Purpose Scope Debriefing is a concept of providing a “Feedback point” to the program manager of the project scope and those who were involved in preparing.

Slides:



Advertisements
Similar presentations
SADC Regional Science, Technology and Innovation (STI) policy review and Statistics meeting Republic of Zambia Ministry of Science, Technology and Vocational.
Advertisements

U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Monterey Peninsula Water Management District 1 Provide Policy Direction on Scope of ASR EIR Item 16 March 21, 2005 Regular Meeting Staff Contact: Henrietta.
Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1Information Technologies.
2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.
Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
The Information School at the University of Washington IMT 582 Readiness Assessment Bob Boiko UW iSchool ischool.washington.edu Metatorial Services Inc.
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
Whistleblower Project Mr. Mainord’s World History Class Class: Group Members: Team Lead- Research Lead- Quality Control Lead- Creative Design Lead-
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
Overview of FDOT’s Long Range Estimating System 2005 TEA Conference November 4, 2005 Daytona Beach, Florida.
Project Plan Development
Planning. SDLC Planning Analysis Design Implementation.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Effective Meeting Agendas. Why? Guide Focus Etc. What? Purpose Topic Etc. How? Think Write.
WCI LEA UPDATE MAY 2, 2014 RI Department Of Education Wireless Classroom Initiative Cynthia Brown, Director Office of Statewide Efficiencies Craig Hockenbrough,
9 Closing the Project Teaching Strategies
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
Time & Expense Forms MRC Consulting. Project Goals Provide an automated web based Time & Expense reporting system for MRC Consulting and its clients.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Travel Website Enhancement Project Project Update First Name Last Name.
ICMM CD Toolkit # 13 CR TOOLKIT WORKSHOP COMPETENCIES ASSESSMENT Ref- ICMM CD Toolkit # 13 Trainers: Kuam Sanewai & Andrew Mari Date: 7 th Nov 2013.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
Chapter 12 Project Communication and Documentation
New Tools in an Old Company PMI Honolulu Chapter Meeting June 20, 2007.
MODULE B: Case Report Forms Jane Fendl & Denise Thwing April 7, Version: Final 07-Apr-2010.
Overview Lifting the Curtain - Debriefings FAI Acquisition Seminar.
Strategies for Technical Communication in the Workplace
Efficient Meetings Cassandra Groen BSCE ‘09 MSCE ‘11 Research Engineer II Industrial Engineering South Dakota School of Mines and Technology Thursday,
Project Status Report Presenter Name Presentation Date.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Meet and Confer Rule 26(f) of the Federal Rules of Civil Procedure states that “parties must confer as soon as practicable - and in any event at least.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Develop Project Charter
Insert Slide Title Here Insert Name and Date Here Subject to Consultation.
Meeting Management/Planning. Today Go over basics of meeting management Introduce key elements of creating a plan.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Chapter 12 Auditing Projects.
Data Coordination Working Group (DCWG). 2  Met with EIA  Discussed DCWG Scope  Reviewed Action Items from the Last Meeting  Discussed DCWG Work Plan.
PQRI Project Update Title of Work Project Date of Submission.
Engagement Report Update July 20, 2012 Readiness & Metrics Workstream Jodi Woods Elizabeth Aguilar.
Utility Exceptions “Keys to Success”. 2 Utility Exceptions “Keys to Success” “Where compliance with a Policy, roadway design criteria or standard is impractical,
Agenda 1. Key Activities, Accomplishments and Status 2. Meeting Notes and Action Items.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Types of Reports Introductory Report Progress Reports Incident Report Feasibility Report Marketing Report Field Report Laboratory Report.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
A POCKET GUIDE TO PUBLIC SPEAKING 4 TH EDITION Chapter 32 Technical Courses.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
PRODUCT VERIFICATION Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Project Management.
Sample Fit-Gap Kick-off
Software Configuration Management
Part II Project Planning © 2012 John Wiley & Sons Inc.
IS&T Project Reviews September 9, 2004.
Conduction of a simulation considering cascading effects
Software Engineering I Fall 2017
Software Engineering I Fall 2017
<Project Name> Milestone Summary Report
How we got to where we are today.
Chapter 12 Project Communication and Documentation
Record your QUESTIONS as your read.
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Schedule (Major Deliverables and Milestones)
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
IRS Circular 230 Required Notice--IRS regulations require that we inform you that to the extent this communication contains any statement regarding federal.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Purpose Scope Debriefing is a concept of providing a “Feedback point” to the program manager of the project scope and those who were involved in preparing the scope. Whether it’s a resurfacing project, a safety projects or a major capacity project out of PD&E, our goal is to provide a specific point in the design schedule where you the EOR and the program manager for the scope can sit down and review what assumptions and recommendations held true in design and what changed. The reasons for the changes and other performance measures, such as LRE cost changes, will be captured into a database for posterity and organizational learning.

Who FDOT Program Manager Technical Scope Team for subject project FDOT Project Manager Consultant Project Manager Consultant Engineer of Record Transportation Systems Manager

What The agenda should include: - Description of original scope of work. - Changes to the scope since the “P.E. Begin” date. - Impacts to the LRE. - Impacts to the Project Schedule. - Impacts to the Design Cost. - Reasons for change. - What could have been done to avoid the change.

What (Cont.) The base performance measures of “Scope Changes” “LRE Increase” and “Schedule Increase” will be tracked by a spreadsheet database created and managed by Amir Asgarinik.

When For Major Projects, Scope Debriefing will be included in the agenda for the “Initial Design Team Meeting (Phase II).” For District-Wide Projects, Scope Debriefing will be included in the agenda for the “Project Status Update Meeting”. The FDOT Project Manager will be responsible for including and covering it in the agenda.

When (Cont.) If required by the Project Manager/EOR, additional Scope Debriefing can take place at any time during the Design Phase, prior to the designated times outlined above.

Conclusion These measures, along with Scope Debriefing Comments will be shared with all Program managers, FDOT Project Managers, Consultant Project Managers, Scope Teams, etc. in order to develop and enhance best practices which will be used to improve our scope development process.