangements DCMF April 2008.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
Structure of Charges: Update and next steps DCMF 10 September 2008.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
LC14 Statement Oliver Day UKPN (on behalf of DNOs) 1 | Energy Networks Association 1 December 2011.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Holistic view of Charging Modifications – In flight 11th June 2018
Generation Dominated Areas(GDA)
Ofgem presentation to Gas Transmission Workstream
Gas Customer Forum 28 July 2008
DCMF STANDING ISSUES GROUP
Presentation transcript:

EDCM update Mo Sukumaran (on behalf of CMG) 1 | Energy Networks Association – DCMF 5 April 2012 1

Current position – EDCM demand The EDCM will be used to calculate import charges for qualifying customers from 1 April 2012 Ofgem has approved the incorporation of the EDCM for import charges into DCUSA (DCP 109) From 1 April 2012, the EDCM for import charges would be subject to open governance 2 | Energy Networks Association – DCMF 5 April 2012 2

Further work on EDCM demand Ofgem placed 3 conditions on its approval of the EDCM for demand. Conditions 1 and 2 have been met and the methodology updated Condition 3 relates to the treatment of spare capacity in calculating network use factors for demand Condition 3 requires the DNOs to: Consider the circumstances under which costs associated with spare capacity on the network may be “socialised” Examine different options for doing so Analyse the impact on customer charges Provide a well-reasoned recommendation for change (or no change) 3 | Energy Networks Association – DCMF 5 April 2012 3

Condition 3 Workstream A of the CMG is working towards meeting condition 3 Several options and their impact on charges are being considered We plan to publish a consultation on these options and their impact on charges in mid-April 2012 DNOs need to submit a report explaining their recommendation to Ofgem by 1 June 2012 Changes to the methodology, if any, are unlikely to affect tariffs before 1 April 2013 4 | Energy Networks Association – DCMF 5 April 2012 4

Current position – EDCM export The EDCM will be used to calculate export charges for qualifying customers from 1 April 2013 Ofgem guidance on the methodology for export charges published on 2 February 2012 DNOs are currently working to develop and submit the methodology by 1 June 2012 Consultation document with our proposals published on 2 March 2012 (Deadline for responses is 12 April 2012) Workshop to support consultation held on 8 March 2012 5 | Energy Networks Association – DCMF 5 April 2012 5

Arrangements for Pre-2005 DG Ofgem published its decision on the arrangements for pre- 2005 generators Generators that “connected” on or before 31 March 2005 would be eligible for a time-limited (25 year) exemption from use of system charges “Designated EHV properties” will default to the exemption from 1 April 2013 (even if they are currently on the CDCM) Other generators (CDCM) will default to being subject to the CDCM Generators that connected on or after 1 April 2005 but were charged for their connection based on “pre-2005” arrangements would also be eligible for the 25-year exemption starting from the connection date 6 | Energy Networks Association – DCMF 5 April 2012 6

Arrangements for Pre-2005 DG Designated EHV properties that qualify for the exemption can “opt in” to charges at any time in the future: Deadline for opting in to charges for 2013/2014 is 30 June 2012 Deadline for future years is 1 November of the preceding year Opting in to charges is a “one way” decision Please contact your DNO before the deadline if you would like to opt in 7 | Energy Networks Association – DCMF 5 April 2012 7

LDNO arrangements Portfolio discounts for CDCM-like generation (export) end users Extended Method M to calculate discounts Methodology approved by Ofgem in December 2011 Charges and credits for EDCM-like generation (export) end users calculated on a “boundary-equivalent” basis LDNOs to provide boundary-equivalent data to the host DNO for charges to be calculated 8 | Energy Networks Association – DCMF 5 April 2012 8