1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.

Slides:



Advertisements
Similar presentations
Harmonic – in brief January Company Overview Key facts about Harmonic Were the largest provider of Business Winning services in the UK Our top 10.
Advertisements

© eComScience Pvt. Ltd OffshoreSoftwareDevelopment eComScience Consulting perspective.
ABOUT US National Expedited Parcel Distribution National Expedited Parcel Distribution.
What is the Enerjetic Business? The business offers consulting and reporting tools to report on energy and related data for business purposes. Common uses.
Embedding Public Engagement Sophie Duncan and Paul Manners National Co-ordinating Centre for Public Engagement Funded by the UK Funding Councils, Research.
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
A2Zeurope Strategic and Operational Consulting November , Place Vendôme Paris - Phone: +33 (0) Fax: +33 (0)
Brought to you in association with The Benefits of Strategic Partnership.
Service and Training. Our engineers and Instructors are all highly qualified and possess many years of experience with top manufacturers. Surveys Studies.
AXIS Camera Recorder. Value Proposition  AXIS Camera Recorder Offers all core video recording and monitoring functionality at an attractive price level.
ISIS Turnkey Missions ISIS designs, manufactures, launches and operates affordable, capable, nanosatellites ISIS provides turnkey missions for institutional,
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Activity Based Costing within a collaborative estimating framework Association of Cost Engineers 17 th February 2004 Grahame Jones, UK Manager, PRICE Systems.
1 CISR-consultancy Challenges “Customer ask us what to do next” Keywords: “Customer ask us what to do next” From Policy to Practise The world is going.
PERFORMANCE FOR ALL The Project & the System. A HE project co-ordinated by University of Bristol, open to HE internationally. Developing the requirements.
Viewpoint Consulting – Committed to your success.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Applying Innovation Dubai Airport Show 2015 – Innovation podium Tuesday 12 March 2015, Session 1, 10:15 – 10:45 Laurent Delétraz.
ISO Energy Management System Certification
Supply Chain Development A step-change in Supply Chain performance 08/08/2015 OFFICIAL 1 Supply Chain Focus Group – 17 th September 2014 Vic Carlill.
Enterprise Architecture
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
1 Analysys Mason undertook an international programme of customer satisfaction research for a telecoms billing system vendor  A billing systems vendor.
Client Case Studies Revenue Assurance & Revenue Intelligence.
The Carbon Trust Taking Action on Cutting Carbon Emissions Dr Kathryn Vardy 9 th November 2007.
Heat Management – A business opportunity CONNECTIVE ENERGY A company developed by Carbon Trust Enterprises.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Successful Case Partner: Provincia di Lecce Business: SPACEDAT s.r.l.
Sapient Global Markets – Commodities Team Analytics, Advisory and Project Management.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
Workshop on Trade Representation Trade Related Technical Assistance for SRE Peter Bennett Trade Development Consultant.
5 continents, 1 Vision – Discovering Talent. +20 years experience in delivery to the Banking & Financial Sector – for every role our expert consultants.
1 Copyright © 2007 Accenture All Rights Reserved. About CIS Co-op Insurance Services (CIS)—a subdivision of the Co-Op Group—provides a full range of life,
The Coalition for Action on ICT enabled change in Europe.
About TEKNORGE Work Flow Our Value Propositions Business Models Customer Data Security Why TEKNORGE AS Core Engineering services Automotive Domain Expertise.
BMT Sigma Capability Overview. BMT Group An international network of subsidiaries providing engineering, design and risk management consultancy Wholly.
Company Presentation September Our Mission: VideoApp distributes selected brands, only top quality level, in the following sectors: Traffic technology.
INNOWATER Introduction to Business Proposition Toolkit July 2013.
Only for internal use / © Siemens AG All rights reserved. Industry Sector Central worldwide Messages for energy efficiency, for customers, analysts,
The Eyeblaster ACM Advertising Campaign Management.
Branding Design Lab Consultancy Services. Preambles  International competition is forcing Manufacturers to invest in research and design in order to.
National Programs. Local Solutions. The Best of Both Worlds.
20 October 2015 © The Marketing Practice 2008 Win-based marketing Tools that marketing could deliver in support of major bids.
Energy Efficiency and Emission Management Edwin van den Maagdenberg Vice President Technology and Operations Honeywell Process Solutions.
Formulating a Simulation Project Proposal Chapter3.
Federal Acquisition Service U.S. General Services Administration GSA Assisted Acquisition Services Peter Han General Services Administration March 16,
Minimising IT costs, maximising operational efficiency NIMM: Key Business Technology Map The core application delivery solutions that.
Access to drugs, Reducing bottlenecks Matt Cooper Business Development & Marketing Director NIHR Clinical Research Network
1 1 Presenter / date if required Independent, integrated thinking.
DEMONSTRATING IMPACT IN HEALTH AND SOCIAL CARE: HOSPITAL AFTERCARE SERVICE Lesley Dabell, CEO Age UK Rotherham, November 2012.
Marketing Activity Presentation Contents Our credentials What’s been happening Channel Partner Programme Coatings Academy New website Branding.
© Project One Consulting Limited All rights reserved. 0 Introduction to Project One Slides.
Horizon 2020 – 2016 Transport Call
Sensors and Instrumentation Computational and Data Challenges in Environmental Modelling Dr Peter M Allan Director, Hartree Centre, STFC.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N.
Driving Innovation Making the UK a global leader in innovation Merlin Goldman 8 September 2011.
Plant Maintenance Experts CPM Engineering offers diagnosis and repair of electrical and mechanical equipment. From pump, gearbox & motor repairs, machining.
Achieving Deep Energy Savings in the Grocery Market -A comprehensive approach to retail- Diane Levin November 2, 2010.
Delivering value to the NHS Customer Satisfaction.
Scales Technology FZCO
CORPORATE PRESENTATION
Delivering Value Through Advanced Design Analytics With Dale McClung, Director of Design Solutions September 14, :45 AM.
XS2I4MS – Final Event of the Mentoring and Coaching Programme
Ministry of Health Maputo Mozambique
KEYNOTE STAGE SPONSOR.
(Building Information Modelling
Address: 223/224 Global Business Park, Chandigarh, Mob: Phone:
Across the entire value chain
Welsh Health Innovation Technology Accelerator
Growth and innovation Project support overview.
Presentation transcript:

1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research institute Since its start ISI has built a network of partners and customer across Europe From major research organisations such as the European Space Agency Through to large cooperate clients such as Tata steel

2 SUPPORT EXPERTISE FLEXIBLE DELIVERY RETURN ON INVESTMENT What we do for our customers? Supporting your journeywith expert solutionsdelivered your way we do what we say we will Flexible approach Return on investment royalty Speed of decision we do what we say we will Flexible approach Return on investment royalty Speed of decision Full range of capabilities Solutions delivered locally Sector and product expertise Full range of capabilities Solutions delivered locally Sector and product expertise For our customers and prospects Use every opportunity to communicate our promise Ensure proposition is consistent Be a trusted advisor to our customers

Initiation Feasibility Study Build and TestImplementationBenefits Delivery Flexible approach allows customers to control the development with nature points inserted within a given program. Feasibility Study Instrument Design Build and Test Review of product First Two stages have a fixed price ISI offers a complete review of the product and the end of the development against the initial objectives so client can understand the return on their investment Design

4 4 Today: The Evolution of your Solution Customer Final Problem Sensor Positive ChangesInitial problem generates losses May have environment impact Final sensor offer reliable measurement of issue allowing problem to be controlled Improve process efficiency Step 1 Feasibility study and concept design Typically 2 months Fixed price Identifies keys risks End report produced for review Step 2 Detailed Design Typically 2-3 months Fixed price Provide estimates for final instrument cost Step 3 Build and test Timeline depends on complexity Keep customers involved in the process Instrument tested on site and refined Step 4 Programme review Performance of the instrument reviewed and compared to initial objectives Cost benefit analysis performed ISI Core expertise is in, laser remote sensing systems including LIDAR and Raman Spectrometers for liquid a gas identifications. In addition ISI are experts in 3D vision systems in challenging industrial environment's. ISI offer a unique bespoke development product for our customers. Developing solutions to your problems by working in partnership with the end user. We apply our extensive to provide customers with the best solution overall solution, taking account of both technical and commercial sensitivities This staged approach allows cost to be controlled and stop mission creep in the development Allows the customer to stay in control

5 Step One: Feasibility and Concept Design Feasibility Study From initial inquiry define top level requirements/Objectives Develop Baseline Instrument requirements Technology trade off Select Solution Simulate expected performance and compare to Objectives Develop Concept price Benefits to our customers Can be conducted as a stand alone consultancy or part of an instrument development Fixed price Report provided in which customers decides on weather or not to move forward to the next stage Previous studies Hazardous Liquid identification in an industrial plant Development of an integrated LIDAR with a stereo Camera Identification of DMS in a gas pipe line 5

6 Step Two: Detailed Design 6 x Detailed Design From initial inquiry define top level requirements/Objectives Develop Baseline Instrument requirements Technology trade off Select Solution Simulate expected performance and compare to Objectives Develop Concept price Benefits to our customers Can be conducted as a stand alone consultancy or part of an instrument development Fixed price Report provided in which customers decides on weather or not to move forward to the next stage Previous studies Development of LIDAR simulation tool for solar system applications Development of Raman spectrometer to detect CO 2 Development of photon counting spectrometer for identification of DMS Development of 3D measurement system to detect corrosion in metal processing plants with the MSSL and UK space agency

7 Step Three: Build and test 7 Build and Test Typically split into two stages to allow easy monitoring of progress and manage costs Initial prototype developed from detailed design All drawing provided Design and,manufacturing reports provided Work in partnership with customers to ensure return on investment for all parties Test campaign include in-situ testing Benefits to customer Complete sensor development Route map developed for additional systems Previous builds Photon counting Raman spectrometer for DMS detection Imaging LIDAR For landing on Martian surface Liquid detection and identification instrument for industrial client High temperature probe for corrosion monitoring * * I In development

8 Tomorrow: Project review and way forward 8 Project review Review instrument performance with respect to initial objectives Cost benefit analysis Develop route map for next steps – to develop multiple systems Benefits to customer Helps understand benefits for the sensor Identifies future improvement that can be made Identifies cost saving acquired Route map developed for additional systems Previous builds Imaging LIDAR For landing on Martian surface