The Construction of Hoover Dam

Slides:



Advertisements
Similar presentations
Superdam by Mel Boring.
Advertisements

Between Nevada and Arizona
The Grand Canyon National Park
The Southwest A big rig tour….
The Failure of Teton Dam
The Grand Canyon. The Grand Canyon in Arizona was carved out of the Earth by erosion. Erosion is the process by which weathered rock and soil are moved.
Service Delivery 2 Water Rescues. Aim To give firefighters an overview of the techniques and hazards associated with water rescues.
Winter Hazards Ground Control. Introduction Winter weather can slow or completely stop surface mining operations. Winter weather can increase injury rates,
Report #5 Brief Description A laborer was steam cleaning a scraper. The bowl apron had been left in the raised position. The hydraulically controlled apron.
Risk Management Department
HOOVER DAM By Project Monsters Presenters: Nazimah Abdul Rahim Hakki Isik.
The Hoover Dam. The first concrete was placed into the dam on June 6, Since no structure of the magnitude of the Hoover Dam had been constructed,
Three Gorges Project, China Three Gorges Project, China This hydroelectric dam is the world’s biggest dam, producing 22,500MWh of earth-friendly electricity.
Concrete
By: AJ Parker Neff's Cave.
Foundation Systems.
UTAH COAL MINE COLLAPSE By Iona Evans & Jonathan Price.
Safety tips to avoid ladder injuries. Objective To be able to demonstrate the safe use of ladders that are used primarily for construction and/or maintenance.
Colorado River  What is a water shed?  What watershed do we live in?  An area that gets its water from one source.  We live in the Colorado River.
Coal By Cole Hudson. Opening Coal is an important resource that greatly improved industrial America from 1869 to During this time period, coal was.
Hoover Dam A MODERN MARVEL. Project Overview Why Build a Dam? Before the Hoover Dam was built, the Colorado River was dangerous and unpredictable. Towns.
‘The world’s greatest plumbing system’ An example of how a river is managed to use its water as a resource.
Design for Engineering Unit 7 Technology and society Annette Beattie August 15, 2006 Hoover Dam ETP 2006 – Annette Beattie This material is based upon.
Group D: Hector Hernandez Victor Liberato Roman Rios Tania Ramirez Luis Elias.
Fisheries: A Dwindling Resource By Ben James. How has the fish resource in British Columbia been effected over time?
Constructive & Destructive Forces
Nevada Geology in our State. Minerals in Nevada We mine for: –Gold –Silver –Copper –Gypsum –Lime –Diatomite –Limestone –Perlite –Magnesite –Lithium –Silica.
Geography of Ancient Egypt
It’s Time For... Southwest Jeopardy! Jeopardy $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100.
Intro to Concrete 18.0 & 19.0 Class notes.
Forces That Shape Our Earth: Erosion and Weathering.
11. 2 Water Energy Energy that comes from the push of water.
Chapter 2: Landforms of Georgia Lesson 4: How Do Humans Change Landforms? S5E1c: Students will relate the role of technology and human intervention in.
Teton Dam The Collapse and Disaster. Names TE 335.
Exploring U.S. Rivers and Mountain Ranges
Weathering and Erosion.
WHITE WATER PRACTICE SESSIONS - RIVER READING AND SAFETY
3 Easy Steps STEP 1: SITE SELECTION Select Area with Unsuitable Rock Types.
USA:Points of Interest Structures, Monuments, Buildings, Physical features, etc.
5.1 Our Water Resources Mrs. Trimble Mrs. Perryman Mrs. Roth.
Exploring U.S. Rivers and Mountain Ranges. A river is a large stream of water flowing through the land into a lake, ocean, or other body of water. There.
Glaciated Landscapes Corrie Deep rounded hollows with a steep back wall. After the ice has melted a lake will be formed behind the rock lip, the lake is.
Joseph Acevedo 607 Hydroelectricity.
Mathematics and Engineering.  Engineering uses many fields of mathematics Calculus Geometry and Trigonometry Optimization Algebra Logic  Mathematics.
The Berlin Wall. Building Of The Berlin Wall It was built on the night of August 13, 1961 East German government began to close the border. The border.
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
Alternative Energy: Hydroelectric Power
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
Walk-In Copy the question and answer in sentences: If a lake is a body of water surrounded by land, how can there be layers in a lake? Explain!
Extended Diploma Mechanical and Electrical Services Construction Dams and Reservoirs.
Weathering, Erosion, Deposition in TEXAS. Have you ever walked on a glacier? “Toe” of Matanuska Glacier Surface of Matanuska Glacier.
Hoover Dam Southwest Landform Example Michelle Klepper.
The Anasazi and Fremont Peoples
Hard v Soft Engineering You decide???. Hard v Soft Building a structure (often concrete and steel) to control the river. Essentially, dealing with the.
Glen Canyon Dam, Page, Arizona The Glen Canyon Dam is 710-feet (216-m) high. The concrete arch dam has a crest length of 1,560 feet (475 m) and contains.
Weathering and Erosion.
The Hoover Dam The dam was started in 1931 and used enough concrete to build a road from New York to San Francisco. The stretch of water it created, Lake.
Weathering and Erosion.
Wave action and coastal landforms
How I Made My Bustier….
Weathering Test Review
Hoover Dam.
The Southwest A big rig tour….
HUMAN IMPACT FROM CLIMATE CHANGE
Higher Glaciation - Erosional Features
Unit 3 Nature’s Energy 1.
The Southwest A big rig tour….
Geography Knowledge Organiser: Year 7 Unit 6 – Rivers
Presentation transcript:

