REVOLUTIONARY AUTOMATED SUBSOIL DRAINAGE INSTALLATION SYSTEM Important Notice This presentation and all information contained herein is commercial-in-confidence.

Slides:



Advertisements
Similar presentations
Welcome to Reed Construction Data Rob Wild - Managing Director September 2007.
Advertisements

Design Constraints For Engineering Projects
Case Study Flemington Drainage Of New Track. Flemington Racecourse is a major racing venue in Melbourne, the track due to its surface condition needed.
Who we are Blue Clarity are a team of experienced and diverse construction professionals whose expertise offers a bespoke CAD, survey and design package.
Legal Institutions Final Lecture. Final lecture: February 2011 The final lecture will be run as a Parliament. The business of the Parliament will be to.
Stormwater harvesting – standards, regulations and Industry practice Presentation to Recycle Water May 2013
Case Study Drainage at Koo Wee Rup Bus Terminal. With Koo Wee Rup expanding at the rate it is the bus terminal needed upgrading, the land where it is.
Microsoft ® Exchange Online Advanced Security Name Title Microsoft Corporation.
© 2014 Microsoft Corporation. All rights reserved.
Copyright John Townsend This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,
INTELLECTUAL PROPERTY
PRESENTED BY S.S.GEHLOT ADEN/BR/JU G.S. GAUTAM ADEN/JND S.P.VYAS AXEN/C/JU R. MATHUR AXEN/C/JP GUIDED BY SH. A.K.GUPTA PROF.TRACK-I IRICEN-PUNE.
Recycled Roads to Zero Waste Business Case. Background High % of waste starts with households and Councils collect it Quarry resources are finite and.
AVANT has created a long awaited new type of machine – a machine that, up to now, has been missing from the market. By using modern, advanced hydraulics.
Foundation Systems.
Amendment to GPDO Householder Permitted Development.
Applying Technology to Academic Advising: A Vision Statement Jeff von Munkwitz-Smith University Registrar University of Connecticut.
RAINWATER HARVESTING IN THE HOSPITALITY SECTOR
Conducting Effective Meetings. Information Where there is an interactive task within the programme it cannot be completed on- screen. It is suggested.
© COPYRIGHT ABCONSULTING Understanding Flight Operations For Manufacturers by Antoine BRU.
© COPYRIGHT ABCONSULTING Understanding Flight Operations - Part Two by Antoine BRU.
NYC Technology Forum Introduction to Test Automation 11/2/07 All rights reserved Not to be reproduced without permission Bill Rinko-Gay Solutions Director,
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
Sharing Information and Controlling Content: Continuing Challenges for Higher Education Susanna Frederick Fischer Assistant Professor Columbus School of.
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
PRESENTATION TO ROAD PAVEMENT FORUM 14 NOVEMBER 2002 PRESENTED BY NICO PIENAAR DIRECTOR - SARMA SOUTH AFRICAN READYMIX ASSOCIATION.
Conditions and Terms of Use
©AgustaWestland Ltd The contents of this document are the property of AgustaWestland Ltd and/or its subcontractors, and must not be copied, used by, or.
2011 Industry Sponsored Research Workshop INTELLECTUAL PROPERTY Michael Jaremchuk Associate Director CVIP Phone: FAX:
Problem: surface ponding. Solution: surface or subsurface drainage.
Constructionsite Roles in Construction Ron Gatepain.
March 26, 2003The Navigo Project Hans C. Masing, The University of Michigan Lance D. Speelmon, Indiana University An IMS and OKI Compliant Open Source.
Department of Civil Engineering,
Lecture 2 Introduction to Earthmoving
1 Professor Emeritus Ray Schroeder Director of Technology-Enhanced Learning University of Illinois at Springfield Copyright Ray Schroeder, This work.
Rethinking maintenance SUDSnet International Conference 2012 Multiple Benefits from Surface Water Management 4 th & 5 th September 2012, Coventry University.
Uriel Corporation One Westbrook Corporate Center Suite 300 Westchester, IL USA (708) Call to arrange fax.
London Underground Kingsbury to Wembley Park Embankment Stabilisation Brent Civic Centre 22 July 2015 Mark Hart – Communities Relations Manager Andrew.
Counseling for IIT/ NIT Aspirants Presented by YES Centre and The Hindu Group 16 June 2013, Hyderabad.
Basic knowledge Asphalt paving
EA204 Environmental Technology Stormwater Management Lot Grading & Easements.
MELBOURNE CRICKET GROUND RECONSTRUCTION Written by Gary Thomas.
Flood Prevention Measures The first six months of 2013 have seen a significant increase in flooding of both tertiary and machine installation. The following.
Joints for Diaphragm Walls
BEST PRACTISE Use of permeable paving As part of a new Railway Station in Bromsgrove a new car park was being installed. This permeable solution had to.
PATENT SEARCHING What is Intellectual Property? What is a Patent? It’s easy to confuse patents, copyright and trademarks.
The information stated herein is confidential and is accurate as of 25 May It is intended as a guide only and does not amount to legal advice. Professional.
PATENTED GERMAN ENGINEERED UNDERGROUND TANKS PATENTED ABOVE GROUND SLIMLINE TANKS WORLD CLASS FILTRATION WATERMARK APPROVED PUMPS AND CONTROLLERS RAINWATER.
End User License Agreement Permission to use and redistribute this Document is granted, provided that (1) the below copyright notice appears in all copies.
Rebuilding our regional centres in the context of the NDRRA Matt Bradbury, Partner Ben Yeoh, Senior Associate 11 October 2012.
Are You Looking For Solar Pool Heating Systems and Swimming Pool Heating Systems Provider in Australia ?
 171 Public wells sampled in 2014  Bacteria and Nitrate samples taken  38 wells inspected (Surveyed)  1 nitrite sample taken.
LP Consulting Pty Ltd A Consulting Engineering Firm LP Consulting Australia Pty Ltd is a boutique Consulting Engineering firm Australia that was established.
CIO Constituent Group Meeting
Using Parallelspace TEAM Models to Design and Create Custom Profiles
Coursework guidelines
Parallelspace PowerPoint Template for ArchiMate® 2.1 version 1.1
Parallelspace PowerPoint Template for ArchiMate® 2.1 version 2.0
DOCKLANDS STADIUM CONSTRUCTION
Project for OnLine Instructional Support (POLIS)
myIS.neu.edu – presentation screen shots accompany:
An App A Day Copyright Tina Oestreich and Brian Yuhnke This work is the intellectual property of the author. Permission is granted for this material.
Motivation for 36OU Open Rack
DISCLAIMER This document contains information that is confidential and proprietary to SC Group. It is being given to you only for the purpose of review.
All Africa Housing (PTY) LTD
 Engineering  Hydraulic Plans  Structural Engineering  Dilapidation Reports  Civil Engineering.
Life Cycle Analysis of Drainage Pipes
Trademark, Copyright, And Patents | Get physical and paper proof
Regulatory Environment
Chasm Institute Copyright Notice
Presentation transcript:

REVOLUTIONARY AUTOMATED SUBSOIL DRAINAGE INSTALLATION SYSTEM Important Notice This presentation and all information contained herein is commercial-in-confidence. All copyright, trademarks, patents and intellectual property are owned by Ditjet Intellectual Property Limited (Hong Kong). Confidential information shall not be copied, reproduced or forwarded to any parties, either in part or whole, without the written permission of Ditjet Intellectual Property Limited (Ditjet Australia). ASDI

Just as the CONCRETE PUMP has replaced the WHEELBARROW Ditjet has automated Subsoil Drainage installation INTRODUCTION: RAIN, HAIL, OR SHINE…

DITJET:  Introduces the agpipe, the gravel and wraps with the Geofabric - ALL IN ONE PASS!  Installs Y or T junctions and flush points in the agpipe in the same pass  Can run one or two pipes through, with the gravel, into the trench, simultaneously  One pass over an already excavated trench, results in an engineered and consistent continuous Subsoil Drainage length.  For long run drainage installations or for short subdivision work FUNCTION:

Speed of Installation  Up to 5 lineal meters per minute have consistently been achieved to date Quality Assurance  Delivers agpipe at consistent designed levels  Eliminates floating of the pipe in gravel during installation  Revolutionary all in one method which meets the standard for wrapped subsoil drainage Compaction  Ditjet is fitted with a large hydraulic vibrating unit to assist in the compaction of the gravel within the Subsoil drainage length. ADVANTAGES OF ASDI :

 Ditjet can be attached to excavators, trenching machines, towed by a tractor, to a purpose built machine with GPS Survey controls.  Ditjet can be produced in various shapes and sizes. From backyard models using as small as 50mm pipe, to major infrastructure using mega flow drainage pipe, strip drain. Applications  Mining, Agriculture, Sporting grounds, Racecourses, Domestic and Civil Construction, Road Construction, and Maintenance and Railways, etc. GOING FORWARD :

REVOLUTIONARY AUTOMATED SUBSOIL DRAINAGE INSTALLATION SYSTEM John Innes Corporate Legal Counsel Tel: +61-(0) Christopher Baxter Director and Patent Attorney Tel: +61-(0) Ron Slocombe Senior Commercialisation Team Clean Technologies/Waste Recycling Technologies University Centre Level Clarence Street Sydney Australia Sydney. Melbourne. Hong Kong. London

PROUD SPONSORS OF