Construction (Design and Management) Regulations 2007

Slides:



Advertisements
Similar presentations
Risk Assessment. Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Training Package Session 1- Overview Version:
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 3 – CDM co-ordinator Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Managing the Health and Safety of Contractors
CDM What started out as a well-intentioned law aimed at raising safety standards has descended into a tedious form-filling exercise that owes more to.
© Imperial College LondonPage 1 Construction (Design & Management) Regulations 2007 Denis Murphy Construction Health & Safety Manager.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR 4 th February 2011.
Construction Health and Safety: The future of CDM – pitfalls and opportunities? Russell Adfield and Giles Meredith Construction Sector.
USHA Autumn Seminar in association with AUDE A Presentation by Richard Habgood APS President Thursday, 12 th September 2013.
Health and Safety Chapter 10.
CDM 2015 Key Changes and Duty-Holder Responsibilities
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
CDM Regulations – 2015 Are you prepared?. Contents  Introduction and Background  Changes to 2007 Regulations  Notifiable or Not?  Roles / Duties 
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
CDM Regulations 2015 The Practical Implications of the Changes for the Construction Industry 17th June 2015 Slide 1 They say a journey of a thousand miles.
Health and safety at work
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
The Construction (Design & Management) Regulations
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
Contractors CDM Compliance Kit CDM Contractors CDM Compliance Kit PRODUCT OVERVIEW.
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
WHS Management Plans.
CDM 2007 MAKING A DIFFERENCE Ken Logan. CDM 2007 : – Making a Difference The Challenge To change attitudes To change behaviours Achieve sensible risk.
UK’s CDM Regulations 2007 and its Applications in Singapore
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
Hansen – Managing Safely 1 CDM – An Appreciation Mark Mallen Health and Safety Manager Fenlock Hansen Ltd.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
CDM 2015 – HSE’s PERSPECTIVE Health and Safety Executive
Health and Safety Executive CDM 2007, Construction clients and fragile roofs Russell Adfield Construction Sector.
DIRECT WORKS FORUM CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Aylesbury: Dunfermline: Belfast:
Unit 201: Health and safety in building services engineering
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
Health and Safety Executive Construction (Design and Management) Regulations 2007 – 2 and a bit years in Anthony Lees Construction Policy Unit.
A guide to... Safe Systems of Work.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
Safe Systems of Work. Legislation w HSWA Section 2 (2) (a): Provide and maintain plant and systems of work that are, so far as is reasonably practicable,
IOSH Midlands South Branch Legal Update 30 September 2015 Andrew Litchfield – Wragge Lawrence Graham & Co LLP.
CDM 2015 Simon Longbottom 20 May Progress Significant culture change over last years Long-term downward trend fatals/major injuries Greater.
Be Prepared For Change Are you Prepared?. Be Prepared For Change Are you Prepared?
CDM Construction Design and Management
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
Health & Safety at Work Act 1974
CDM Client Briefing Tim Knowles
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Desk Based Preconstruction – Planning
Maintaining Safety Standards
HSE Update Lisa Skinner HM Inspector of Health & Safety
Maintaining Safety Standards
Construction (Design and Management) Regulations (CDM) 2015
Temporary Works Co-ordination
Design Risk Management Spotlight on CDM 2015
People Responsible For Health and Safety
CDM 2015 COSG Update.
The Construction (Design and Management) Regulations 2015
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
Effective Construction Safety Management
Client duties on CDM Regulation 2015
Presentation transcript:

Construction (Design and Management) Regulations 2007

Clients Do More 2007

The new, simplified CDM  Regulations revise and bring together the existing CDM 1994 and the Construction (Health Safety and Welfare) (CHSW) Regulations 1996 into a single regulatory package. They are supported by an Approved Code of Practice (ACoP) and industry-approved guidance. The Regulations came into force in April 2007 and were enforceable from day one.

Anyone having construction or building work carried out has legal duties under the Construction (Design and Management) Regulations 2007 (CDM 2007), unless they are a domestic client. A domestic client is someone who lives, or will live, in the premises where the work is carried out. The premises must not relate to any trade, business or other undertaking. Although a domestic client does not have duties under CDM 2007, those who work for them on construction projects will.

These Regulations will help you ensure that your construction project is safe to build, safe to use, safe to maintain and delivers you good value. Good health and safety planning will also help ensure that your project is well managed and that unexpected costs and problems are minimised. As a client, you have a big influence over how the work is done. Where potential health and safety risks are low, there is little you are required to do. Where they are higher, you need to do more.

CDM 2007 is not about creating unnecessary and unhelpful processes and paperwork. It is about choosing a competent team and helping them to work safely and efficiently together. Give them enough time and resource and you will get the building you want, when you want it and on budget. As a client, you need to do the following.

Appoint the right people You are more likely to get what you need if you make sure those who design and build are competent, have sufficient resources and are appointed early enough, so the work can be carried out safely.

