Cross-regional roadmap for Long- Term Transmission Rights XXI Florence Forum Florence 5 December 2011.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
- GDP 2011 versus 2010 – increase by 5.5%
TITRE Public Workshop on REMIT Ljubljana, 19 July 2012 Issues for the 2 nd edition of the ACER Guidance on the application of REMIT Volker Zuleger Seconded.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Vision for the internal electricity market
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
09/12/2011 NWE Stakeholders Group meeting-London Getting to 2014 A contribution from the Regional Initiatives Process Christophe Gence-Creux Head of the.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Madrid, 19 th November 2012 Roadmap implementation CAM 20 th IG meeting.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
EU Developments Transmission Workgroup 6th October 2011.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
REMIT in practice: data collection, market monitoring and stakeholder responsibilities Erik Rakhou Seconded National expert, Market Monitoring Department.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
European Commission views on intra-day and balancing markets
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
European Developments Transmission Workgroup 3 rd May 2012.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
Cross-regional roadmap for Long-Term Transmission Rights
Public Consultation : main conclusions (1/2)
Cross-regional roadmap on capacity calculation and long-term capacity allocation Impact for the FUI regional roadmap Work document FUI Implementation Group.
ACER’s view on the future role of the Gas Regional Initiative
ERGEG Benchmarking report on long term transmission rights
Presentation transcript:

Cross-regional roadmap for Long- Term Transmission Rights XXI Florence Forum Florence 5 December 2011

2. Purpose of cross-regional roadmaps: to identify key milestones, both at EU and regional level, and accountabilities to increase consistency between and across the regions and thus efficiently pave the way for the completion of the Internal Electricity Market by Draft cross-regional roadmap based on: regional consultation and contribution to the European energy work plan; Input from AESAG; Stakeholder comments to earlier drafts; Discussion at ACER coordination group for ERI; FG on CACM. Background

3 Harmonisation of the allocation rules (1/4). CWE-CSE Q4 2011: Approval procedures and entry into force of the HAR rules (NRAs + TSOs); firmness in line with the CACM FG at least in CWE. FUI+Britned (no common rules), CEE Q4 2011: first step harmonisation - Firmness not yet addressed (NRAs+ TSOs). SWE Q2 2012: IFE will implement the HAR with CASC Q4 2012: IPE - FTRs options by CASC (TBC Q1 2012). NRAs’ decision on the type of products (TRs or CfDs) » At the latest Q2 2012: Nordic region, between Nordic and Continent (See the project plan in annex) » At the latest Q4 2012: Baltic

4 Harmonisation of the allocation rules (2/4). All regions: Q1-Q » Comparison of the auction rules with the HAR CWE-CSE rules and CACM FG (ACER) » Elaboration of a common wish list for a single European set of allocation rules (e.g. buybacks of TRs to be considered) (ACER+ENTSO-E in close consultation with stakeholders) » Elaboration of a workplan with clear milestones for each region (ACER+ENTSO-E in close consultation with stakeholders) with a focus on how to implement firmness  An ad-hoc ACER TF * + ENTSO-E TF to be created  Regular meetings ** between ENTSO-E and ACER TF * ToR and organisation of the TF will be defined in January 2012 ** The timetable will be defined at the January meeting

5 Harmonisation of the allocation rules (3/4). Toward a common set of allocation rules: All regions » Q Q2 2013: Drafting* of the common rules  ENTSO-E, in close co-operation with stakeholders » Q3-Q4 2013: Approval procedures and entry into force of the rules (NRAs + TSOs); * Decision to move towards FTRs is necessary * Overlaps between the drafting of NC and the drafting of the common rules should be tackled by ACER/NRAs

6 Harmonisation of the allocation rules (4/4) Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 CWE F F CSE CEE SWE FUI Elaboration of wishlist + workplan on rules harmonisation Drafting of the rules NRAs approval procedure N.B. - Q1 2014: compliance with NC adopted by comitology - Nordic, Baltic: pending of NRAs decision (Q2 2012, Q respectively) - SWE: IFE in CASC with HAR mid 2012

7 Harmonisation of the allocation platforms. CWE, CSE, SWE (IFE, from mid 2012, IPE TBC): CASC. NE, NE – Continent, Baltic joining existing platform depending on the decision of Q and Q (resp.). CEE: CAO. FUI + Britned: not a common allocation platform but same IT provider. At the latest by mid 2013: decision (NRAs+TSOs) to merge or not the existing allocation platforms based on a CBA performed by ENTSO-E.* * CBA shall especially take into account the foreseen phase-out of daily explicit auctions (replaced by market coupling), the wish list for a single European set of allocation rules (Q3 2012) and the agreed regional workplans for implementation

