Florida Department of Environmental Protection Petroleum Cleanup Program Contamination Notification Training February 2009 Charles T. Williams Environmental.

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

John Slavich Guida, Slavich & Flores, P.C. 750 N. St. Paul Street, Suite 200 Dallas, Texas
June 27, 2005 Preparing your Implementation Plan.
1. 2 Partners in Procurement Steve Hagar Deputy Director Central Purchasing Division Department of Central Services August 24th, 2009.
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
RECORD KEEPING Cooperative Development of Operational
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
Foreign Air Operator Validation & Surveillance
IEC Technical Guidance Training
IEC C ASE S TUDY PRESENTED BY: Mark D. Fisher, CHMM, LSRP Principal – The ELM Group, Inc.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Session I Chapters 1-5 Presented by… Lynn Boyer, Ph.D.
Some slides in this presentation were excerpted from US Eds February 2009 PowerPoint presentation titled: Help! Im a New Title I Director. What Do I Need.
1 Title I Hiring Requirements for Paraeducators and Parental Notification of Teacher and Paraeducator Qualifications Regional Technical Assistance Sessions.
August 6, To Understand: Budget Requirements Budget Template Budget Approval Process, Notifications and Timeframe To walk through the completion.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Create an Application Title 1A - Adult Chapter 3.
606 CMR 14.00: Background Record Checks What you need to know!
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Department of Environmental Protection CLEAN FILL POLICY
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Grants 3.0 Departmental Administrator Review January 22, 2014.
Briefing to the Select Committee on Security and Constitutional Development 11 February
Integrify 5.0 Tutorial : Creating a New Process
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Land Remediation Section – Environmental Management Branch Update on Contaminated Sites Changing Legislation John E.H. Ward Land Remediation Section Ministry.
Shared Work Employer Representative Orientation 1.
Promotion and Tenure Workshop 1. Evaluation Procedure There is only one evaluation procedure leading to recommendations regarding promotion, tenure and.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
EMS Checklist (ISO model)
Management Plans: A Roadmap to Successful Implementation
State Waters and Stream Buffers
The COGCC APD/LGD Process and Recent Changes
What it takes to sign your contract Heather Kelley Contracts & Administrative Services Manager.
Test Monitor Training Administering Minnesota Assessments.
1 Proposed Rulemaking to Implement Provisions of the Federal Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA February 20,
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
Winocular Handbook Department of Human Resources Initiate Personnel Requisition Form Budget Holder Approval Special Ed Position? Supervisor of Budget Review.
A Procedure for Major Consulting Services Contracts February 8, 2008.
FAA Office of Airports Airport Fuel Storage and Handling
Mississippi Special Education Advisory Panel Annual Report to the State Board of Education July 2009.
2012 PRESIDENT’S PRESENTATION COMMON MISCONCEPTIONS LEAGUE REQUIREMENTS LITTLE LEAGUE FORMS ELECTION PROCESS MISCELLANEOUS.
New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.
Chapter 5 Test Review Sections 5-1 through 5-4.
Brief introduction to Secondary Care SOAR users Last updated: 13 th December 2012.
25 seconds left…...
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction California Department of Education Special Education Self-
Week 1.
We will resume in: 25 Minutes.
Revision of WIPO Standard ST.14 Committee on WIPO Standards, third session Geneva 15 – 19 April 2013 Anna Graschenkova Standards Section.
Annual Register Verification Training Presented By: OFFICE OF AUDITOR GENERAL New York City Department of Education.
Drycleaner Workshop September 30, 2010 G. Nell Tyner, Ph.D., P.G. Manager, Waste Cleanup Section DEP Southwest District.
N. C. Department of Environment and Natural Resources Division of Waste Management Stony Hill Road Contamination Wake County.
NJDOE Testing for Lead in School Drinking Water
Noticing Package NOTICING PACKAGE Melike Altun, EM.
Florida Department of Environmental Protection Petroleum Cleanup Program Contamination Notification Training February 2009 Charles T. Williams Environmental.
York BPSS Administrative Services Contractor
Student Records Montana Association of School Business Officials
Presentation transcript:

Florida Department of Environmental Protection Petroleum Cleanup Program Contamination Notification Training February 2009 Charles T. Williams Environmental Administrator Petroleum Cleanup Section One Bureau of Petroleum Storage Systems 1

