 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply.

Slides:



Advertisements
Similar presentations
A 2030 framework for climate and energy policies Marten Westrup
Advertisements

Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
1st Ten Year Network Development Plan: ERGEG opinion
ENTSOG’s view on next steps for regional co-operation Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Brussels, 26 Nov 2010.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
David Halldearn Energy Market Insights Limited 5 July 2010.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Gas Regional Investment Plan North West Stakeholder Consultation Presentation 4 th April
EU Developments Transmission Workgroup 3rd November 2011.
Shell Energy Europe Copyright: Shell Energy Europe B.V. What do we do in the GRI NW during the interim phase? GRI NW Region Conference, The Hague, The.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
GRI South SG Meeting 15 November /11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
EU Developments Transmission Workgroup 6th October 2011.
European Developments Transmission Workgroup 1 March 2012.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
TYNDP SJWS #2 Security of Supply – Market Integration TYNDP – 2 nd SJWS 15 February 2012 ENTSOG offices -- Brussels.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
European Developments Transmission Workgroup 3 rd May 2012.
South Region Second Edition
40th IG meeting 29th November 2016
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Gas Regional Investment Plans
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
In depth analysis of TYNDP issues
GTE+ Winter Outlook 2008/2009 Final Version,
Gas Regional Investment Plan North West
In depth analysis of TYNDP issues
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Gas Regional Investment Plan project
40th IG meeting 29th November 2016
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
In depth analysis of TYNDP issues
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply source diversificationDenmark/Sweden  Projects resolving aforementioned issues  For Denmark/Sweden: solved by Project Ellund, see section and  For Luxembourg: work in progress, see section  For South of France: work in progress, see section In depth analysis of TYNDP issues 1

Resilience 2

Supply Source Dependency 3

Supply Source Diversification 4

Resilience Assessment  Potential investment gaps  Germany, Denmark (and Sweden) TYNDP Project Ellund  Capacity extension from Germany to Denmark would solve this issue  Projects were identified through an Open Season in 2009  FID-project Step 1 increase capacity from Oct at a level of 310,000 m³/h  Non-FID project Step 2 increase capacity in 2016 at a level of 500,000 m³/h Update GRIP 2013  Step 2 is now also FID  No investment gap Chapter ‘In Depth Review of TYNDP Identified NW Issues’: Example 5

 Procedures followed to define investment projects  Past and present projects (FID)  Possible future projects (non-FID)  Maps  Matrix  Explanation how the matrix works in conjunction with the appendix Background to NWE Projects 6

Matrix – how it works 7  Step 1: look up the IP number on capacity map  Step 2: goto matrix and find IP number (ascending order)  Step 3: find TYNDP code(s) of project(s)  Step 4: with TYNDP code and country goto appendix (countries in alphabetical order, within country in alphabetical order of TYNDP code)

S&D  Demand uncertainty  Energy efficiency measures taken in member states are part of the demand figures of the NW GRIP report  But major uncertainty in heating market is outside temperatures. Elasticity for domestic heating market on price is low. Implementation of draft RCC feedback September 4 th 8

Matrix – how it works 9  Step 1: look up the IP number on capacity map  Step 2: goto matrix and find IP number (ascending order)  Step 3: find TYNDP code(s) of project(s)  Step 4: with TYNDP code and country goto appendix (countries in alphabetical order, within country in alphabetical order of TYNDP code)

 TSOs are aware of TYNDP identified issues  Germany/Denmark/Sweden solved, RFO 2016  Vulnerable position of Sweden improved but not solved. Solutions identified but not decided  Luxembourg congestion identified but not solved  Price spread between PEG Nord and PEG South identified, solutions being analysed  Enduring importance of gas, but increasing import dependency  Depleting L-gas sources in Germany and the Netherlands trigger L-gas market conversion  Role of gas in power generation and increasing contribution of RES adds to the challenges in flexible gas supply and transmission  Further challenges to network development due to decreasing long term transmission capacity commitments Conclusions 10

11 NW GRIP 2013 Timeline - future  Publish report, start consultation phase  GRIP workshop ENTSOG  GRI NW presentation  End consultation phase  Review of feedback  ENTSOG discussions future GRIPs  New NW GRIP 2015 Nov Nov 28 Nov 1 st Jan

Questions? 12