The Construction of Hoover Dam Technical problems and Solutions

Hoover Dam

Lake Mead

The Dam Located on the border between Arizona and Nevada Blocks the Colorado River Hoover Dam created Lake Mead behind it Construction began 1931, initially on the four tunnels used to divert the river away from the building site

The Dam Construction of the actual dam began 1933 Nothing of this magnitude had ever been attempted before As a result there were many problems with untested solutions

Site Preparation River water diverted This was done using four tunnels, two either side of the canyon In total the tunnels spanned a length of 16,000 feet (3 miles) The tunnels were dug out using dynamite

Site Preparation Scaling the cliff walls and removing any loose rocks This work was needed to ensure that when the dam was built it would stay firmly in place and not crumble away at the edges

‘High Scalers’ The men who were given the job became known as ‘High Scalers’ The workmen were required to hang from ropes off the edge of the cliff and use jackhammers and dynamite to blast off loose rock They weighed 44lbs

High Risk Many men died from falling tools or slipping and falling off the cliff As a result the men invented hardhats to stop them getting fractured sculls from falling objects They did this by filling cloth hats with tar

Rescue A spectaculuar example of the dangers involved is a story of a man who slipped and fell. 25 feet below another worker leapt off the cliff, holding onto his rope, and caught the man’s foot. Another worker pinned the man to the cliff until he could be rescued.

‘High Scalers’

Construction Construction began in 1933 The first problem engineers faced was the sheer amount of concrete needed to build the dam A site to make concrete was first built upstream and later one was built on the edge of the canyon

Problems Another problem faced was the fact that concrete produces heat as it sets. Had the dam been created in one pour, the heat generated would have meant the dam would not have set for 125 years. This would have created cracking and erosion.

Another solution A solution was devised by engineers The dam was to be built with a series of concrete pillars, trapezoidal in shape, joined with interlocking grooves When set, the blocks were pressure grouted together

Blocks of concrete

Problems and Solutions Pouring the concrete in separate blocks was only part of the solution to the concrete problem The dam was in the middle of the desert and the heat was setting the concrete too fast

Pipes To solve this problem, a system of pipes was woven throughout the concrete and filled with cold water. This slowed down the setting process Later the pipes were removed and the holes filled with grout