Water Supply and Sanitation in Uzbekistan Ayse Kudat The World Bank 1998.

Slides:



Advertisements
Similar presentations
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Advertisements

1
& dding ubtracting ractions.
Chapter 3 Demand and Behavior in Markets. Copyright © 2001 Addison Wesley LongmanSlide 3- 2 Figure 3.1 Optimal Consumption Bundle.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
UNITED NATIONS Shipment Details Report – January 2006.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 Screening & Eligibility Jeopardy Title V/PHC.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
1 1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Wants.
1 Copyright Copyright 2012.
Applicable for Persons Registered under Article 10
Richmond House, Liverpool (1) 26 th January 2004.
Order of Operations Lesson
Break Time Remaining 10:00.
The basics for simulations
Water Distribution Systems – Part 1
Analyzing Transactions
1 Roadmap for Investing Wisely for a Lifetime Leslie Lum Bellevue Community College.
1 Chapter 4 Markets in Action Key Concepts Key Concepts Summary Practice Quiz Internet Exercises Internet Exercises ©2002 South-Western College Publishing.
PP Test Review Sections 6-1 to 6-6
CENSUS DATA 1.POPULATION Total population5.437 million9.856 million Female percentage Intercensal growth percentage Growth.
Look at This PowerPoint for help on you times tables
MCQ Chapter 07.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
VOORBLAD.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Cake or Crumbs Frank Harding Pensions Officer Warwickshire County Council 28 November 2013 Warwickshire County Council Warwickshire County Council Pension.
Measuring Business Profit: The Adjusting Process Chapter 3 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Chapter 5 Test Review Sections 5-1 through 5-4.
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
DURHAM DAY-TRIP REPORT Prepared For: Durham Convention & Visitor’s Bureau Prepared By: D.K. Shifflet & Associates Ltd. April 2003.
Before Between After.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Januar MDMDFSSMDMDFSSS
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 10 A Monetary Intertemporal Model: Money, Prices, and Monetary Policy.
Static Equilibrium; Elasticity and Fracture
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
PSSA Preparation.
& dding ubtracting ractions.
Product Costing in Service and Manufacturing Entities
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Slide 1 Expectations of DNOs & Willingness to Pay for Improvements in Service May 2008.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Potable Water and Sanitation Issues in the Aral Sea Ayse Kudat The World Bank 1998.
Water Utility Performance
Presentation transcript:

Water Supply and Sanitation in Uzbekistan Ayse Kudat The World Bank 1998

Low tariffs, costs not recovered With low tariffs, consumers use water inefficiently High water usage drives up costs and investment needs Utility lacks resources, postpones investment and maintenance Assets and service quality deteriorate With the poor service, customers are less willing to pay The utility depends increasingly on state subsidies Managers lose their autonomy and incentives to perform (soft budget) Efficiency drops Subsidies often fail to materialize Utility lacks resources, even to pay wages or recurrent costs System assets go down the drain CRISIS, HUGE RECONSTRUCTION COSTS Motivation and service deteriorate further What low tariffs do to utilities... Figure 1 Source: Presentation Water and Wastewater Utilities: covering costs, financing investments, Vincent Gouarne, Improving Water and Wastewater Services Seminar, Golitsyno, April 1997

Education Levels in Gagarin and Oriol Figure 2 Source: Household Survey in Gagarin and Oriol, March and July 1997

Employment Status of Oriol and Gagarin Residents Figure 3 Source: Household Survey in Gagarin and Oriol, March and July 1997 GagarinOriol

Average Monthly Household Income in Gagarin Average = 881,196 rubles/month Figure 4A Source: Household Survey in Gagarin, March 1997

Average Monthly Household Income in Gagarin Households Which Have Central Pipeline Connections Average = 931,988 rubles/month Figure 4B Source: Household Survey in Gagarin, March 1997

Average Monthly Household Income in Gagarin Households Which do not have Central Pipeline Connections Average = 658,982 rubles/month Figure 4C Source: Household Survey in Gagarin, March 1997

Delays in Wage and Pension Payments in Gagarin Wage Payments Average delay: 3.09 months Pension Payments Average delay: 1.99 months Figure 5 Source: Household Survey in Gagarin, March 1997

