15 November 2013 20 th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.

Slides:



Advertisements
Similar presentations
Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
Advertisements

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
CMP COUNTRY ANALYSIS 13 th SG meeting Madrid 7 th February 2010.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Enagás IT roadmap CAM & CMP 19 July Index CAM IT roadmap CMP IT roadmap.
15 th September 2013 Enagás and TIGF Information to NRAs.
21 st SG meeting 19 th February 2014 Enagás, GRTgaz, REN and TIGF.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
15 th November th SG meeting 2013 VIP Auction Results.
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
GRI South SG Meeting 15 November /11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
Enagás, REnagás, REN and TIGF EN and TIGF IT implementation plans and agreements with PRISMA 25 th IG meeting 13 th December 2013.
1 Madrid, 19 th November th IG Meeting South Gas Regional Initiative.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
PILOT PROJECT FOR CAM HARMONISATION 16 th SG meeting Madrid 31 st May 2012.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
GRI North-West Meeting State of play and (future) functionalities of the PRISMA capacity platform 27 November 2013.
1 13 th December 2013 Teleconference 25 th IG Meeting South Gas Regional Initiative.
European Developments: Capacity Transmission Workgroup 6th October 2011.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
32 nd IG meeting 15 th July 2015 Enagás, GRTgaz, REN and TIGF.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
21 st SG meeting 19 th February 2014 Enagás, GRTgaz, REN and TIGF.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Example for 1:n bundling with three TSOs
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
13th December 2013 Teleconference
26th IG meeting 23th January 2014
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
GRI North-West Meeting
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
29th April 2014 Teleconference
24rd SG meeting 8th february 2018
GRI North-West Meeting
Enagás, GRTgaz, REN and TIGF
26th February 2015 Teleconference
PRISMA General Information
Presentation transcript:

15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms

2 1. VIP Available capacity at the two existing physical IPs between Spain and France, Irún-Biriatou and Larrau, will be offered at a single VIP. This will imply that as from October 2014 for commercial and operational purposes the physical IPs will no longer exist. For the calculation of capacities at the VIP between France and Spain, existing technical capacity at the two existing physical IPs between Spain and France have been aggregated. From 1 October 2014 all existing contracts at the physical interconnection points, Larrau and Biriatou, will be transferred into the VIP between France and Spain. VIP

3 2. Bundled capacity Enagás and TIGF will jointly offer the maximum possible amount of bundled capacity between Spain and France in both flow directions. According to the CAM NC bundled capacity means a standard capacity product offered on a firm basis which consists of corresponding entry and exit capacity at both sides of every interconnection point. This implies: Each standard product offered includes the same amount of capacity. Capacities will be booked through a single allocation procedure. Capacities will be allocated to the same shipper at both sides of the IP. Transactions held on the secondary market must not result in unbundling capacities that were previously offered and allocated as bundled capacities. This does not imply that a single contract will be put in place. Shippers will have to sign a contract with the respective TSO in order to be allowed to participate in the auctions.

4 3. Unbundled capacity The auction for the bundled and unbundled capacity for the same standard capacity product will be carried out simultaneously. If on one side of the VIP the capacity available is firm and on the other side of the VIP the available capacity is interruptible, then capacity will be offered in an unbundled way. If there are interruptible products at both sides of the border, they will be offered in an unbundled way as the conditions for interruption in principle are different on both sides of the IP. For the gas year 2014 day ahead capacity will be also offered in an unbundled way.

5 4. Firm and interruptible capacity All products will be firm unless otherwise stated. Once the auction for the corresponding firm bundled and unbundled product has finished, each TSO will decide whether to offer the corresponding interruptible product in a second slot. The default rule, unless otherwise stated in this document, will be that interruptible products will only be offered if the 100% of the corresponding firm bundled and unbundled product has previously been allocated in the related auctions.

6 5. Standard products The standard capacity products offered by Enagás and TIGF will be those included in Article 9 the CAM NC. The following standard capacity products will be offered from November 2015: Yearly standard capacity products Quarterly standard capacity products Monthly standard capacity products Daily standard capacity products Within-day standard capacity products During the gas year 2014, Enagás and TIGF will offer all standard capacity products except within-day standard capacity products, which will be available from November 2015.

