1 Beating the water at Integra Underground. 2 On 4 August 2006, the Glennies Creek JV and the Camberwell Coal JV were integrated to form the Integra Coal.

Slides:



Advertisements
Similar presentations
WHY INDIA? September Quantum Advisors 2 Summary Overall, economic policy is geared towards growth India is a party to various global trade and tariff.
Advertisements

Facts and Figures Asia Pacific 2010
Jubail Industrial City A $45 Billion Super Project
Introduction to the field of organisational behaviour
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 40 The Stock Market Crashes.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
2ND INTERNATIONAL COAL CONFERENCE SECURING FUTURE NEEDS 1.
Scope and method of pilot survey in China Yang kuan kuan Deputy director-general of office on Leading group of the Second National Economic Census under.
IFC 2009 Creating Opportunity. 2 Our Vision That people should have the opportunity to escape poverty and improve their lives We foster sustainable economic.
Metropolitan Transportation Authority July 2008 Financial Plan MTA 2009 Preliminary Budget July Financial Plan 2009 – 2012 DJC.
1 External Relations Evaluation Unit Result and Impact Indicators for the Road Sector.
1 The Metro Ethernet Forum Helping Define the Next Generation of Service and Transport Standards Ron Young Chairman of the Board
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
2007 Arledan Investments Ltd. Company Profile
An Economic Solution to Dry and Densify Ligno-Cellulosic Biomass The BioCompactor Technology The BioCompactor Company, LLC BioBriquet ® Herbaceous Feedstock.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Ferro Alloy Industry in India – Challenges & Opportunities
Indonesia’s current account challenge
PRESENTED BY: FELIX A. NEGRON AMERICAN PRECIOUS METAL RECYCLING LLC As of 23 February Mining Projects in 7 Countries.
Insert Product Photograph Here. People Mgmt Skills Mgmt Skills The Highwall Puzzle Pieces Communication Equipment Reserves.
Capacity Planning For Products and Services
Capacity Planning For Products and Services
© S Haughton more than 3?
Infrastructure and resource regions Ian Satchwell IM4DC/AAPF Infrastructure Forum Wednesday 20 March Supporting sustainable resources development.
Steve McAllister Austmine Ltd Mining Innovations: Made in Australia Paul Harper Chief Executive Officer – AMC Consultants “5100 assignments in 100 countries“
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
MYP planning: the unit planner
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Public Works Road Fund Overview May 2, 2013 Tanya Heaton, PW Budget Manager.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Adapting to a changing climate John Drexhage, Director, ICMM 28June 2013, London Inaugural Institute of Materials, Minerals & Mining Fellows.
1 Budgets and Budgetary Control Prepared and Presented By Gladstone K. Hlalakuhle.
Fujitsu Siemens Computers at a glance Georgios Nikolopoulos Sales Manager November 2008.
Week 1.
Number bonds to 10,
Eaton Business System Overview
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. Global Business and Accounting Chapter 15.
Doing business in Oman April April 2008Doing Business in OmanPage 2 Index of topics ► Business climate ► Legal system ► Business structures ►
Indiana University – South Bend Indiana University - South Bend Kraft and SAP.
1 Chapter 20 Benching the Equity Players Portfolio Construction, Management, & Protection, 4e, Robert A. Strong Copyright ©2006 by South-Western, a division.
Modularising Liquid Natural Gas Plants Henry Clive Handley Director Handley Surveys
Mr Kleber Silva – Executive Vice President, Head of Iron Ore - ArcelorMittal group December ArcelorMittal in Algeria at a glance UK- Algeria Investment.
Pike River Coal Mine ACARP Presentations August 2008 Peter Whittall – General Manager, Mines PIKE RIVER COAL.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
AN INTRODUCTION TO ANGLO AMERICAN. 2 ANGLO AMERICAN Anglo American is a global diversified miner with a market capitalisation of more than $70bn and interests.
Anglo Coal Australia. Group Structure Anglo Coal Australia Australia’s third largest coal producer Investment in Australia totals USD 1.3bn Plans to.
Australian Tungsten King Island Project Peter Gibson Executive Director PO Box 617, Applecross WA 6953, Australia Telephone:
Queensland - Overview Population – 4.56 million Land – million square kilometres (just over 3x size of France!) GSP – $A258 billion Capital City.
Upskilling for Productivity Southern Institute of Technology July 2009.
Natural Resource Partners L.P. A Successful Growth Story UBS Investor Meetings Las Vegas, Nevada September 18, 2007.
Natural Resource Partners L.P. 17 th Annual Wachovia Equity Conference Nantucket June 26, 2007.
1 PBS - SEVERSTAL RESOURCES. PBS COALS 46 years of operating history 4 th largest coal producer in Pennsylvania, the USA 48,000 acres of land in Somerset.
Pembroke Resources Established in 2014 to specifically focus on the acquisition and development of high quality metallurgical coal assets Project Sonnet.
Ensham Mine The Last Five Years and The Next Five
An introduction to ANGLO AMERICAN
An introduction to ANGLO AMERICAN
Presentation transcript:

