American Recovery and Reinvestment Act of 2009 ITS - Georgia Chapter May 28, 2009.

Slides:



Advertisements
Similar presentations
Michigan Department of Transportation Michigans Infrastructure Needs and Funding 2013.
Advertisements

ARRA Reporting School Level Expenditure Report February 12, 2010 (SLER)
Superintendents Quarterly Meeting March 13, 2009.
2011 State and Local Fiscal Outlook. 2 State and Local Governments in the U.S. Economy Major employer (about 14 percent of total U.S. employment in 2009)
Impact of Federal Funds to Statewide Project Management and Program Update American Society of Highway Engineers September 13, 2011.
Human Service Transportation Plan UPDATE Illinois Department of Transportations Division of Public and Intermodal Transportation: Downstate (Rural) Area.
Mn/DOT Economic Recovery Program Update Feb. 19, 2009.
2009 Roadway Conference April 20, 2009 Cathy Nelson, Technical Services Manager / Chief Engineer.
ARRA Update All funds were obligated by Of the funds programmed with FHWA, 80% has been expended Allowance for funds released after –Must.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
South Carolina Community Development Block Grant Program American Recovery and Reinvestment Act CDBG-R Recovery Funds Implementation Guidelines.
Overview of Moving Ahead for Progress in the 21 st Century (MAP-21) Safety Requirements National Webinar February 28, 2013.
Richmond House, Liverpool (1) 26 th January 2004.
November Overview of Presentation MAP-21 Overview Outline of the FY 2013 Apportionment Notice Key Provisions and Interim Guidance – Planning and.
1 The American Recovery and Reinvestment Act of 2009 (ARRA) Enacted February 17, 2009.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
1 FTA AND THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 ITS Georgia Luncheon May 28, 2009.
Week 1.
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
1 Single Audit Legislative Audit Bureau September 2009.
1 The American Recovery and Reinvestment Act of 2009 (ARRA) Satvinder Sandhu & Frances Sakaguchi, FHWA.
1 American Recovery and Reinvestment Act of 2009 Association of Government Accountants May 12, 2009 Robert J. Tuccillo Chief Financial Officer Federal.
1 American Recovery and Reinvestment Act of 2009 (ARRA) Enacted February 17, 2009.
1 Federal Transit Administration Update The American Recovery & Reinvestment Act of 2009 Virginia Transit Association Annual Meeting June 8, 2009.
June 2009 American Recovery and Reinvestment Act of 2009 TIGER Discretionary Grant Program.
Review of TIGER Grant Outcomes (Transportation Investments Generating Economic Recovery) Board of Directors March 31, 2010.
Implementation of the FY 2010 Federal Transit Program and other “Hot Topics” December 8, 2010.
Highway Improvement Program Funding Status With ARRA Rhode Island Department of Transportation April 8, 2010.
1 Transportation Update. 2 Overview Pre-legislative effort The American Recovery and Reinvestment Act of 2009 (ARRA) – Highway – Transit – Discretionary.
Preparing To Receive Economic Stimulus Funds An APTA Webinar Hosted In Conjunction With The Federal Transit Administration February 13, 2009.
Office of Infrastructure Investment 1 Jeffrey A. Simon Director of Infrastructure Investment.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
American Recovery and Reinvestment Act Overview Local Government Officials April 8, 2009.
“Talking Freight” Presented by the Federal Highway Administration United States Department of Transportation July 27, 2011.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
East-West Gateway Council of Governments February 25, 2009 American Recovery and Reinvestment Act: Transportation Elements.
FY 2012 President’s Budget Released February 14, 2011.
GEORGIA DEPARTMENT OF TRANSPORTATION INTERMODAL DIVISION - TRANSIT Presented to G.A. MPO CONFERENCE November 2012.
1 North Carolina Department of Transportation Financial Overview Mark L. Foster April 20, 2010.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
UCLA Lake Arrowhead Symposium Transportation and the Recovery Act.
RALPH COMER TENNESSEE DEPARTMENT of TRANSPORTATION January 19, 2010 THE ASSOCIATION OF GOVERNMENT ACCOUNTANTS TDOT's Approach to Economic Stimulus Funding:
Managing Multimodal Projects Within a Corridor Scott Greene Federal Railroad Administration February 10, 2011.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
The American Recovery and Reinvestment Act of 2009 (Recovery Act) Data Reporting Federal Highway Administration September, 2009.
1 Colorado Department of Transportation Presentation to the Joint Budget Committee November 16th 2009.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
1 American Recovery and Reinvestment Act of 2009 (ARRA) Enacted February 17, 2009 Presentation for Georgia Stakeholders FTA Region IV Office February 25,
1 American Recovery and Reinvestment Act of 2009: Challenges Facing the Department of Transportation and the Office of Inspector General’s Strategy for.
Implementation of the American Recovery & Reinvestment Act (ARRA) of 2009 FHWA Georgia Division February 25, 2009.
1 Louisiana: Our Energy Future 2009 American Recovery & Reinvestment Act.
1 CONNECTICUT DEPARTMENT OF TRANSPORTATION’S ARRA REPORTING June 1, 2009 R2 CTDOT Internal Version.
Transportation Equity Act for the 21st Century TEA-21 Prepared by Iowa Department of Transportation September 1998.
Presented by: Peter Loughlin September 23, THE PAST YEAR September 30, 2009 Program Expired Short Term Extensions – GF Transfers $8b in 08, $7b.
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
American Recovery & Reinvestment Act Discussion February 13, 2009.
OSAE sets the PACE: Premier Auditing Consulting and Evaluations! American Recovery and Reinvestment Act (ARRA) Readiness Review.
Nathan Pryor Eileen Yazzie February 17, 2009 American Recovery and Reinvestment Act of 2009 Working Group Meeting #2.
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
The American Recovery and Reinvestment Act of 2009
Preparing To Receive Economic Stimulus Funds
Presentation transcript:

American Recovery and Reinvestment Act of 2009 ITS - Georgia Chapter May 28, 2009

2 Outline Overview Overview Funding Distribution Funding Distribution Requirements / Provisions Requirements / Provisions Transportation Funding For Georgia Transportation Funding For Georgia U.S. DOT Discretionary Grant Program (TIGER Grants) U.S. DOT Discretionary Grant Program (TIGER Grants) Accountability and Transparency Accountability and Transparency Reporting Reporting FHWA Stewardship & Oversight FHWA Stewardship & Oversight ARRA Sign Guidance ARRA Sign Guidance Additional Information Additional Information

3 Overview Signed into law on February 17, 2009 Signed into law on February 17, 2009 To retain and create jobs To retain and create jobs Infrastructure investment Infrastructure investment Accountability and transparency Accountability and transparency

4 Overview $48.12 Billion for TRANSPORTATION $48.12 Billion for TRANSPORTATION $27.5 Billion for Highways $27.5 Billion for Highways $8.4 Billion for Transit $8.4 Billion for Transit $9.3 Billion for Rail $9.3 Billion for Rail $1.5 Billion for Discretionary Program $1.5 Billion for Discretionary Program $1.3 Billion for Aviation $1.3 Billion for Aviation $0.12 Billion Misc. Other Transportation $0.12 Billion Misc. Other Transportation

5 Requirements/Provisions Eligible Uses Eligible Uses Restoration, repair, construction and other activities under Surface Transportation Program Restoration, repair, construction and other activities under Surface Transportation Program Passenger and freight rail transportation and port infrastructure projects described under TIFIA Passenger and freight rail transportation and port infrastructure projects described under TIFIA Federal share up to 100% Federal share up to 100% No waivers of Federal Requirements No waivers of Federal Requirements Use It or Lose Provisions- Strict Obligation deadlines Use It or Lose Provisions- Strict Obligation deadlines

