1 Madrid, 19 th February 2014 21 st SG Meeting South Gas Regional Initiative.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

1 Harmonization of Cross Border Transmission Tariffs between Portugal and Spain (CNE/ERSE) Public hearing 15 th SG Meeting S-GRI Madrid, 7 th February.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
1 Madrid, 15 th November th SG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative.
1 19 th June videoconference 23 rd IG Meeting South Gas Regional Initiative.
1 Madrid, 19 th November th IG Meeting South Gas Regional Initiative.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
1 Madrid, 27 th Sep th SG Meeting South Gas Regional Initiative.
1 Madrid, 30 th April th SG Meeting South Gas Regional Initiative.
18th SG Meeting South Gas Regional Initiative
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
1 South Gas Regional Initiative 14 th Stakeholders Group meeting Madrid, 11 th July 2011.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
29th November 2016 Teleconference
20th SG Meeting South Gas Regional Initiative
21st IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
20th April 2016 Teleconference
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
20th April 2016 Teleconference
South Gas Retional Initiative
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
20th April 2016 Teleconference
29th April 2014 Teleconference
4th October 2016 Teleconference
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
24th January 2017 Teleconference
37th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
South Gas Retional Initiative
Presentation transcript:

1 Madrid, 19 th February st SG Meeting South Gas Regional Initiative

2 Agenda

3 II. Capacity Allocation Mechanisms Area of workResponsibleStartingDeadline OSP France-Spain: annual allocation of short-term capacities TSOsNov. (yearly)Dec. (yearly) CAM harmonisation proposal PT-SPNRAs-TSOsJan Jun (COMPLETED) CAM harmonisation proposal in the whole regionNRAs-TSOsJan. 2012Dec Set up a common TSO Allocation Platform: Roadmap and Implementation TSOsJul. 2012Dec II OSP ST between France and Spain II.2. Status of regulatory framework to develop auctions in the Region II.3. Arrangement for the first auction II.3.1 Using PRISMA: training session, shipper’s registration. II.3.2 Auction details for yearly products: capacity offered, bidding rounds, price steps, contracts, etc.

4 II. Capacity Allocation Mechanisms II OSP ST between France and Spain (for information by TSOs)

5 II.2. Status of regulatory framework to develop auctions in the Region (for information by Regulators) II. Capacity Allocation Mechanisms

6 II. CAM Spain: a CNMC Circular has been approved on 12 February. It will be published in the BOE (Bulletin Official of the State). “Circular 1/2014, de 12 de febrero de 2014, de la Comisión Nacional de los Mercados y la Competencia, por la que se establecen los mecanismos de asignación de capacidad a aplicar en las conexiones internacionales por gasoducto con Europa” France: a CRE Deliberation has been approved on 13 February. “Deliberation of the Commission de Régulation de l’Énergie of 13 February 2014 on rules for the progressive implementation of the European network code on the allocation of gas transmission capacity at interconnection points between entry-exit systems” Portugal: The Information Memorandum elaborated by Spanish and Portuguese TSOs, in coordination with NRAs, was submitted to Public Consultation. ERSE will approve the document and will be published by the end of this week “Coordinated implementation of the Network Code on Capacity Allocation Mechanisms. Information Memorandum. January 2014” II.2. Status of regulatory framework to develop auctions in the Region

7 II. Capacity Allocation Mechanisms II.3. Arrangement for the first auction (for information by TSOs) II.3.1 Using PRISMA: training session, shipper’s registration. II.3.2 Auction details for yearly products: capacity offered, bidding rounds, price steps, contracts, etc. (for information by TSOs)

8 III. Congestion Management Procedures III.1. Supervision of CMP implementation in the SGRI Area of workResponsibleStartingDeadline CMP harmonisation in the whole regionNRAs-TSOsOct 2012Oct.2013 CMP harmonisation in the whole region (including UIOLI firm ST) NRAs-TSOsOct 2012Jul. 2016

9 III. Congestion Management Procedures III.1. Supervision of CMP implementation in the SGRI (for information by Regulators)

10 III. Congestion Management Procedures  The ACER Monitoring Report on CMP implementation is in process, according to CE Decision of 24 August 2012 : To check the legal implementation of CMPs (implementation deadline was 1 Oct 2013) To receive TSO data on contractual congestions and occurrences for each applied CMP, that resulted in an offer of capacity, in order to elaborated the ACER Congestion Report – the publication is expected by the end of February.  For those objectives, an online survey was launched by ACER/TF CAM: TSOs answer the questions by mid February. NRAs will review the answers and complete their part by the end of February. The responses will be analysed and evaluated. The Report on CMP implementation will be finished by May/June.

11 IV. Developing hub-to-hub trading in the South region IV.1. Iberian Gas Hub: update on the study on models for integration of the Spanish and Portuguese gas markets (for information by Regulators) Area of workResponsibleStartingDeadline Hub developmentNRAs-TSOs- stakeholders Jan.2013Dec Hub-to-hub gas trading in the regionNRAs-TSOs- stakeholders Jan.2014Dec.2014

12 IV.1. Iberian Gas Hub: update on the study on models for integration of the Spanish and Portuguese gas markets 0. GENERAL OBJECTIVE. In order to assess the feasibility for the development of a gas hub, the study analyzes different aspects of the current gas market situation in Spain and Portugal, including prices in the gas market, as the most important factors.. The study covers three different models for Iberian gas market integration, comparing the advantages and disadvantages for each model.  Market Area Model.  Trading Region Model.  Market with Implicit Capacity Allocation.

