VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step.

Slides:



Advertisements
Similar presentations
Defending the spread offense with the 3-5-3/3-3-5
Advertisements

How To Pull A Pre-Connect
How To Make Curtains & Drapes
Tent Pitching.
Assembly Instructions last updated October [NOTE: It is easier to assemble your Earthmaker on a non-skid surface. The Earthmaker can then be picked.
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
The making of a host of stars! FPC Advent Assemble the materials 6 pieces of Paper Scissors Stapler Tape, optional.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Expand Media Wall & Podium Case Training Video’s & Instructions.
Learning objectives: -
Changing the Oil in a 2006 Mitsubishi Eclipse. Introduction Changing the oil in your 2006 Mitsubishi Eclipse is easier than you may think. With a few.
2 Fire Fighter Qualifications and Safety Skill Drills.
Insert White, Black and Yellow Wires into Switch Terminals as Shown.
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.
Optical Manufacturing Solutions 1 Probe Assembly.
Oxygen Administration R/C MERT Medic Assistant Lesson V.
Stanley DS11 Diamond Saw.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Cutting Coulter Drive Wheel Lime Hopper Ripping Tyne & Fertilizer Application Tube Seed Hopper Fertilizer Hopper Draw Bar Seed Tube The Werner Zero Tillage.
Supplied-air hood Copyright © 2013 by The S.E.A. Group.
Pin Cushion Assignment HNC3CI Crowell Adapted from Fairy Face Designs.
Search and Rescue Trailer Bungay Fire Brigade 2013.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Throw Pillow Instructions 1) Cut fabric so that you have TWO 15x15 squares. Be as precise as possible with your measuring and cutting. 2) Iron your squares.
03800B RAIL PREHEATER.
N EXUS T YRE P UMP. L IFE IS FULL OF UNEXPECTED RESULTS.
Detaching the Loader from the Tractor 1). Place Bucket Leading edge on the ground and position point ‘A’ 20cm to 30cm from the ground. 2). Lower and adjust.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
ThermexWELD Exothermic Welding Training Guide
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Hoop Tech Clamp Assembly and Attachment. Contents of package.
Chapter 4: Sheet Metal Forming
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Google SketchUp Castle
David Peasley II. The Bench Grinder  Technically, it isn't a woodworking tool. However, a bench grinder belongs in every wood shop because of the number.
P pp Pp July Safety Meeting DOT Violations. Unsafe Driving 6 - Months What are our Top Violations? –Speeding – 10 Violations 6-10 MPH – MPH –
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
RS6 Hood Vent Templates and fab Instructions. You will need- Painters tape. 1” and 2”+ Aircraft paint stripper Tape measure mm T square Good pencil Drill.
High Pressure Lifting Bags
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
TIDBITS Hose made pryor to July 1987 will be taken out of service Hose that is frozen will be service tested again Color’d Hoses All test gauges.
Water Supply Skill Drills.
1 Fire Fighter Qualifications and Safety Skill Drills 2.
Job Performance Requirement Modified Gasner Bar Pack.
Part C  Accordion load  Lay the first length of hose in the bed on edge against the partition with the coupling at the rear of the bed  At the front.
WELDING TIPS Start at one end of pattern. Lay darkest pieces onto pattern. Line up with black lines, then lightly hot-tack into place at corners. Leave.
Ventilation Skill Drills.
HOSE ROLLS Straight roll ◦Lay the hose out straight and flat on a clean surface ◦Roll the male coupling over onto the hose to start the roll ◦Form a coil.
Zero Waste Garment Sewing Instructions
RIT Technician February Part 2 first quarter 2016.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Job Performance Requirement Horseshoe Load.
1) Place the open napkin in front of you 2) Fold the four corners into the middle of the napkin 3) Repeat the process a second time. 4) Turn the napkin.
Folding Fold a paper crane Prepare a square paper.
PURPOSE To enable coaches to take squash to schools. By going to the schools it makes it easy for the school as they don’t have to organise transport.
HOW TO MAKE AN Spring 2012 Origami Balloon By: SondraVojvodich.
Bernoulli Activity. Overview You will fold one piece of paper Size should be about ½ a sheet of notebook paper It is a quick demonstration of the Bernoulli.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
How To: Replace an LTR- 450R Suzuki Fuel Filter By Goigen (#11)
Pineapple Block based on the method by Karin Hellaby Created by Alicja Wygas.
INSTALLATION MANUAL FATL Machine Installing: ACTIVITY CHECK POINT 1. Minimum two persons required for opening the Machine. 2. Cut the straps & tape. 3.
Copyright © 2016 by The S.E.A. Group
Hot-Air Balloons.
Purpose Run / Timing FULL OVAL 8 STATION
Job Performance Requirement 10-16
Christmas Card Box Marcus P. Dula.
1/17/2019.
RTD - Ready-To-Dispense Dilution Control Chemical System using Quick Connect hookup at The College of William & Mary.
Job Performance Requirement 10-15
Presentation transcript:

VentStop V.C.U Step 6

Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step 8

Roll out back and front, inflation point must be on the front side. Quickly check condition of gate sides to ensure there are no sharps or other issues.

One person at each end, pull the Ventstop so it is as flat as possible, Un-fold top fabric from centre out to side wall and repeat other side. Ensure you end up with an even square shape.

When the unfolding is complete, re-check orientation. Step 9

Blow out your Air line, check to ensure you have Safety clips. Clamp the Venturi to the inflation flange with air flow pointing towards the Ventstop. Keep open end of Venturi off the ground. Step 15

Attach the air line to the quick connect fitting on the venturi, Keep the tap on the Venturi turned off.

Place the control box in a suitable location, and check that all taps inside the box are turned off before connecting.

Connect the first hose from mine air to the “AIR IN” side of the control box. Step17

Connect the second hose between the “AIR OUT” and the air fitting on the venturi.

Connect the blue sensor hose to the hose tail on the “AIR OUT” side of the box and fix in place with a hose clamp Step 16

Insert the other end of the sensor hose about 400mm into the flange located next to the inflation point and tighten.

Check the control box, make sure bypass valve is open and Regulator valve is closed. Turn on air commence inflation, keep open end of Venturi of the ground.

During inflation process, check for snagging or hook-ups e.g. Ventstop caught on side-wall, Excessive fabric caught under the front of the Ventstop. Step 31

You can assist the Ventstop by pulling down on the pulley ropes if these are available, or by pulling top corners away from the side wall.

Before full inflation is achieved check the orientation of the Ventstop Adjust top corners if required. Step 33

With Ventstop fully inflated and in the desired position, you have 2 choices, To operate directly from the Venturi, or operate via the control box. Step 34-35

If you are running directly from the Venturi, check that the Venturi has equalised, place hand over open end of Venturi, air should not be blowing or sucking. Step 36

Job done in 15 minutes