AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Advanced Piloting Cruise Plot.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Vorlesung Informatik 2 Algorithmen und Datenstrukturen (Parallel Algorithms) Robin Pomplun.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Custom Services and Training Provider Details Chapter 4.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
This is a sample set of slides from one of our fifteen pre- pack employment law seminars. For more information, visit:
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
Green Eggs and Ham.
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
VOORBLAD.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2011 Bentley Systems, Incorporated Big BIM for contractors Paul King Construction Solutions Manager.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Using one or more of your senses to gather information.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
The tool that could change everything 1 The Tool that could for Employees Change Everything.
Presentation transcript:

AMCA Consultant Process

2 What do you do?  IPD? (Integrated Project Delivery)   Contractors not engaged early enough(typical)  Client not fully BIM aware?  Software (interoperability / data exchange)  Training (do staff require further training?)  All of the above?

3 How does it all start  Client - concept  Architect provides visual images etc.  Structural involvement (can we build it?)  PDF‘s, hand sketches / Google sketch up etc..  No 2D or 3D cad  Oh...and lots of “MEETINGS”

4 Consultant design period Arch Struc Others Begin design Begin design Spatial planning Spatial planning Add detail Add detail Coordination Issue information Issue information Issue 3D model Drawings Schedules Issue 3D model Drawings Schedules Firm up detail Plant Sizes detail Firm up detail Plant Sizes detail Simple Routes Placeholders PDF's Simple Routes Placeholders PDF's All plant Ductwork Pipework Electrical All plant Ductwork Pipework Electrical Coordinate Does it fit? Liaise with arch and structure Coordinate Does it fit? Liaise with arch and structure Revit / Navis works Concept

5 Step 1  Concept  Client and design team discuss concept.  Produce hand sketches, PDF's  Cad not engaged.  Agree services zoning strategy?

6 Sample

7 Sample Step 1

8 Zoning

9 Consultant design period Arch Struc Others Begin design Begin design Spatial planning Spatial planning Add detail Add detail Coordination Issue information Issue information Issue 3D model Drawings Schedules Issue 3D model Drawings Schedules Firm up detail Plant Sizes detail Firm up detail Plant Sizes detail Simple Routes Placeholders PDF's Simple Routes Placeholders PDF's All plant Ductwork Pipework Electrical All plant Ductwork Pipework Electrical Coordinate Does it fit? Liaise with arch and structure Coordinate Does it fit? Liaise with arch and structure Revit / Navis works Concept

10 Step 2  Begin design.  Design begins to evolve from step 1 meetings.  Simple shapes to represent plant items.  Cad may be engaged?  Lots of options.

11 Sample step 2

12 Sample step 2

13 Sample step 2

14 Consultant design period Arch Struc Others Begin design Begin design Spatial planning Spatial planning Add detail Add detail Coordination Issue information Issue information Issue 3D model Drawings Schedules Issue 3D model Drawings Schedules Firm up detail Plant Sizes detail Firm up detail Plant Sizes detail Simple Routes Placeholders PDF's Simple Routes Placeholders PDF's All plant Ductwork Pipework Electrical All plant Ductwork Pipework Electrical Coordinate Does it fit? Liaise with arch and structure Coordinate Does it fit? Liaise with arch and structure Revit / Navis works Concept

15 Step 3  Spatial planning.  Design evolves from step 2 meetings.  Service routes / strategy are agreed.  Cad and engineers collaborate.

16 Sample step 3

17 Sample step 3

18 Consultant design period Arch Struc Others Begin design Begin design Spatial planning Spatial planning Add detail Add detail Coordination Issue information Issue information Issue 3D model Drawings Schedules Issue 3D model Drawings Schedules Firm up detail Plant Sizes detail Firm up detail Plant Sizes detail Simple Routes Placeholders PDF's Simple Routes Placeholders PDF's All plant Ductwork Pipework Electrical All plant Ductwork Pipework Electrical Coordinate Does it fit? Liaise with arch and structure Coordinate Does it fit? Liaise with arch and structure Revit / Navis works Concept

19 Step 4  Add detail.  Model all services – duct/pipe/Elec systems.  Plant items are now more accurately sized.  Use AMCA approved content / families.  Appropriate time to use AMCA content?  Generic content.

20 Sample step 4

21 Consultant design period Arch Struc Others Begin design Begin design Spatial planning Spatial planning Add detail Add detail Coordination Issue information Issue information Issue 3D model Drawings Schedules Issue 3D model Drawings Schedules Firm up detail Plant Sizes detail Firm up detail Plant Sizes detail Simple Routes Placeholders PDF's Simple Routes Placeholders PDF's All plant Ductwork Pipework Electrical All plant Ductwork Pipework Electrical Coordinate Does it fit? Liaise with arch and structure Coordinate Does it fit? Liaise with arch and structure Revit / Navis works Concept

22 Step 5  Coordination.  Accurate coordination between services / structure and architecture.  Information is passed between all members of the design team in 3D format.  Plant items have property fields which may be empty and ready for population by contractors.

23 Structural

24 Sample step 5

25 Typical Revit MEP model

26 Typical CadDuct model

27 Consultant design period Arch Struc Others Begin design Begin design Spatial planning Spatial planning Add detail Add detail Coordination Issue information Issue information Issue 3D model Drawings Schedules Issue 3D model Drawings Schedules Firm up detail Plant Sizes detail Firm up detail Plant Sizes detail Simple Routes Placeholders PDF's Simple Routes Placeholders PDF's All plant Ductwork Pipework Electrical All plant Ductwork Pipework Electrical Coordinate Does it fit? Liaise with arch and structure Coordinate Does it fit? Liaise with arch and structure Revit / Navis works Concept

28 Step 6  Issue Information.  Hand over to contractor – DWG – RVT – PDF – Schedules etc (everything contained within Revit).  Over to Albert Watson who can describe this phase.  Contractor coordinate in Revit / CadDuct?  Fabrication.  Installation.

29 Typical mechanical schematic

30 Typical mechanical layout

31 Typical mechanical floor layout

32 Typical CadDuct model

33 Typical CadDuct model

34 Summary AMCA agreed objects / families need to be:-  Generic, parametric, robust / well built.  If families are too complex may not be used.  Use of common AMCA families will help transition from consultant to contractor workflow.  We (construction industry) must stop re drawing information and improve work flow.  Cradle to grave solution?