Contamination Notification Training I.Types of Contamination Notification Initial Notice of Contamination Initial Notice of Contamination Subsequent Notice for TPOC Subsequent Notice for TPOC Noticing for School Properties Noticing for School Properties II.Governing Statutes, Rules & Guidance ss , F.S. ss , F.S. Chapter , F.A.C Chapter , F.A.C DWM Guidance & Procedures DWM Guidance & Procedures III.Changes From Prior Noticing Guidance IV. Specific Noticing Requirements 2

Types of Contamination Notification 3 Initial Notice of Contamination Beyond Property Boundaries Initial Notice of Contamination Beyond Property Boundaries –By Person Responsible for Site Rehabilitation (PRSR) to DEP/CHD/T&L of Source Property –By DEP to Record Property Owners (RPOs) Subsequent Notice of Contamination Beyond Property Boundaries for TPOC Subsequent Notice of Contamination Beyond Property Boundaries for TPOC –By PRSR to RPOs/CHD Notice of Contamination at a School as Defined in Section , F.S. Notice of Contamination at a School as Defined in Section , F.S. –By DEP to School Board Chair (Superintendent)

Governing Statutes, Rules & Guidance 4 Section , F.S. (2005) Section , F.S. (2005) –Subsection 2): Initial Notice of Contamination 10 days - PRSR notice to DWM/Dist/CHD/Source T&L 10 days - PRSR notice to DWM/Dist/CHD/Source T&L –Subsection 3): Department’s Noticing Responsibilities (Initial & School Board Notices) 30 days - DEP notice to RPOs & school board chair 30 days - DEP notice to RPOs & school board chair 30 days - School board chair notice to P/T/G’s 30 days - School board chair notice to P/T/G’s Repeat Every Year – School board notice to P/T/G’s Repeat Every Year – School board notice to P/T/G’s

Governing Statutes, Rules & Guidance 5 Chapter , F.A.C. (12/27/07) Chapter , F.A.C. (12/27/07) –Section 220: Initial Notice of Contamination –Form (3): Initial Notice Form –Section 690 & 700: TPOC Notice Prior to NAMP/RAP approval - 30 day comment period Prior to NAMP/RAP approval - 30 day comment period Repeat every 5 years unless notified that no longer affected Repeat every 5 years unless notified that no longer affected DWM Noticing Guidance & Procedures (11/14/08) DWM Noticing Guidance & Procedures (11/14/08) –Statute & Rule Noticing –Expanded Noticing (State-funded & schools) –FAQ’s

Changes From Prior Noticing Guidance 6 11/14/08 DWM Guidance Supersedes Prior Version Dated 12/21/07 11/14/08 DWM Guidance Supersedes Prior Version Dated 12/21/07 State-Funded Cleanup Sites Only State-Funded Cleanup Sites Only –If no plume map, initial notice expanded to include properties within 250’ radius of confirmed samples *(GW & SW only, not Soil) –Initial notice for suspected properties (plume map & 250’ radius) expanded to residents, tenants & non-occupant RPOs – Initial notice update required if no TPOC notice or SRCO issued within 5 years of original

Changes From Prior Noticing Guidance 7 Non-Program Sites Non-Program Sites –If SM anticipates need in community with exceptional interest in contamination, may recommend that PRSR provide expanded notice If PRSR does not comply, District Director may recommend by Department If PRSR does not comply, District Director may recommend by Department School Sites (regardless of PRSR status) School Sites (regardless of PRSR status) –Expanded to include private schools K-12 Recommend they notify P/T/G’s Recommend they notify P/T/G’s –Expanded to include schools with suspected contamination based on s&s plume map Recommend they notify P/T/G’s Recommend they notify P/T/G’s

Initial Notice of Contamination 8 PRSR Notifies DEP-DWM Within 10 days of Initial Discovery of Contamination Beyond Boundaries - Form (3), F.A.C. PRSR Notifies DEP-DWM Within 10 days of Initial Discovery of Contamination Beyond Boundaries - Form (3), F.A.C. PRSR Provides Copy of Same Notice to the DEP District, County Health Department (Environmental Health Director) & Lessees and Tenants of the Cleanup Site Property Concurrent w/Notice to DEP-DWM PRSR Provides Copy of Same Notice to the DEP District, County Health Department (Environmental Health Director) & Lessees and Tenants of the Cleanup Site Property Concurrent w/Notice to DEP-DWM –Note copy to lessees & tenants excludes off-site property information (page two of Form)

