Stability and Failure Mechanisms of Dams A dam safety research project Kjetil Arne Vaskinn.

Slides:



Advertisements
Similar presentations
Magnesium Diboride Program Hyper Tech Research Inc. Mike Tomsic Magnesium Diboride Workshop April 2003 Research Partners: Ohio State University-LASM National.
Advertisements

Slide 1 MAX, where do you go? Karl-Heinz Posch ECOMM 2007 Lund, 11 May.
Barrier Warrants. Potential Hazards –Bridge Abutments/Piers/Approach Railing –Large Drainage Structures –Non-Breakaway Sign and Luminaire Supports –Embankments.
1 1  1 =.
CLIFFS launch meeting 26 October 2005, Holywell Park, Loughborough University BIOLOGICAL AND ENGINEERING IMPACTS OF CLIMATE CHANGE ON SLOPES (BIONICS)
1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions.
Recovery Boiler Modeling
Wallingford - May 2002 Flood propagation - UCL experiments 1 Flood propagation Dam-break flow experiments in idealised representation of complex topography.
D:\data\PowerPoint\Maravic\NCP-EURATOM Meeting - CCAB ppt Slide 1 National Contact Points for EURATOM- Information Exchange Meeting October 16,
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Mo-i-Rana - September 2002 Dam-break floods and sediment movement 1 IMPACT - WP4 Dam-break induced floods and sediment movement.
May 2002 LTV & VNK Managing the Safety of Flood Defences in the Netherlands Fola Ogunyoye Presented on Friday 17th May 2002 at the IMPACT Project Workshop,
Assessing Uncertainty when Predicting Extreme Flood Processes.
IMPACT 6-7th November 20033rd IMPACT Project Workshop Louvain-la-Neuve 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation.
Mo-i-Rana - September 2002 Dam-break floods and sediment movement 1 IMPACT - WP4 Dam-break induced floods and sediment movement IMPACT - WP4 Dam-break.
IMPACT Project Breach Modeling Tests. Dam Failures Increasing (?) Worldwide.
Louvain-la-Neuve - Nov 2003 Dam-break floods and sediment movement 1 IMPACT - WP4 Dam-break induced floods and sediment movement IMPACT - WP4 Dam-break.
IMPACT ~ Breach Physical Modelling Review of Modelling Work Undertaken So Far...
Number bonds to 10,
Beat the Computer Drill Divide 10s Becky Afghani, LBUSD Math Curriculum Office, 2004 Vertical Format.
Funding Project Management Coordination Structural Approaches – Dikes, Reservoirs and Dams IMPROVEMENT OF THE GENERAL RESISTANCE OF DIKES AGAINST EROSION.
ADVANTAGES Water savings Crop response Labour savings Fertilizer savings Less weed growth Drip Irrigation System Layout & Design.
The Asphalt Core Embankment Dam A Very Competitive Alternative
Course : S0705 – Soil Mechanic
Impacts of Seismic Stress on Pore Water Pressure in Clayey Soil By: Qazi Umar Farooq Lecturer Civil Engineering Dept Univ of Engg & Tech Taxila.
Earth and Rockfill Dams
Sharif University of Technology Civil Engineering Department Tehran-Iran Dam Safety An Approach to Prevent Dam Incidents.
PHYSICAL MODELING OF BREACH FORMATION Large scale field tests Kjetil Arne Vaskinn, Sweco Gröner Norway.
Risk Management and Dam Safety. Reclamation Played a Pivotal Role in Developing Major River Basins in the Western United States.
Workshop September 2004 Sandilands, United Kingdom COMRISK Subproject 8 “Risk Assessment Lincolnshire, Pilot Studies” (SP8)
Sediment Movement after Dam Removal
Dry Stacking of Cycloned Tailings
WINDAM Technology Workshop Sept 1-3, 2009 WINDAMb-e (Windows Dam Analysis Modules)
Climate & Transportation R&D program conducted by the Norwegian Public Roads Administration , cca 2,5 mill € Update design, construction, operation.
“Research in dam breaching" Sílvia Amaral PhD Student (1 st year) December, 14 th 2009.
March, Review of Existing Chutes Inconclusive Some in good shape after experiencing large events.
Toronto, May 6-8, 2008Flood Defence1 Risk assessment in trans-boundary cooperation between the Netherlands and Germany Jan Stijnen.
SPN7 Numerical investigations on the influence of hydraulic boundary conditions on the efficiency of sewer flushing Dr.-Ing. Joerg Schaffner
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
Your logo کاربرد ژئوگرید در افزایش پایداری موج شکنها
1 09/2002 ISO 9001 certified JOANNEUM RESEARCH Applied Geophysics Institute of Applied Geophysics – new Dam Project 2nd IMPACT Project Workshop Mo-i-Rana,
BREACH FORMATION A Review of State-of-the-Art Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 16/17 May 2002.
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
Formulation of a New Breach Model for Embankments IMPACT Project Workshop, Wallingford 2002 Breach Formation Theme.
Large Scale Embankment Failure
DAM BREAK RISK IN COLOMBIA A Geospatial Assessment of Population Vulnerability from Flood Inundation Eugene Derner, GEOG 594a Spring 2014.
Determination of initial conditions for dam erosion due to overtopping and possible integration into a probabilistic design concept Dr.-Ing. K. Broich.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Systematic Review: Interpreting Results and Identifying Gaps October 17, 2012.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
IMPACT 5 November 20044th IMPACT Workshop - Zaragoza1 Investigation of extreme flood Processes and uncertainty UniBwM Breach Modelling Dr.-Ing. Karl Broich.
COMRISK Workshop Norden 12./13. May 2004 Failure probability of the Ribe sea defence Andreas Kortenhaus Leichtweiß-Institut for Hydraulics (LWI) Dept.
IMPACT 4 November 20044th IMPACT Workshop - Zaragoza1 Investigation of extreme flood Processes and uncertainty Model uncertainty How uncertain are your.
International Levee Handbook Overview of the handbook Chapter 8 Physical processes and tools for levee assessment and design.
Soil Mechanics Topic – Triaxial shear test(CD, CU, UU tests)
Dipen Bista ADVANCED SOLUTIONS FOR ASSESSMENT OF EXISITING CONCRETE DAMS.
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
Rural e-Science what we may need to survive ourselves! Jeong-Jae Lee & Byong-Lyol Lee Seoul Nat’l Univ. / NCAM.
FE: Geotechnical Engineering
Applications to Rural e-Science
Kick-off Conference “Risk Management for
Norwegian practice - new research
Bituminous-faced Rockfill Dam Seismic Performance Prediction of stress-strain behaviour and potential damages Proposal for the 15th International Benchmark.
IMPACT ~ Breach Formation (WP2)
2nd IMPACT Workshop Mo i Rana, Norway 12/13th Septemper 2002
IMPACT BREACH FORMATION (Location).
Earth and Rock fill Dams
Numerical Analysis of slopes
Stability analysis of embankment dams
Civil Engineering Dept.
Presentation transcript:

Stability and Failure Mechanisms of Dams A dam safety research project Kjetil Arne Vaskinn

During the latest year there have been a strong focus on dam safety. This has been reflected by: several reassessments of dam safety new dam safety regulations introduction of risk analysis dam-break flood routing etc. Background Reassessment: Uncertainty and discussion about the dam regarding the demand of: Stability Slide or erosion during large throughflow Drainage capacity The cost of rehabilitation is several millions of NOK at each dam Simulation of flood propagation resulting from dam-break Breach development: Size of the breach as a function of time Teton

Increase the knowledge about: Safety of the downstream shell in Norwegian dams during large throughflow. Breach formation in embankment and concrete dams. The results shall be user-friendly, so that it can easily be used in the damowners safety work: Design tool Design criteria Simplified point of view Results are hoped to become a base for new “accept criteria". Aim of the project

Subproject no. 1: Shear strength and permability of rock-fillings Find shear strength and stability of different embankment material Find correct material parameters Find realistic analyse methods Project manager: Kaare Høeg, NGI Literature study Discussions with international experts Summarize experiences from dams Evaluation of earlier tests and calculations Field tests

Subproject no. 2: Stability and failure mechanisms of dams Develop tools/routines for evaluating the stability based on tests and international experiences from similar topics. Project manager: Einar Ødemark, Statkraft Grøner AS Piping Damtoe Support fillingWater tight core Filter Overtopping Subproject status: Field tests, carried out/new are planned Laboratory tests, carried out/new are planned Data reports, nearly finished Analysis, ongoing Parameters that are studied: Particle size Grading of the material Downstream slope Tailwater level Scale effects

Subproject no. 3: Breach formation in embankments Study the failure mechanisms of rockfill dams using tests and data from earlier failures. Develop methods for breach analysis. Design and layers of the dam should be included. Project manager: Einar Ødemark, Statkraft Grøner AS Subproject status: Literature study Field tests Field- and laboratory tests from subproject no. 2 and IMPACT

Subproject no. 4: Breach formation in concrete dams Study the failure mechanisms of different kind of concrete dams using Finite Element Method. Project manager: Per Magnus Johansen, Norconsult Subproject status: Initial phase Literature study planned and started?

Laboratory model – 0.6 m high dam 1:31:1.5 1:1 Water-level measurement 1: meter Q ut Q inn 0.5 m 1.2 m

Laboratory model - scale 1:10 Downstream slope: 1:1.5 Tailwater level: Low Uniformly graded material d 10 = 5 mmd 50 = 11 mm Smallest particle size tested in this flume Downstream slope: 1:1.5 Tailwater level: Low Uniformly graded material d 10 = 78 mmd 50 = 100 mm Largest particle size tested in this flume

s Filter :3 Q max = 600 l/s meter 4.00 Q ut Water-level measurement 1: Laboratory model – 1.2 m high dam

Test-flume scale 1:5 Downstream slope: 1:1.5 Tailwater level: Low Uniformly graded material d 10 = 66 mmd 50 = 88 mm

Project scheme, 2002 Finalise data reports from the tests in 2001 Analysis based on tests and literature Field tests Laboratory tests Literature studies Workshop