Average Monthly Household Income in Oriol Average = 977,402 rubles/month Source: Household Survey in Oriol, July 1997 Figure 6A

Average Monthly Household Income in Oriol Households Which Have Central Pipeline Connections Source: Household Survey in Oriol, July 1997 Average = 1,002,945 rubles/month Figure 6B

Average Monthly Household Income in Gagarin Households Which do not have Central Pipeline Connections Average = 838,377 rubles/month Source: Household Survey in Oriol, July 1997 Figure 6C

Problems with the Water Supply for Connected Households in Gagarin Figure 7A Source: Household Survey in Gagarin, March 1997

Problems with the Water Supply for Connected Households in Oriol Source: Household Survey in Oriol, July 1997 Figure 7B

Complaints About Water and Evaluation of Its Quality for Connected Households in Gagarin Have complaints (88.2%) Unsure (2.2%) No complaints (9.6%) Figure 8A Source: Household Survey in Gagarin, March 1997

Source: Household Survey in Oriol, July 1997 Complaints About Water and Evaluation of Its Quality for Connected Households in Oriol Have complaints (93.6%) No complaints (6.4%) Figure 8B

Connected Households in Gagarin Willingness to Make Monthly Payments as Function of Income Willingness to pay Current payments Figure 9A Source: Household Survey in Gagarin, March 1997

Connected Households in Gagarin Willingness to Make Monthly Payments for Improved Water Quality 81.4% are willing to pay for improvements Average = 3.6% of monthly household income Current average payments = 2.0% of monthly household income Caution: 18.6% are not willing to pay anything Source: Household Survey in Gagarin, March 1997 Figure 9B

Unconnected Households in Gagarin Willingness to Make Monthly Payments for Improvements in Water Supply 56.6% are willing to pay for improvements Average = 3.85% of monthly household income Current payments = 0.25% of monthly household income Caution: 43.4% are not willing to pay anything Source: Household Survey in Gagarin, March 1997 Figure 9C

Connected Households in Oriol Willingness to Make Monthly Payments as Function of Income Source: Household Survey in Oriol, July 1997 Current payments Willingness to pay Figure 10A

Connected Households in Oriol Willingness to Make Monthly Payments for Improved Water Quality Source: Household Survey in Oriol, July 1997 Caution: 20.3% are not willing to pay anything Current average water payments = 1.1% of monthly household income 79.7% are willing to pay for improvements Average = 2.3% of monthly household income Figure 10B

Source: Household Survey in Oriol, July 1997 Unconnected Households in Oriol Willingness to Make Monthly Payments for Improvements in Water Supply 63% are willing to pay for improvements Average = 3.3% of monthly household income Current average payments = 0.63% of monthly household income Caution: 37% are not willing to pay for improvements Figure 10C

Improvements in utensils in the house 28.9%; 24,000 rubles Improvements in Outside Pipes 28.2%; 25,600 rubles Improvements in Outside Sewerage Pipes 22.6%; 24,800 rubles Inside Connections 10.9%; 22,600 rubles Inside sewerage system connection 10.5%; 24,200 rubles Other Improvements 5.6%; 33,000 rubles Water System Improvements Demanded in Gagarin and Willingness to Pay Other category includes cleaner water, increase in pressure, improvements in hot water and connections to outside the house Figure 11A Source: Household Survey in Gagarin, March 1997 Improvements in Inside Pipes 28.9%; 28,000 rubles

Improvements in utensils in the house 52.1%; 21,150 rubles Improvements in Outside Pipes 20.4%; 20,500 rubles Improvements in Outside Sewerage Pipes 9.2%; 18,000 rubles Inside Connections 10.2%; 18,100 rubles Inside sewerage system connection 13.4%; 19,700 rubles Other Improvements 4.2%; 27,000 rubles Water System Improvements Demanded in Oriol and Willingness to Pay Other category includes cleaner water, increase in pressure, improvements in hot water and connections to outside the house Source: Household Survey in Oriol, July 1997 Improvements in Inside Pipes 44.7%; 21,700 rubles Figure 11B