Initial Notice of Contamination 9 Statute & Rule Require PRSR to Submit “Initial Notice” for Properties “Confirmed” above CTLs Based on Lab Analytical Results Statute & Rule Require PRSR to Submit “Initial Notice” for Properties “Confirmed” above CTLs Based on Lab Analytical Results Statute & Rule Require DEP to Send Copy of Initial Notice (or its equivalent) to RPOs of “Confirmed” Properties Within 30 Days Statute & Rule Require DEP to Send Copy of Initial Notice (or its equivalent) to RPOs of “Confirmed” Properties Within 30 Days For Active State-Funded Cleanup Sites, the DEP Site Manager Fills the Role of the PRSR, But May Task Preapproval Contractor For Active State-Funded Cleanup Sites, the DEP Site Manager Fills the Role of the PRSR, But May Task Preapproval Contractor –Template B.5: Notice of Disc. of Cont. Package (Initial or TPOC) - $270.59

10

Initial Notice of Contamination 11 State-Funded Cleanup Sites are Subject to “Expanded Initial Notice” per DWM Guidance State-Funded Cleanup Sites are Subject to “Expanded Initial Notice” per DWM Guidance Two Types of Expanded Notice Two Types of Expanded Notice –Properties “Suspected” to be contaminated above CTLs in any media based on a plume map signed and sealed by a Fla. licensed P.G. or P.E. Site Managers are required to identify these properties Site Managers are required to identify these properties –If plume map not yet available, properties within a “250-Foot Radius” of the location of each “Confirmed” off-site sample (GW or SW only) York will identify these properties York will identify these properties

Initial Notice of Contamination 12 Expanded Initial Notices Sent to: Expanded Initial Notices Sent to: –Residents, Tenants & Non-Occupant RPOs –York will determine these entities Other Expanded Initial Notice Provisions Other Expanded Initial Notice Provisions –If property has multiple or large buildings, only current residents, tenants and non-occupant RPOs of those buildings or units within large buildings that fall within 250 feet of confirmed sample location require expanded notice –If TPOC notice or SRCO have not been issued within 5 years, require updated initial notice

13

Initial Notice Form – (3) 14 Attach “Contaminant Data Tables” for Each Contaminated Medium (groundwater, soil, surface water or sediment) Listing: Attach “Contaminant Data Tables” for Each Contaminated Medium (groundwater, soil, surface water or sediment) Listing: –Sample locations & dates –Names of COCs detected above CTLs –The corresponding CTL If multiple CTLs exceeded, list health based CTL If multiple CTLs exceeded, list health based CTL Toluene (40/1400), Ethylbenzene (30/700), Total Xylenes (20/1400), Acenaphthene (20/420) Toluene (40/1400), Ethylbenzene (30/700), Total Xylenes (20/1400), Acenaphthene (20/420) –The reason for the CTL Health Based or Taste & Odor for groundwater Health Based or Taste & Odor for groundwater Leachability or Residential Direct Exposure for soil Leachability or Residential Direct Exposure for soil

Initial Notice Form – (3) 15 Attach Copies of Analytical Reports Attach Copies of Analytical Reports Attach Vicinity Map Showing: Attach Vicinity Map Showing: –Locations, dates, types of samples collected –Analytical results for each sample –Property boundaries of cleanup site –Real properties at which contamination was discovered Enter Information for Cleanup Site Enter Information for Cleanup Site –Property address & DEP Facility # –Property owner name & contact information

Initial Notice Form – (3) 16 Enter Information Regarding Actions Taken in Response to Discovered Contamination Enter Information Regarding Actions Taken in Response to Discovered Contamination –Cleanup actions –Offer/provide alternate water supply Complete Separate Page Two for Each Parcel at Which Contamination was Discovered*: Complete Separate Page Two for Each Parcel at Which Contamination was Discovered*: –Property address and parcel ID# –Names, address and phone # of record owner(s) –Date contamination discovered on that property Site Manager Should Sign Form as PRSR Site Manager Should Sign Form as PRSR

