Models
The Future of Building Services Model Content
What’s the biggest barrier to industry adoption of BIM? CAM Fabrication Proprietary Difficult and expensive to create Not conceived to support integrated project delivery or asset life cycle Answer: Model Content.
BIM-MEP AUS Model Workflows BIM-MEP AUS Design Model BIM Construction CAD Shop Detailing BIM As-Installed FAB-MEP AUS BIM-MEP AUS Construction Model BIM-MEP AUS Commissioned As-Built Model D&P Fabrication Pre-Fabrication BIM-MEP AUS Managed Content Site SUPPLIER BMA MODELS FAB MODELS Duct FabricationB2B BIM-MEP AUS Fabrication DESIGN MODELS
BIM-MEP AUS Model Types Plant Equipment Fittings
BIM-MEP AUS Model Types Plant Equipment Fittings
All Services Dimensionally Accurate Design > Procure > Commission Scheduling Quality Assured, Independently Certified Models
Dimensionally Accurate
BIM-MEP AUS Models – Best of Breed Fittings /Equipment Manufacturer’s Proprietary Selection Software Procurement Scheduling Interface
BIM-MEP AUS Models – Equipment Scheduling Design Schedule - System Integration - Calculated system totals - Design Schedules - Model Status Procurement Schedule - Manufacturer/association defined schedule - Manufacturing Codes Commissioning / As-Built Schedule - NEBB and/or - Manufacturer defined schedules
BIM-MEP AUS Models – Manufacturer’s Procurement Interface Manufacturer’s Proprietary Selection Software Procurement Scheduling Interface TO CONTRACTOR
BIM-MEP AUS Models – Manufacturer’s Workflow
BIM-MEP AUS Models – Managed Content Service Provider Service Provider KarelCAD / TSI International Tier III Data Centre Secure Facilities Disaster Recovery
BIM-MEP AUS Models – Content Development Project Cycle