8 Harmonisation of the nomination process. Q1-Q2 2012: » Comparison of the current LT nomination procedures (ENTSO-E), taking into account existing rules & standards. Q3-Q4 2012: » Definition of a wish list for harmonisation based on the decision to move towards FTRs (ACER+ENTSO-E) » Agreement on an implementation schedule (ACER+ENTSO-E). By 2014: » Implementation and compliance with the CACM FG

9 Possible implementation of FTRs (1/2). Q4 2011: » EC study on long term TRs » Assessment of the legal consequences to move towards FTRs (would MiFID legislation be applicable and if so which impacts on the allocation platforms?)  ACER deliverable, in coordination with ENTSO-E and stakeholders.. Q1-Q2 2012: » Analysis on the possible design and implementation of FTRs (e.g. day-ahead processes, financial issues and SoS) based on EC study on TRs  ENTSO-E deliverable, in co-operation with ACER  Stakeholders consultation on potential FTRs design

10 Possible implementation of FTRs (2/2). Q3-Q4 2012: » Elaboration of a pan-European implementation planning to move to FTRs*  ENTSO-E and ACER, in close consultation with stakeholders * subject to the conclusions of the legal analysis and impact assessment * if necessary, the work on common allocation rules should be adapted accordingly

11 Disclaimer ACER and the Electricity Regional Initiative coordination group have completed the elaboration of a European Energy Workplan The European Energy Workplan consists of four cross-regional roadmaps which identify milestones and responsibilities for implementation of a common European approach to cross-border electricity trading by To agree the four cross-regional roadmaps, the seven electricity regions developed a regional input to the European Energy Workplan. The seven regional inputs were developed in discussion with TSOs and member states and consulted on with regional stakeholders. The regional inputs explain each regions contribution to completing the internal electricity market. The four cross-regional roadmaps have been developed and agreed on the basis of the regional inputs. As a result of this process the cross-regional roadmaps and regional inputs may not be completely consistent. However, ACER and the National Regulatory Authorities have agreed that the European Energy Workplan consists of only the four cross-regional roadmaps. This means that, if any inconsistency remains between the seven regional inputs and the four cross-regional roadmaps, stakeholders should consider that the cross-regional roadmaps prevail.

12 Thank you for your attention

13 Annex Long term transmission rights and long term hedging between the Nordic Region and Europe and internal NE borders Project plan – October 2011

14 Objective for borders between Nordic and continent. Decision on what type of Long Term Transmission rights products to be allocated and the allocation platform to be used. Relevant borders: NordNed, DK1-DE, Kontek, Baltic Cable, SwePol link, Estlink (and future connections from the Nordic market and other areas).. Bilateral decision on each border, though based on » General assessment (end 2011) » Common criteria, to evaluate different options at a given border (end 2011) » Stakeholder feedback (Q1 2012). Information to ACER on future products (TR or CfDs) in Q Write note/memo to describe current situation and. Consult stakeholders. Inform ACER on decisions made.

15 Objective for borders within Nordic. Current market setup gives market participants the opportunity to hedge their positions via CfDs. Compliant with CACM FGs. Task Force within NordREG will analyse possibilities of supplementing the system with FTRs. Challenge of 4 Swedish price zones. Work within first half of 2012

16 Milestones Num ber DescriptionCommentsDate M1Project plan approved Approved at meeting in Brussels 9/ M2Note/Document finalized Note describing principals for decisions on the cables. 16/ M3Design of public consultation/questions January 2012 M4Public consultation and/or workshop February-March 2012 M5M5Evaluation of stakeholders’ feedback April 2012 M6M6Final decision within TF May 2012 M7M7Decision of RCC on letter to ACER June 2012

17 Detailed Work Plan Nov – Dec 2011 TaskDate Project plan distributed to members 3/11 Drafting team submit contribution – 1st draft of note distributed 8/11 Meeting in Brussels 9/11 Drafting team – submit contribution to 2nd draft of note 18/11 2nd draft of note distributed 25/11 Phone conference 2/12 – 2012 (11 am – 1 pm) 3rd draft of note distributed 7/12 Deadline for comments 12/12 Phone conference 14/12 Report finalized 16 /12 Project plan distributed to members 3/11 Drafting team submit contribution – 1st draft of note distributed 8/11

18 Detailed Work Plan November – December 2011 (cont.) TaskDate Meeting 16/01 – 2012 (Stockholm) Workshop 14-15/ (Stockholm ?) Public consultation February-March 2012 Conclusions/Decisions communicated to e.g. ACER June 2012

19 Drafting team and Working group NameCountry Drafting team Markus HübnerDenmark Vidar SlettehaugNorway Margareta BergstrømSweden Jan-Welf SelkeGermany Katarzyna SmagielPolen Working group Timo PartanenFinland Mathieu FransenNetherlands Interested Parties Christophe Gence-CreuxACER Adeline Lassource/Christophe CessonCRE