17

Subsequent Notice for TPOC 18 Sections &.700 Require DEP Approval to Establish a TPOC During: Sections &.700 Require DEP Approval to Establish a TPOC During: –Natural Attenuation Monitoring; or –Active Remediation Prior to DEP Approval of NAMP or RAP, PRSR Must Provide Actual Notice to: Prior to DEP Approval of NAMP or RAP, PRSR Must Provide Actual Notice to: –County Health Department; and –All RPOs of property into which TPOC is allowed to extend Includes confirmed and suspected based on plume maps from reports signed & sealed by Fla. P.G. or PE. Includes confirmed and suspected based on plume maps from reports signed & sealed by Fla. P.G. or PE.

Subsequent Notice for TPOC 19 TPOC Notices Must Include: TPOC Notices Must Include: –Proposed agency action –Location of cleanup site –Name & address of PRSR –Location of relevant technical documents –Name & address of DEP or LP Site Manager –Paragraph including statement “Persons receiving this notice shall have the opportunity to comment on the Department’s proposed action within 30 days of receipt of this notice”

Subsequent Notice for TPOC 20 PRSR Must Provide Copies of All TPOC Notices to DEP as Proof of Compliance PRSR Must Provide Copies of All TPOC Notices to DEP as Proof of Compliance For Active State-Funded Cleanup Sites, the DEP Site Manager Fills the Role of the PRSR, But May Task Preapproval Contractor For Active State-Funded Cleanup Sites, the DEP Site Manager Fills the Role of the PRSR, But May Task Preapproval Contractor –Template B.5: Notice of Disc. Of Cont. Package (Initial or TPOC) - $ –TPOC notices are handled at Site Manager level and do not involve DWM or York

Subsequent Notice for TPOC 21 Additional TPOC Notice Must Be Provided Additional TPOC Notice Must Be Provided –Once Every 5 Years Updating the Status of Site Rehabilitation to the Same Classes of Persons Who Received the First TPOC Notice, Unless They Have Been Informed That the Contamination No Longer Affects Their Property TPOC Wells Do Not Need to be BDL TPOC Wells Do Not Need to be BDL –If clean enough to consider plume delineation complete (very low levels) OK to use for TPOC

Department’s Statutory Noticing Requirements For School Properties 22 If Contamination is Discovered at the Site of a School (originated or migrated) as Defined in Section , F.S., Department Must Send Notice to the Chair of the School Board If Contamination is Discovered at the Site of a School (originated or migrated) as Defined in Section , F.S., Department Must Send Notice to the Chair of the School Board –K-12 public schools, charter schools and schools that include McKay Scholarship students –Notice directs the school board to provide actual notice to teachers and parents or guardians of students attending school –Notice shall include sources of additional information and phone number for inquiries

Department’s Statutory Noticing Requirements For School Properties 23 School Board Notices From DEP to the School Board School Board Notices From DEP to the School Board –Must Include the Same Information Meet the Same Turnaround Time as the “Initial Notice of Discovery” School Board Notices to P/T/G’s School Board Notices to P/T/G’s –Must Include the Same Information as the “Initial Notice of Discovery” and be Provided at Least Annually During Site Rehabilitation (updated as appropriate)

Department’s Statutory Noticing Requirements For School Properties 24 Site Managers Should Alert the BPSS BCO When Contamination is Discovered at the Site of a School (public or private) Site Managers Should Alert the BPSS BCO When Contamination is Discovered at the Site of a School (public or private) –This can be accomplished using the “Contamination Notification Checklist for Active State-Funded Cleanup Sites” if associated with an “Initial Notice” package.

DWM’s Expanded Noticing Requirements For School Properties 25 If the Site at Which Contamination is Discovered is a Private School K-12 If the Site at Which Contamination is Discovered is a Private School K-12 –The Department will send a notice to the governing board, principal or owner and recommend that they send a copy to P/T/G’s If Contamination is Suspected but Not Confirmed at School Site (including private) If Contamination is Suspected but Not Confirmed at School Site (including private) –The Department will also send a notice recommending that they send a copy to P/T/G’s