13 1. The Market Area Model (full integration) Market Area A Country A Country B Market Area AB Cross- border market area National market area Final customers (A) Final customers (B) VP Final customers (A) VP Features. The adjacent transmission and distribution networks situated in the same geographical area (and well interconnected) are forged into a single entry/exit system.. The market area includes all gas transmission and distribution systems of participating countries (one single market area).. The market area enables a single wholesale market with a single virtual point.. The market region has a single balancing system (with a single balancing entity and balancing rules). IV.1. Iberian Gas Hub: update on the study on models for integration of the Spanish and Portuguese gas markets

14 2. The Trading Region Model (full integration, except balancing) Country ACountry B Trading Region AB End user zone A End user zone B Final customers (A)Final customers (B) VP Features:. The adjacent transmission and distribution networks that are situated in the same geographical area and that are well interconnected are forged into a single entry/exit system with a single virtual point.. The Trading Region has two end-user balancing zones. The balancing in each end-user zone is performed according to the respective national rules (imbalances are managed by the national balancing entities). IV.1. Iberian Gas Hub: update on the study on models for integration of the Spanish and Portuguese gas markets

15 3. Common Wholesale market with implicit allocation of capacity Features:. A certain amount of the interconnection capacity is reserved for implicit allocation.. In this model, gas trade and allocation capacity are assigned simultaneously via a gas exchange (or a gas trading platform).. The implicit allocation mechanism will allocate cross- border capacity on the basis of the bids and offers to buy and sell gas on a functioning gas exchange on either side of the border. Thus, capacity allocation (and gas flow) will follow the market signals. Market participants make “bids” and “offers” for buying or selling of gas Interconnection capacity is being reserved for implicit allocation The implicit mechanism matches those bids and offer with the highest price differences Capacity is automatically assigned once a trade is made until cross-border capacity is sold out or prices have converged IV.1. Iberian Gas Hub: update on the study on models for integration of the Spanish and Portuguese gas markets

16 4. Preliminary evaluation of the models Market Area ModelTrading Region Model Wholesale market with implicit allocation of capacity Requires substantial legal and regulatory alignment among Spain and Portugal (implementation will take many years). Requires very good interconnection capacity. Can be considered a long term objective for the Iberian Market. Requires substantial legal and regulatory alignment among Spain and Portugal. Requires very good interconnection capacity. Co-habitation of one single virtual point with two end-user balancing zones (possibly with different balancing rules) is really a challenge. Can be applied with limited interconnection capacity (the markets will decouple when the interconnection capacity is fully used). Does not require a high level on harmonization of national legislations (implementation can be faster). Will directly promote market liquidity in the common Iberian gas hub. Can be a first step for the Iberian gas market integration. IV.1. Iberian Gas Hub: update on the study on models for integration of the Spanish and Portuguese gas markets

17 V. Next NC implementation V.1. Balancing and Interoperability: implementation priorities (for information by TSOs) (for discussion)

18 VI. Infrastructures Area of workResponsibleStartingDeadline Regular update and publication in CEER website of project status of OS 2013 and 2015 TSOs-NRAsDec. (yearly)Jun. (yearly) Drafting of the South Regional Investment Plan 2012TSOsJul Jan (COMPLETED) Feedback to ENTSO-G on contents and methodology of the regional investment plan NRAsJan Jul (COMPLETED) Input to ENTSO-G for the Community-wide TYNDP 2013 TSOsJan. 2012Apr Creation of a working group in the region in order to test the process of PCI identification NRAs -TSOsMar. 2012March 2013 Drafting of the South Regional Investment Plan 2014 TSOsJan. 2013Apr VI South Gas Regional Investment Plan (GRIP) VI.2 Regulators’ opinion on 2013 GRIP

19 V South Gas Regional Investment Plan (GRIP) (for information by TSOs) VI. Infrastructures

20 VI.2. Regulators’ opinion on 2013 GRIP (for information by Regulators) VI. Infrastructures

21 VI.2. Regulators’ opinion on 2013 GRIP The Draft 2013 South GRIP was submitted to Public Consultation until 20 Jan The Regulators in the Region adopted their Opinion on 30 Jan:  General comments Data on demand and regional supplies are referred to 2011 (updated with 2012 is recommended). Some wording clarifications and sources references in figures/tables. Consistency in the scenarios considered: further description.  Demand forecast Welcome the revision of the demand forecast taking into account the current economic situation in the Region. It would be useful to have a clear picture on the overall demand trends.  Comments on: Supply, Infrastructure, Capacity Subscription (data revision is advisable) and Economic aspects (more data on cost of the foreseen projects) VI. Infrastructures

22 Next meetings: 27 th IG meeting: 28 March - telco 28 th IG meeting: 30 April - telco 22 nd SG meeting: 21 May VII.AOB and next meetings