May 2002 LTV & VNK Managing the Safety of Flood Defences in the Netherlands Fola Ogunyoye Presented on Friday 17th May 2002 at the IMPACT Project Workshop,

Slides:



Advertisements
Similar presentations
United Nations Statistics Division
Advertisements

Advanced Project Schedule Risk Analysis
IT’S IN THE EYE OF THE INSPECTOR Overview of visual inspection methods in four countries and lessons learned ISFD4, Toronto 6 May 2008 Jaap Flikweert.
Assessing Uncertainty when Predicting Extreme Flood Processes.
Stability and Failure Mechanisms of Dams A dam safety research project Kjetil Arne Vaskinn.
Federal department of environment, transport, energy and communications ETEC Federal Office for the Environment FOEN Risk Assessment on Pipelines: the.
November 10, 2010 High-Water Protection Programme Anske van der Laan, Technisch Manager. Ministry of Infrastructure and the Environment.
Analysis of dike breach sensitivity using a conceptual method followed by a comprehensive statistical approach to end up with failure probabilities 4 th.
Closing breaches in earthen flood defences Technical feasibility of emergency closure concept.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Risk based internal auditing – an introduction Slides of figures and appendices ©David M Griffiths V3.2 ©David M Griffithswww.internalaudit.biz.
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
Donegani Anticorrosione S.r.l
ProCognis SOX 404 & COSO Implementation Presentation
World Bank’s new methodology In Country procurement assessment World Bank’s Methodology for Procurement laws: back to country systems?
Conclusions, planning and prospects Follow-up committee meeting 6 October, Leuven.
Efficient Methodologies for Reliability Based Design Optimization
Quality evaluation and improvement for Internal Audit
New Approaches for Flood Risk Management in the Netherlands
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Page 1 Vienna, 03. June 2014 Mario Gavrić Croatian Bureau of Statistics Senior Adviser in Classification, Sampling, Statistical Methods and Analyses Department.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Toronto, May 6-8, 2008Flood Defence1 Risk assessment in trans-boundary cooperation between the Netherlands and Germany Jan Stijnen.
Conducting the IT Audit
Codex Guidelines for the Application of HACCP
Internal auditing for credit unions Nuala Comerford, Chair IIA Irish Region Committee Pamela McDonald Council Member IIA Credit Union Summer School Thursday,
IAEA International Atomic Energy Agency US NRC Approach for Seismic Hazard Assessments INTERNATIONAL WORKSHOP ON LESSONS LEARNED FROM STRONG EARTHQUAKES.
VETiS Moderation meetings – November 2012 Welcome to the Australian Institute of Education and Training.
Analysis and Management of Risk: A Regulator’s Perspective Michael Ainley Head of Wholesale Banks Department UK Financial Services Authority.
Improving Corporate Governance in Malaysian Capital Markets – The Role of the Audit Committee Role of the Audit Committee in Assessing Audit Quality.
US Army Corps of Engineers BUILDING STRONG ® Prioritizing Investments within the USACE Levee Safety Program Process and Methodology Overview Jason Needham,
Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling.
Hydrologic Design Reading: Applied Hydrology Sections 13-1, 13-2.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
BREACH FORMATION A Review of State-of-the-Art Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 16/17 May 2002.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions 1 What is Engineering Risk and Reliability? Why We Use It? Robert C.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
S J van Vuuren The application of Genetic Algorithms (GAs) Planning Design and Management of Water Supply Systems.
Risk Factor Analysis - A New Qualitative Risk Management Tool
Reducing the Risk of Embankment Failure Under Extreme Conditions Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 17 May 2002.
1 Identifying Properties at Risk of Flooding Duncan McLuckie Principal Flood Specialist NSW Office of Environment and Heritage Department of Premier and.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First Regional Workshop, Tunis January Cross-cutting issues to.
EPSRC Grant: EP/FP202511/1 WP4.4 A Rapid Embankment Breach Assessment (AREBA) Myron van Damme Sept 2011.
1 / 12 Michael Beer, Vladik Kreinovich COMPARING INTERVALS AND MOMENTS FOR THE QUANTIFICATION OF COARSE INFORMATION M. Beer University of Liverpool V.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Life Cycle Assessment: Framework. Goal: Life cycle THINKING Many “centers” on campus have seminars with lunch and drinks provided. How should drinks be.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Topic 6 Managing stage boundaries
C.H. Montin, Manama 11 Manama, 20 January 2014 Regulatory Impact Assessment for Better Standards International Best Practices from OECD Charles-Henri Montin,
David Moser USACE Chief Economist
E-PRTR incompleteness check Irene Olivares Industrial Pollution Group Air and Climate Change Programme Eionet NRC workshop on Industrial Pollution Copenhagen.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
IMPACT 4 November 20044th IMPACT Workshop - Zaragoza1 Investigation of extreme flood Processes and uncertainty Model uncertainty How uncertain are your.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
DESTination RAIL Decision Support Tool for Rail Infrastructure EU Project No Railway Pro Investment Summit Building the New CEE Railway Economy.
Overview of the handbook Chapter 5: Levee inspection, assessment and risk attribution.
International Levee Handbook Overview of the handbook Chapter 8 Physical processes and tools for levee assessment and design.
INFORMATION DISASTER PREPAREDNESS PLANNING (IDPP).
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
INTERCONNECTION GUIDELINES
UNECE Work Session on Gender Statistics, Belgrade,
Sally Kendall Department of the Environment, Transport and the Regions
CATHCA National Conference 2018
European Commission, DG Environment Air & Industrial Emissions Unit
ETBI Annual Conference for Principals and Deputy Principals
Flood Protection Hollandsche IJssel
Presentation transcript:

May 2002 LTV & VNK Managing the Safety of Flood Defences in the Netherlands Fola Ogunyoye Presented on Friday 17th May 2002 at the IMPACT Project Workshop, HR Wallingford, UK

May 2002 Managing the safety of flood defences in the Netherlands Manual for safety assessment of flood defences (LTV) Background to study Methodology Assessment process Example Quantifying safety against flooding (VNK) Management philosophies –Present –Future Current status of project

May 2002 LTV: Framework & assignment LTV: Manual for Safety Assessment of flood defences (Leidraad Toetsen op Veiligheid) Law on Flood Defence: –Safety level prescribed for each of the 53 “flood defence rings” (1/ /10.000) –Water boards are responsible and have to report in a 5 year cycle whether safety is according to the legally prescribed safety level –For each section of defence, Department of Public Works (‘Rijkswaterstaat’) provides hydraulic conditions with required probability of exceedance –‘Rijkswaterstaat’ provides guidelines to determine if the safety level is sufficient (‘safe’ or ‘unsafe’)  LTV Present assignment: update, incorporation of new knowledge, finish end 2002

May 2002 LTV: Method For each failure mechanism, LTV contains a set of rules in the form of a flow chart that can be used to assess whether safety is sufficient. For each failure mechanism and each section of flood defence, the flow chart assessment is ‘safe’ or ‘unsafe’. The worst scoring mechanism determines the final score of each section (‘safe’ or ‘unsafe’) The worst scoring section determines the final score of each flood defence ring (‘safe’ or ‘unsafe’)

May 2002 LTV: Scope Each type of flood defence is treated separately: The three principal types are dikes, dunes, structures For each type each relevant failure mechanism is treated separately: e.g. overtopping, geotechnical stability, piping, dune erosion, reliability of closure operations, etc. Basic principle: determine ‘safe’ or ‘not safe’ as efficiently as possible  flow charts with different assessment levels: –simple: easy methods, little data, but often insufficient for determination of a final score (‘uncertain’)  next level –detailed: equivalent to design methods, more data required, in most cases sufficient for a final score (‘safe’ or ‘unsafe’), in rare cases still ‘uncertain’  next level –advanced: specialised methods, advanced data collection, expert judgement

May 2002 LTV: Piping for dikes as an example (1): Simple calculation methods such as Bligh (2): A check if the methods that were used for the design are compatible with current design manuals and if all relevant parameters are equal or more favourable to the ones used in design (3): Calculation using the design methods from the current design manuals, guidelines for data collection (4): Examples: unsteady, 3D or probabilistic calculations, including expert judgement (5): Result ‘safe’ can only be given if the failure mechanism has not occurred within the section

May 2002 Main improvements from the update Clearer and more consistent flow charts and accompanying text Incorporation of new Knowledge, based on recent advances in design and management methods Incorporation of improvements due to feedback from use of existing document Increased scope for conclusive assessments made at simple or detailed stages

May 2002 VNK Project: Framework VNK: The Safety against flooding in the Netherlands quantified (Veiligheid van Nederland in Kaart) Philosophies in flood defence management: –Present: Deterministic Section Method: Each section of flood defence ring must be sufficiently strong to withstand hydraulic conditions with the legally prescribed frequency  Safety assessments, LTV –Near Future: Probabilistic Ring Method: Probability of inundation of flood defence ring must be less than a whole range of legally prescribed safety conditions  VNK Project –Possible future: Ring Risk Method: Optimisation of safety levels on the basis of the expected damage level after inundation

May 2002 VNK Project: Current status Co-operation between Rijkswaterstaat, water boards, large technological institutes’ and consultants Development of calculation methods and tools Developments of methods and guidelines for data collection, especially for (old) structures Analysis of first sets of flood defence rings (pilot studies underway) Next couple of years: –calculation of safety level for all 53 rings –based on safety levels: prioritising of improvement works –possible development towards inundation risk-based methods