6 Project Selection States in establishing priorities for funding; priority is given to projects that are: States in establishing priorities for funding; priority is given to projects that are: Three year completion date (February 12, 2012) Three year completion date (February 12, 2012) Economically Distressed Areas (map by county) Economically Distressed Areas (map by county) Expeditious Project Delivery Expeditious Project Delivery Maximizing job creation and economic benefit Maximizing job creation and economic benefit

7 Transportation Funds for Georgia Total Highways Spending in GA: $931,585,680 For any federal highway purpose under STP program. 100% federal share. $624,162,406 for projects in any area 50% obligated in 120 days, rest within one year of apportionment. $279,475,704 for MPOs and areas with population less than Obligate within one year of apportionment. $27,947,570 for Transportation Enhancements 50% obligated in 120 days, rest within one year of apportionment.

8 Georgia’s Highway projects 1 st 1511 certification (April 7, 2009) 1 st 1511 certification (April 7, 2009) 67 projects - $207,972, projects - $207,972,026 2 nd 1511 certification (May 4, 2009) 2 nd 1511 certification (May 4, 2009) 51 projects - $187,147, projects - $187,147,222 ITS / Traffic Operations ITS / Traffic Operations 14 projects - $19,853, projects - $19,853,356

9 Discretionary Grant Program (TIGER Grants) $1.5 Billion $1.5 Billion Highways, transit, intermodal/port access Highways, transit, intermodal/port access Significant impact on Nation, metropolitan area, or region Significant impact on Nation, metropolitan area, or region Preference for projects to be finished in 3yrs Preference for projects to be finished in 3yrs Grants between $ million Grants between $ million Federal Register Notice- May 18, 2009 Federal Register Notice- May 18, Applications Due September 15, 2009 Applications Due September 15, 2009

Accountability and Transparency

11 Reporting Types of Reports Types of Reports Certification Certification Periodic Periodic Quarterly Quarterly Data for Periodic and Quarterly Reports Data for Periodic and Quarterly Reports Projects Projects Finance Finance Jobs Jobs

12 FHWA Stewardship & Oversight Delivery of ARRA is top priority for FHWA Delivery of ARRA is top priority for FHWA Projects must follow all Federal requirements Projects must follow all Federal requirements Projects will be advanced under maximum flexibility Projects will be advanced under maximum flexibility Projects will be administered in accordance with our normal Stewardship Agreements Projects will be administered in accordance with our normal Stewardship Agreements

13 Higher level of accountability and increased attention by GAO and OIG expected Higher level of accountability and increased attention by GAO and OIG expected FHWA ARRA Risk Plan FHWA ARRA Risk Plan Financial Management and State oversight of local projects will be areas of particular attention Financial Management and State oversight of local projects will be areas of particular attention FHWA Stewardship & Oversight

14 ARRA Project Sign

15 ARRA Project Sign: Guidance Sign Design Sign Design Sign design layout and color should be similar to the design shown on previous slide Sign design layout and color should be similar to the design shown on previous slide Sign Placement Sign Placement Should be easily identifiable with ARRA project Should be easily identifiable with ARRA project Should not obscure other traffic control devices Should not obscure other traffic control devices Should not be placed near key decision points Should not be placed near key decision points

16 Additional information FHWA ARRA Website FHWA ARRA Website Summary of Highway Provisions Summary of Highway Provisions TIGER Grants TIGER Grants Implementing Guidance Implementing Guidance Frequently Asked Questions Frequently Asked Questions GDOT Federal Economic Stimulus Website GDOT Federal Economic Stimulus Website ulus/Pages/default.aspx ulus/Pages/default.aspx

17 Contact Information FHWA Georgia Division FHWA Georgia Division Sabrina David, AICP (404) Georgia Department of Transportation Georgia Department of Transportation Meg Pirkle (404)