© Bishop’s Stortford Town Council Bishop’s Stortford Paddling Pool Appendix 4 -RepaintRebuildor Re imagine? Toilets?

Slides:



Advertisements
Similar presentations
The Pay Me Game.
Advertisements

Managing the Cycling Renaissance in Bankside Sophie Tyler Better Bankside ECOMM San Sebastián/ Donastia May 2009.
University of Bristol Phi Strategic Brief Decant Scenarios Presentation to Physics 10 October 2007.
Lorne Park Secondary School Grade 9 Course Selection Presentation 2014/2015.
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District December 2, 2008 EDUCATE ENGAGE.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
S.Thomas College Gurutalawa OLD BOYS ASSOCIATION 2008/09 JUNIOR DORMITORY TOILET PROJECT.
Federal Reserve Bank of Boston Case Study
Refurbishing an Existing Research Facility - Recent Experiences Jon Green VP Business Operations.
© Bishops Stortford Town Council Sworders Field Masterplan – Brief History.
City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
Confidential - All Rights Reserved - © Capacity Analysis Fill in Supplier Name and Supplier Location (Address) Fill in Part Name (Ex: Bush, Button,
No Name Park March 7, Citizen Park Committee Volunteers 3 Official Meetings Other subcommittee meetings Developed Vision for Park Developed General.
Short-Term Alternatives for City Offices. Background and History Citys current lease for City Marketplace offices ends October 31, 2014 For 22,221 square.
© Nuffield Foundation 2011 Free-Standing Mathematics Activity Perimeter and area.
NBAJOBS Process Timing and. Agenda  Monthly Process and Timing  Time Entry related to NBAJOBS  EPAF Timing  Contacting Central  Banner Dates Examples.
+ Job design. + Job Specialization - Specific Is where production Is broken down into distinct tasks that are performed by individual employees, it is.
The Green Standard Standard , Standard for the Design of High-Performance Green Buildings.
Operation of the FW-720 Unit 1. Side 1 2 Inlet Hand Crank.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee August 24, 2010 Metro Permit Reissuance Proposed.
10 to 15 Year Golf Course Development Plan. There are currently 3 greens that have been upgraded to/close to USGA specification (1st, 4th, 17th) and 2.
Doubleday Lodge Consultation 20 September- 13 December 2013.
© Bishop’s Stortford Town Council Current Major Projects – Brief Update Cemetery extension Cemetery extension Land transfer with EHDC now complete, works.
Current Major Projects – Brief Update Jubilee Tree Jubilee Tree Planted, plaque being purchased, opening ceremony 25th Jun Planted, plaque being purchased,
Current Major Projects – Brief Update Newtown Road refurbishment Newtown Road refurbishment design complete and costed design complete and costed Benches.
Current Major Projects – Brief Update (1) Jubilee Tree Jubilee Tree Ceremony complete, project closed Ceremony complete, project closed Riverside & Green.
Current Major Projects – Brief Update Sworders Field Masterplan Sworders Field Masterplan Design brief completed and issued for tender Design brief completed.
© Bishop’s Stortford Town Council Paddling Pool – Colour Scheme Paddling Pool – Colour Scheme 6 Jan 2014: RESOLVED to build the paddling pool in coloured.
Current major projects – brief update Paddling Pool Paddling Pool Build starts September 2014, permission to demolish pumphouse secured, no planning permission.
Council Tax Support Ray Bowmer, Head of Finance Parish Council Liaison Meeting 30 October 2013.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
