Masters Monthly Report Region Europe April. Volvo Construction Equipment 2 European Masters 2009 April report  All dealers will have different time plans.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
We need a common denominator to add these fractions.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
Exponents You will have 20 seconds to complete each of the following 16 questions. A chime will sound as each slide changes. Read the instructions at.
Board of Early Education and Care Retreat June 30,
0 - 0.
1 1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Combine Like Terms. Simplify the Given Expression Below:
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Volvo Construction Equipment VOLVO CE MASTERS
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
Presentation transcript:

Masters Monthly Report Region Europe April

Volvo Construction Equipment 2 European Masters 2009 April report  All dealers will have different time plans for their local competitions  However the over all European time plan (see next slide) is valid  Posters, pens and socks are sent out to promote the local competitions. Awaiting caps and jackets

Volvo Construction Equipment 3 European MASTERS time plan 2008 JanFebMarAprMayJunJulAugSepOctNovDec Week 3 questions out to markets Competition round 1 and 2 Winning team reported to Masters administration European final in Konz week48

VOLVO CE MASTERS 2009 Denmark April

Volvo Construction Equipment 5 Region Denmark– Monthly Report  Reporting that the teams answer are evaluated.  This means that there are 5 teams left, for a final competition in DK.  The final competition in DK, will be hold 30. May.  The competition will be a mix of theoretical questions and practical exercises.

VOLVO CE MASTERS 2009 Poland April

Volvo Construction Equipment 77 Time plan - POLAND  Masters 2009 presentation, MASTERS 2009 Rules and Regulations translated and published on our local service Website,  Posters about MASTERS 2009 exposed in service depots  Local competition qualifications –Week 12 : Technical Department meeting, discussion about MASTERS 2009 –Week 14 : every service technician with enough experience will get questions from previous competition to be answered –Week 16 : answers from service technicians applying for competition expected –Week 24 : ( ) Local Masters competition in regions; Questions from MASTERS 2007 and sent out by MASTERS 2009 administartion to be used. Practical tasks on machines should be included; – ONE team from every depot selected for main competition in Poland till

Volvo Construction Equipment 88 Time plan –Week 35 : ( till 27) Main competition in Poland Used selected questions from year 2007 and sent out by MASTER administration; – : TEAM from Poland announced to MASTERS 2009 Administration

VOLVO CE MASTERS 2009 Finland April

Volvo Construction Equipment 10 Time plan  Finland will start week 17-18

Volvo Construction Equipment 11 Participating dealers/ total participants  All Volvo Ce Finland branches  Totally 55 mechanics  Totally 10 parts salesmen

VOLVO CE MASTERS 2009 Iceland April

Volvo Construction Equipment 13 Time plan  First competition will end 20 april  Second will end 1 june

Volvo Construction Equipment 14 Participating dealers/ total participants  Brimborg ehf  10 Mechanics  4 Parts people

VOLVO CE MASTERS 2009 Kuiken April

Volvo Construction Equipment 16 Time plan Kuiken The Netherlands Local Dutch qualification: one (1) half day – date not final yet - somewhere in May - where we will organize the Volvo Masters Dutch Finals. Same date & time on all branches for all participants

Volvo Construction Equipment 17 Participating dealers/ total participants Over the 7 branches we have approx 85 Field engineers & parts personell participating (= 70% of potential)