7 6. Auctions 2014 auctions Until the binding application of the CAM NC as from November 2015 the following auctions will be held for bundled and unbundled products: 1.Annual yearly capacity auctions 2.Annual quarterly capacity auctions 3.Rolling monthly capacity auctions Daily products: On TIGF side, they will be allocated through rolling day ahead capacity auctions as unbundled products since October On Enagás side, they will be allocated through FCFS until November 2015 Thus, until November 2015 day ahead capacity will be offered and allocated in an unbundled way auctions and onwards From November 2015, Enagás and TIGF will implement all the auctions included in the CAM NC. Thus, no capacity will be allocated on FCFS basis.

8 7. Auction algorithms Ascending clock auction algorithm For annual yearly, annual quarterly and rolling monthly capacity auctions, an ascending clock algorithm with multiple bidding rounds shall be applied. The ascending clock auction algorithm to be applied is described in Article 17 of the CAM NC. Uniform-Price auction algorithm For rolling day-ahead and within-day capacity auctions a uniform-price auction algorithm with a single bidding round shall be applied. The uniform-price auction algorithm to be applied is described in Article 18 of the CAM NC.

9 8. Booking platform All auctions will be carried out at Prisma booking platform:

10 9. Requirements to participate In order to participate in an auction, shippers and eligible customers licensed in France and Spain (“Shippers”) shall be registered at Prisma booking platform. The requirements for registration are established in the PRISMA General Terms and Conditions (currently under revision so new version of GTCs from 1st January 2014). EIC The first requirement for registration is to have a valid Energy Identification Code (EIC). The EIC consists of 16 characters given to a market party to be identified in the Internal Energy Market in a harmonized way. Since 1 March 2013, ENTSOG is acting as Local Issuing Office for the EIC. The code shall be globally unique: only one code is allocated per organization (business group); the same shipper on both sides of the border will have the same EIC code. 1

11 9. Requirements to participate Registration to use PRISMA According to PRISMA GTCs, the registration process of the shipper and its first user requires the following information to be provided to PRISMA: Energy Identification Code of the shipper (EIC). Company name and address of the shipper. User information: title, last name, first name, telephone number, address Other shipper information: billing address, IBAN, BIC, legal representatives and VAT number. Additional identification code if requested by TSO. Registration to conclude bookings and to participate in auctions Adjacent TSOs on both side of a border must approve users’ registration request. At this stage, TSOs must confirm that the shipper is allowed to operate in their country, according to the regulation national framework (if the shipper has trading license where required, etc...). 2 3

12 9. Requirements to participate Shipper registration process is detailed in the figure below, further information will be provided by Prisma and TSOs.

13 9. Requirements on the Spanish side In order to be able to participate in auctions Shippers must be registered at licensed Shippers in the Spanish system. The requirements and procedure to get the license are detailed by the MINETUR at the following link: Then, Shippers will have to sign the Standard Contract with Enagás in advance in order to participate to the auctions. The Standard Contract will only be signed once during the registration process to conclude bookings and to participate in auctions with Enagás at Prisma booking platform. Capacity allocated to a Shipper at Prisma booking platform will be automatically introduced at the SL-ATR, thus this allocation will be binding for shippers and it will not be necessary to sign any additional document. Once the shipper has been informed of the allocation of capacities, it will be informed of the financial guarantees associated to the contracted capacity he has to put in place in favor of Enagás. These financial guarantees are detailed in Royal Decree 949/2001. No financial guarantees to participate in the auctions will be required.

14 9. Requirements on the French side In order to be able to participate in auctions Shippers must be registered at licensed Shippers in the French system. The requirements and procedure to get the license are detailed by the DGEC at the following link: Then, Shippers will have to sign the Transport Contract with TIGF in advance in order to participate to the auctions. Capacity allocated to a Shipper at Prisma booking platform will be automatically introduced in the Transport Contract (Bordereau de Capacités), thus this allocation will be binding for shippers and it will not be necessary to sign any additional document. Once the shipper has been informed of the allocation of capacities, it will be informed of the financial guarantees associated to the contracted capacity he has to put in place in favor of TIGF. These financial guarantees are detailed in Article 8 Guarantee of Transport Contract General Terms available on TIGF web site. No financial guarantees to participate in the auctions will be required.

Calendar

15 November th SG meeting Thank you for your attention