1 Beating the water at Integra Underground

2 On 4 August 2006, the Glennies Creek JV and the Camberwell Coal JV were integrated to form the Integra Coal Joint Venture. The project comprises: An underground longwall operation which produces a semi-hard coking coal and has reserves of approximately 65Mt and a mine life of around 18 years. An open cut truck and shovel operation which produces thermal coal (~40%) and semi-soft coking coal (~60%) with reserves of approximately 7Mt and mine life of about 2 years. An additional open cut operation which is currently undergoing its planning approvals which will produce approximately 7.7Mt over a 6 year life. There is also a potential extension of the existing open cut operation to the west. In April 2007 VALE acquired 100% share capital of AMCI Australia Holdings which included 61.2% of the Integra Complex. Integra Coal Overview

3 About Vale Vale is a global diversified mining company headquartered in Brazil. We are the second largest company in the global metals and mining industry, and employ more than 100,000 people. We strive to improve the technical and operational standards of excellence of our activities, guaranteeing our products and service quality in order to satisfy our customers the best way possible while generating value for our shareholders. Our diversified portfolio creates essential ingredients for products used by millions of people around the world in their everyday lives.

4

5 The coal business is the newest division in Vale. We intend to significantly grow this business to become an important part of the Vale portfolio, by growing off a platform of assets in Australia, Mozambique and China. Vale operates five Australian coal mines— currently producing 8Mtpa— and is involved in four significant growth projects in Australia at various stages of development. These operations are supported by management, marketing and administration teams at Head Office in Brisbane. Vale in Australia employs over 1,000 full time and contract employees. Our mines include Integra in NSW, and Carborough Downs, Broadlea and Isaac Plains in Queensland, while Ellensfield, Eagle Downs and Belvedere Projects are in various stages of feasibility study. Vale Coal

6 Overview  Integra Underground commenced development of the access drifts from the highwall of the North Pit of Camberwell Open Cut in  Longwall mining was commenced in 2002 with the first narrow (90m) longwall panel.  Subsequent longwall panels have been of varied widths up until Longwall 7 which was the first of the now standard 250m wide panels.  The mine has a planned production capacity of approximately 3.5Mt per annum.  Current operations are undertaken in the Middle Liddell seam, with plans underway to develop and mine the Hebden Seam, approximately 60m below.  ROM coal is transported by truck to the Integra CHPP where it is processed and loaded onto trains for transport to Newcastle.

7

8

9 Why is water management and road maintenance important? Safety Poor roads = increased risk in personal injury Morale Crew arrive in the panel in the right frame of mind Productivity Good roads allows for ease in moving around the mine Decreased travel time Cost Good standards will result in an overall decrease in road construction costs Poor roads will result in increase wear and tear on mobile plant

10 This is an example of roadway conditions when water management gets out of control.

11 The challenge for Integra Underground The Syncline Each panel gets to experience mining down dip, on the flat and up dip. This requires adjustments to water management.

12 Construction of roads commences in development Road construction has been incorporated in the development sequence. Key features are;  Trenching utilised with agricultural pipe  Road construction utilises gabbion, ballast and road sheeting. The road in “L1” heasding is constructed during production in “B” hdg.

13

14 Trenching

15

16

17

18 Final road conditions

19