ODU TNC - F Ant IF Cable CNT – 400 coax With TNC – M ODU Gnd. #6 L Surge arrestor With Type-N F-F connector CNT-400 Coax With Type-N –M Connector. IFU.

Slides:



Advertisements
Similar presentations
R&M Fiberliner LAN / WAN applications R&Measynet.
Advertisements

H/W Team R&D Center / BCS Dept. Installation of.
Unit 2- Electrical Components-continued EET 110 Electronics Survey I.
AIRCONDITIONER ERROR CODES
1 Telephone Connection. 2 Introduction The section instructs you on how to install a required phone line to every receiver.
SYSTEM 2000.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Cabling system components
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Chapter 10 – Electric Box Installation CHAPTER 6 BOXES.
Telecommunication Rooms
BOSE® link – Music Throughout Your Home
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Model 195E Series with Direct Mount Dual Diversity Antennas
Cabling UTP AND FIBER CABLING. Structured Cabling Infrastructure Mounted and permanent Allows patching Comfort that infrastructure is OK Components: Information.
Voltage Tester Electrical-Electrical Tools Image: voltageTester.jpg Height: 566 Width: 448 Used for testing voltage on electrical outlets, fuse clips,
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
UNIT 31 HOME ELECTRICAL SYSTEM
Tripping over the USB cable and catching your lap-top just in time. You step over cables or need to hold the harness wires up high to pass under it.
New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
Component Symbols & Information Prof. Dr. Moustafa M. Mohamed Vice Dean, Faculty of Allied Medical Science, Pharos University in Alexandria.
The first step in recording information on an electrical panel is to list the circuits according to the plan, realizing that each slot in the panel is.
1 Troubleshooting. 2 Introduction This section provides you with the necessary skills to effectively troubleshoot the DIRECTV System.
NetSure™ RDB Series.
Installation. Indoor Unit Installation Typical Installation.
160 BOOM ELECTICAL INSTALLATION. 160 BOOM CAB INSTALL INVERTER HARDWARE KIT (4) 10-32X3/4 (4) #10 Lock Washers (8) #10 Flat Washers (4) Nuts (2)
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Residential Wiring Facts
Figure 1: The GT-1000 Solar PV Technology Panel
INTRUSION ALARM TECHNOLOGY
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 25- Residential Improving your skill in code Look Up Increasing Speed Drill.
INTRUSION ALARM TECHNOLOGY
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Field investigation Installation site confirmation Roof-mounted.
Electric Wiring Hardware Identification Electric Wiring Hardware Identification By Dave Wilson Information Technology and Communication Services ITCS Instructional.
Radio Grounding for Lightning Protection? (The “electrical safety ground” and an “RF ground” are not effective as a lightning ground.)
Building Your LPFM Station Presented by John George.
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
1 Air Conditioning Breaker Panels and Disconnects.
University of Minnesota Unmanned Aerial Vehicle Research Lab Common Harness Wiring Instructions.
Design and Documentation Chapter 8. Network Design Issues Your first step in the process is to gather information about the organization. This information.
Voltage Tester Used for testing voltage on electrical outlets, fuse clips, and circuit breakers will test voltage from 120 to 600 volts.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Electrical Installation AMI- 17.0
Notes taken from Gillette’s Designing with Light.
Electric Wiring Conductor A material that allows electricity to move readily and offers low resistance Example: copper, aluminum and water.
Investigation into the Mounting of the 3M BRCP Splitter Blocks in the Whisper Cabinet 24 October 2008.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Use appropriate tools for network cabling and connections. Objective – 2%
Electrical Diagrams.
Lighting Branch Circuit and Small-Appliance Circuits for Kitchen
Lift up antenna at least 40ft height above the ground.
installing electrical system
SKYLINE SKYLINE HAS CHANGED THE WAY THE POLEBOX CARD SHOULD BE WIRED AND ALL FUTURE NEW INSTALLS WILL BE DONE THIS WAY. IF YOU GO TO A SITE TO WORK ON.
T400 Motor Replacement.
Conductors and Cables 2017 NEC
RV Solar Panel Installation
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
Wiring the Light and Relay
Errecting TMS-580 Control room CT /-PT Platform.
Identifying Electrical Tools and Equipment
Elements of a Small Off-Grid 24 Volt Solar System
General wiring procedure for a new instrument
Reader Swap out Guide.
Repairing the Electrical Components
Presentation transcript:

ODU TNC - F Ant IF Cable CNT – 400 coax With TNC – M ODU Gnd. #6 L Surge arrestor With Type-N F-F connector CNT-400 Coax With Type-N –M Connector. IFU NT Provided Jumper RG58- M-M Cable hangers 1.5 apart Cable Clip To the wall 4vertical spacing Tie wrap to Pipe 3 PipePipe Mount ODU Mount to 17 off-set Detailed Installation Of cables inside BTS is Covered in MOP-2 BTS X-Connect MOBI Interconnection Diagram #1 Surge Arrester will be grounded to Gnd inside the BTS IF Cable will be grounded before going horizontal

ODU TNC - F Ant IF Cable CNT – 400 coax With TNC – M ODU Gnd. #6 Cable Clip To the wall 4vertical sep Tie wrap to Pipe 3 PipePipe Mount ODU Mount to 17 off-set IFU Lightning Arrestors IF Cable CNT – 400 Ground BTS Cab Ext Cab DSX SPU TCCM Shelf SPU T-1 Note: T! will be connected to SPU into TCCM Shelf only after the cut-over & acceptance IF Cable will be grounded before going horizontal MOBI Interconnection Diagram #2

6 Main AC Power Panel 60 Amp CCT Brk PPC - MOBI ELTEC Outdoor CAB Rec #1 Rec #2 AC Plug Heat Exchange Wires are to be installed In MOBI Provided Conduit TB-1 Terminal On the inside The Terminal Strip could be Pre-wired to Recs, AC plug And Heat Exchange. Mobi would Run and terminate from PPC – TB-1 AC Connections between PPC & Outdoor Cabinet

20 A -2p 20A – 2p 15A-2p 10A – 2p Rectifier Shelf # 1 Rectifier Shelf # 2 HEX PPC Outdoor Cabinet A AC Receptacle Conduit between PPC & BTS to support AC wirers Main AC feed Option 1

20 A -2p 20A – 2p 15A-2p Rectifier Shelf # 1 Rectifier Shelf # 2 HEX PPC Outdoor Cabinet Conduit between PPC & BTS to support AC wirers Main AC feed Option 2 AC Receptacle