If in doubt, talk to those you appoint. Allow adequate time A rushed project is likely to be unsafe and of poor quality. You need to allow enough time for the design, planning and construction work to be undertaken properly. If in doubt, talk to those you appoint.

Provide information to your team They will need information about what you want, how you will use it, the site and existing structures or hazards, such as asbestos. This will help your team to plan, budget and work around problems. You need to pass on key information to your construction team if they are to design and construct something that is safe to build, safe to use and safe to maintain. If in doubt, talk to those you appoint.

Ensure you and your team communicate and co-operate Your project will only run efficiently if all those involved in the work communicate, co-operate and co-ordinate with each other. During the design stage, it is particularly important that you, your designers and contractors talk early on about issues affecting buildability, useability and maintainability of the finished structure. You don't want people injured or unexpected costs because issues weren't properly considered when design changes could still easily be made.

Cost benefits of making changes to a project Value Opportunity Cost 1 2 3 4 5 Project Stages Buyer beware! While designs may be compliant with the requirements of the regulations, it cannot be assumed they are practical! All too often, the designer makes assumptions, or assumes controls, which are either not suited to the business operations or have significant costs associated with them

Ensure suitable management arrangements are in place Construction projects can be complex and involve many different trades and occupations. Frequently they also involve high-risk activities. The work is more likely to be done safely and to time if those doing the work have suitable management arrangements in place. You need to make sure that suitable arrangements are in place throughout the whole project. The type and level of checks needed depends on the work being undertaken and the risks involved. You may need help for more complex and high-risk projects. You are not required to take an active role in managing the work yourself.

Ensure adequate welfare facilities are on site You should ensure that your contractors provide adequate welfare facilities for construction workers as soon as possible, before work starts.

Ensure workplaces are designed correctly If your project is for a new workplace or alterations to an existing workplace (e.g. a factory or office), they must meet the standards set out in the Workplace (Health, Safety and Welfare) Regulations 1992. You should ask anyone who is doing design work for you to confirm that these requirements have been complied with. In addition, for notifiable construction work (work lasting longer than 30 days or involving 500 person days of work), you have to do the following.

Appoint a CDM co-ordinator Your CDM co-ordinator is there to advise and assist you with your CDM duties on notifiable jobs. They will: advise you about selecting competent designers and contractors; help identify what information will be needed by designers and contractors; - co-ordinate the arrangements for health and safety during the planning phase; ensure that HSE is notified of the project; tell you if the initial construction phase plan is suitable; and - prepare a health and safety file for you (this contains useful information you need to enable future cleaning, maintenance and alterations to be carried out safely). You should appoint the CDM co-ordinator as soon as possible, but no later than the initial design/preparation stage. CDM 2007 does not require the CDM co-ordinator to supervise or monitor work on site.

Appoint a principal contractor A principal contractor is needed to plan, manage and co-ordinate work while construction work is being carried out on notifiable jobs. Principal contractors are usually the main or managing contractor for the work. You should appoint the principal contractor at the earliest opportunity. This is so they can be involved in discussions about buildability, usability and maintainability and so they can have time to plan the work properly.

Ensure a health and safety plan is in place The principal contractor has to produce a construction phase health and safety plan outlining the key arrangements to ensure that the work is carried out safely. You should not allow work to start on site until there is an adequate plan.

Keep the health and safety file At the end of the project, the CDM co-ordinator will give you the health and safety file. The file is a record of useful health and safety information and will help you manage health and safety risks during any future maintenance, repair, construction work or demolition. The file needs to be kept safe, made available to anyone who needs to alter or maintain the building and updated if circumstances change.

If you don't appoint a CDM co-ordinator or principal contractor on a notifiable project, it will mean that you are legally liable if the things that they should have done aren't actually done.

Serious breaches of health and safety legislation on your construction project could result in construction work being stopped by HSE and additional work may be needed to put things right. In the most serious circumstances, you could be prosecuted.

Quiz Time

What is the legal status of the Approved Code of Practice for CDM 2007? 1. None, it has the same standing as any other guidance 2. It applies a reverse burden of proof (guilty until proven innocent) 3. It is not law but it must be followed by all duty holders

2. Who must inform the HSE (with an F10 form) of a notifiable project? The Client The CDM-C The Principal Contractor

3. Approved Code of Practice states that Clients should make periodic checks throughout the project to check arrangements are properly implemented and updated. Is this? 1. Correct? 2. Incorrect? 3. Correct only for Non-Notifiable projects?

4. The CDM Co-ordinator has the responsibility to identify and collect pre-construction information is this? 1. Always true? 2. Only true if Client's arrangements say so? 3. Always true only for design and build projects?

5. In a design team meeting as the CDM-C you have to explain that the internal road of the proposed office building is 1. Not defined as being part of the workplace 2. Included in the definition of a workplace 3. Only subject to planning requirements

6. Who must prepare the Health and Safety File? 1. The Client 2. The CDM Co-ordinator 3. The Principal Contactor

Isn’t CDM just a paper exercise?

Definitely not, read on!!

Ensure Workplaces are Designed Correctly

Ask me a question