Unlocking the potential from UKCS low deliverability reservoirs Colin Cranfield (DTI) Pete Naylor (ECL Technology)

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Working with MS-ACCESS IS 240 – Database Management Lecture #2 – Assoc. Prof. M. E. Kabay, PhD, CISSP Norwich University
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Universität Kaiserslautern Institut für Technologie und Arbeit / Institute of Technology and Work 1 Q16) Willingness to participate in a follow-up case.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 Tracking Innovation in NC Patterns and Implications for NC's Eastern Region John Hardin, Executive Director NC Board of Science & Technology
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
Making the Most from UKCS Exploration Simon Toole Director – Licensing, Exploration & Development Prospex Fair 11/12 Dec 2007.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
CpSc 3220 Designing a Database
Presentation transcript:

Unlocking the potential from UKCS low deliverability reservoirs Colin Cranfield (DTI) Pete Naylor (ECL Technology)

slide no. 2 Overview Background – PILOT vision – Size of the prize DTI study – Literature review – Meetings – Workshop Ongoing activities

slide no. 3 PILOT - vision & challenges Maintaining UK production – 3 million boe/d in 2010

slide no. 4 Total UKCS production (million boe/d)

slide no. 5 PILOT - vision & challenges Maintaining UK production – 3 million boe/d in 2010 Production increments needed from – Brown fields – Undeveloped discoveries – Exploration and appraisal success

slide no. 6 Undeveloped Discoveries Significant UKCS potential resource

slide no. 7 high low high P3 P2 P3 P2 UKCS - produced & remaining 300+ undeveloped discoveries > 6 BBOE reserves

slide no. 8 Undeveloped Discoveries Significant UKCS potential resource Technical challenges – Heavy oil – HPHT – Sour reservoirs – Low deliverability

slide no. 9 Undeveloped Discoveries Significant UKCS potential resource New technical challenges – Heavy oil – HPHT – Sour reservoirs – Low deliverability Undeveloped Discoveries Workgroup survey

slide no. 10 UDW survey – development barriers

slide no. 11 UDW survey – development barriers

slide no. 12 DTI action on low deliverability Low deliverability is a barrier in at least 46 undeveloped discoveries 35 undeveloped discoveries examined in detail Review literature Collate data Structured discussions Interactive workshop Disseminate results

slide no. 13 Literature review – 4Q 2000 Many reasons for low deliverability – Industry does not focus on overall problem Established remedial techniques – Hydraulic fracturing – Long deviated wells Relatively few novel techniques – Seismic – Visco-elastic fracturing fluids

slide no. 14 Study - Indicative HCIIP distribution Aggregate undeveloped discoveries studied: – HCIIP > 2.5 billion boe – Technical reserves > 0.5 billion boe By geographical areaBy fluid type

slide no. 15 Mind maps to identify barriers

slide no. 16 Mind maps to identify barriers

slide no. 17 Mind maps to identify barriers

slide no. 18 Mind maps to identify barriers

slide no. 19 Objectives networks for solutions

slide no. 20 Objectives networks for solutions

slide no. 21 Objectives networks for solutions

slide no. 22 Relative importance of barriers Technical BarriersNon-technical

slide no. 23 Relative importance of solutions Technological SolutionsCommercial

slide no. 24 Conclusions Primary technical barriers: – Uncertainties in reservoir characterisation – Compartmentalisation – Low permeability Solutions exist in many cases – Relatively few technology gaps Significant contractual / commercial barriers Future opportunities - what is required: – Change in culture – Strategies to manage risk

slide no. 25 Recommendations Evaluate progress in key technological areas – Quantify potential benefits – Report successes / failures – Disseminate best practices Reduce risk – Collaboration – Field trials Review procurement practices – Focus on value Raise awareness – Technology champions

slide no. 26 Current strategies (1) DTI / PILOT – Fallow blocks /discoveries initiative

slide no. 27 Fallow process Four years of no drilling, or no Development Programme four years after discovery Doing all that can be expected Misalignment, Not economic, Commercial barriers Market testing (12 – 18 months) Divest/ReassignRelinquish Retain CLASS ACLASS B Renewed activity? NO YES

slide no. 28 Current strategies (2) DTI / PILOT – Fallow blocks / discoveries initiative – Shortened licence terms for new licences – Access to infrastructure – Consultation on “promote” licences – Availability of regional data – UK-Norway North Sea co-operation

slide no. 29 Current strategies (3) DTI / PILOT – Commercial “Code of Practice” – Study on technology uptake Brown field work group ITF solutions to low permeability Show-case events

slide no. 30 Potential timeline ITF Low perm. solutions Code of practice DTI fallow initiative Fallow assets onto LIFT Increasing impact of specialist companies PILOT 2005 target Continuing efficiency and technology improvements

slide no. 31 Further information