CITY CODE OF ORDINANCES – REVISIONS TO CHAPTER 30- UTILITIES City Commission/City Manager Workshop June 16, 2014.
Developing a Shared Direction Joint meeting of the Brownsburg Town Council and Park Board January 29, 2015.
Year 12 D of E Training Day 1. Unit 2 The Environment Your Team The Qualifying Expedition.
Wall Paintings Fresco Technique. Fresco Technique All of the paintings we will be looking at use the fresco technique. The modern distinction between.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Environmental Management at Edge Hill 1. 2 A quick survey! “how many of you are environmental managers?” “how many of you are consulted, feed into and.
Community Forum 19 June 2013 EAST. Community Forum Agenda Welcome −Health and Safety Facilities Rebuild Programme –An overview of progress Forum –General.
Apton Day Centre Options in relation to Community use and other matters James Parker 10 th July 2014 © Bishop’s Stortford Town Council.
© Bishop’s Stortford Town Council Paddling Pool toilets Further Information and Initial Studies.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Proposal to Renovate the Gunter Park By Brooke Hogan By Brooke Hogan.
How to Properly Scan the Market Focus, Wisdom and Foresight Alice Watson, Director and Founder of Porge Research.
USAJOBS Job Search. You can perform a keyword and location search right from the USAJOBS® home page, and you can also click the Browse Jobs or Advanced/International.
Designated Smoking Areas Update to Proposal for Locations
Current major projects – brief update Paddling Pool Paddling Pool Build starts September 2014, final design details being sorted by contractor Build starts.
Copyright  1999 by James H. Money. All rights reserved. Except as permitted under United States Copyright Act of 1976, no part of this publication may.
Coleshill Memorial Park
Creating a Silhouette in Illustrator. Go File>Place and place the photo on the artboard. Select the photo and click Live Trace (its on the tool bar right.
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
Big picture: Learning outcomes Demonstration – 1.Drawing the masks basic shapes 2.Discuss what different levels Complete drawing stage Review progress.
© Bishop’s Stortford Town Council Bishop’s Stortford Neighbourhood Plan Team for Silverleys and Meads Wards 5 th November 2013.
Highways Investment Strategy May Background 1,100 km of roads One of the lowest spends in the country Consecutive years of severe weather Significant.
© Bishop’s Stortford Town Council Grants Policy CCTV Appendices 4 and 5.
© Bishop’s Stortford Town Council Funding Options: Sworders Field Masterplan Appendix 3b.
© Bishop’s Stortford Town Council Paddling Pool Plant Room Cosmetic Options.
+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.
Town of Watertown Staffing and Operational Assessment of the Public Works Department September 10, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
Pool Service Coral Springs Family Pool Cleaning Your Neighborhood Pool Specialist Our company prides itself on being trustworthy and honest. Our mission.
© Bishop’s Stortford Town Council Paddling pool Project Update & miscellaneous design matters.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
Structural Cost Savings/revenue improvements (for Info only)
3. Refurbishment - Project 1
Summer Programs 2016 Class Maintenance
With funding from the Appalachian Regional Commission
Our legacy for the future
Presentation transcript:

© Bishop’s Stortford Town Council Bishop’s Stortford Paddling Pool Appendix 4 -RepaintRebuildor Re imagine? Toilets?

History/Background Pool last refurbished in 2004 Pool last refurbished in 2004 Two part professional re-surfacing to existing GRP liner – 16K Two part professional re-surfacing to existing GRP liner – 16K OK until , then rapid deterioration OK until , then rapid deterioration Does not meet current (PWTAG) standards for water turnover Does not meet current (PWTAG) standards for water turnover However: regular bacteriological tests indicate no actual problem However: regular bacteriological tests indicate no actual problem PWTAG compliance => new pump room 7m*3m PWTAG compliance => new pump room 7m*3m Budget £K105 for refurbishment subject to confirmation of masterplan Budget £K105 for refurbishment subject to confirmation of masterplan Masterplan will go to Council December 9 th 2013 Masterplan will go to Council December 9 th 2013 Pool unused 24*7*7 months and 16*7*5 months Pool unused 24*7*7 months and 16*7*5 months Pool is at main park entrance yet not attractive when out of use – even when refurbished Pool is at main park entrance yet not attractive when out of use – even when refurbished Opportunity during refurbishment? Opportunity during refurbishment? © Bishop’s Stortford Town Council

Repaint Make good current surface, repaint using rubberised pool paint - £K2-5 or re-do existing treatment – £K20 Make good current surface, repaint using rubberised pool paint - £K2-5 or re-do existing treatment – £K20 Low cost option, quick fix, temporary Low cost option, quick fix, temporary Maximised area of standing water for paddling Maximised area of standing water for paddling No fountain play feature No fountain play feature Not PWTAG compliant Not PWTAG compliant Unlikely to last more than 2-3 years Unlikely to last more than 2-3 years No relief from glass and vandalism issues No relief from glass and vandalism issues No attractive entrance feature when out of use No attractive entrance feature when out of use © Bishop’s Stortford Town Council

Rebuild Rebuild existing paddling pool bringing up to modern standards: £K Rebuild existing paddling pool bringing up to modern standards: £K PWTAG compliant PWTAG compliant 15 – 20 years lifetime 15 – 20 years lifetime Clean and new surfaces for surrounding area Clean and new surfaces for surrounding area Maximised area of standing water for paddling Maximised area of standing water for paddling New central fountain and optionally edge fountains New central fountain and optionally edge fountains No relief from glass and vandalism issues No relief from glass and vandalism issues Limited options to make attractive entrance feature when out of use Limited options to make attractive entrance feature when out of use © Bishop’s Stortford Town Council Paddle area New surround path Central fountain Fountains at edge

Re imagine Redesign with gentle surface profile, multiple play features & optional lighting: £K Redesign with gentle surface profile, multiple play features & optional lighting: £K PWTAG compliant PWTAG compliant 15 – 20 years lifetime 15 – 20 years lifetime Clean and new surfaces for surrounding area Clean and new surfaces for surrounding area New central fountain and additional play features New central fountain and additional play features Gently sloping sides Gently sloping sides Reduced area of standing water for paddling, total play area unchanged Reduced area of standing water for paddling, total play area unchanged Rapid empty/fill, easier maintenance/glass removal Rapid empty/fill, easier maintenance/glass removal Lighting options Lighting options Several options to make attractive entrance feature when out of use Several options to make attractive entrance feature when out of use © Bishop’s Stortford Town Council Splash area, gentle profile, multiple features Paddle area New surround

Re-imagine – Further views © Bishop’s Stortford Town Council Section Winter / Nightime Central feature (summer – illuminated fountain?) Smooth profile Illumination (optional)

Feature Checklist © Bishop’s Stortford Town Council Features Response % (1) RepaintRe-buildRe-imagineNote A better fountain in the centre49% Yes Sloping sides35% Yes A water wall31% Yes Disabled access & enjoyment of the water facility 24% Yes Toilets43% 2 Shade36% 3 Add water troughs and sand play24% Add water rills & troughs33% 4 A suitable slide33% Maximum paddling area- Yes Fast empty/fill- Yes 5 Options for winter feature- Very LimitedYes Approx price (£K) Notes: (1) % (out of 374 respondents) who wanted this feature when surveyed by Cllr Elliott June 2012 (2) Not part of Masterplan, space constrained, could be retrofitted or consider 'one cubicle' option? (3) Could be retrofitted (4) Mechanical feature, vandalism an issue, not recommended (5) Important for maintenance and out of hours use (6) Negotiations and detail continue. Price (except ‘repaint’ option) includes lighting (~7k) and new path surround (~ 8k) Engineering details still to be resolved including colour, base material, planning permission(?), location of plant room, surround material etc. Formal ‘sealed bids’ tender process may be required once requirements finalized

Decisions Re-paint, re-build or re-imagine Re-paint, re-build or re-imagine Budget uplift Budget uplift Toilets Toilets Simple (eg 1-2 cubicle) toilets could probably be accommodated, Cheaper if done now! Simple (eg 1-2 cubicle) toilets could probably be accommodated, Cheaper if done now! Guesstimate – 30-60k in addition Guesstimate – 30-60k in addition Masterplan option selected means that Café toilets no longer close to pool Masterplan option selected means that Café toilets no longer close to pool Café toilets were close in option originally selected Café toilets were close in option originally selected Demand will continue, shoukld we spend the money now eg from New Homes Bonus? Demand will continue, shoukld we spend the money now eg from New Homes Bonus? © Bishop’s Stortford Town Council