System’s generalities and structure of the final report Cesidio Bianchi. INGV.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 7 System Design Techniques.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 Multi-Channel Wireless Networks: Capacity and Protocols Nitin H. Vaidya University of Illinois at Urbana-Champaign Joint work with Pradeep Kyasanur Chandrakanth.
Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
SOA for EGovernment 1 Emergency Services Enterprise Framework: A Service-Oriented Approach Sukumar Dwarkanath COMCARE Michael Daconta Oberon Associates.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Satoshi NARIKAWA NTT (G.8032 Acting Co-editor)
Quito, Ecuador, 14 August 2013 Assessing EMF Levels Guidance and Recommendations Mike Wood EME Management Education & Compliance Telstra ITU Workshop on.
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
EA Demonstration Study : Dissemination Forum – 8 June EA Views and Sub-views Patrick Bardet EA Unit.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
Making the System Operational
ZMQS ZMQS
X-Win and Geant2 - the next generation of research networks in Germany and Europe Workshop FZK, 2 December 2004 K. Ullmann, DFN Berlin.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
EMS Checklist (ISO model)
Effectively applying ISO9001:2000 clauses 6 and 7.
Networks: Introduction 1 CS4514 Computer Networks Term B06 Professor Bob Kinicki.
KONNEX Scientific Conference, 5th October 2004 KONNEX Configuration modes 1 KONNEX Configuration modes in the frame of a modular communication stack Petar.
Service Level Agreement
ABC Technology Project
Countering DoS Attacks with Stateless Multipath Overlays Presented by Yan Zhang.
CP Chapter 4 Schedule Planning.
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
1 Dissemination to Policy and Decision Makers and a Wider Audience Peter J. Bates pjb Associates
Checking & Corrective Action
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
The SWING Project: status and closure of the project Bruno Zolesi. Istituto Nazionale di Geofisica e Vulcanologia.
Energy & Green Urbanism Markku Lappalainen Aalto University.
Online Rubric Assessment Tool for Marine Engineering Course
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
METHODOLOGICAL BASES OF NATURE PROTECTION GEOINFORMATION SYSTEM CREATION Kyiv Mohyla Academy National Agricultural University V. Lavryk V. Bogolyubov
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2001 Chapter 16 Integrated Services Digital Network (ISDN)
INGV-CNIT-NOA-EO Project presented in the ambit of CIPS program SWING Short Wave critical Infrastructure Network based on new Generation of.
INGV-CNIT-NOA-EO Plenary meeting – First year activities Short Wave critical Infrastructure Network based on new Generation of high survival.
Rome, February 14, 2013 Status of the Project Report on the first year activities With the support of the Prevention, Preparedness and Consequence.
Identification of Critical Infrastructures in the Mediterranean Sea context and communications’ criticalities Irene Fiorucci Cesidio Bianchi Istituto Nazionale.
Bruno Zolesi Istituto Nazionale di Geofisica e Vulcanologia The SWING Project: Headlines and Aims With the support of the Prevention,
INTERNET CRITICALITIES Activation and deactivation of the emergency back-up network Fabrizio Cuccoli, Francesco Sermi RaSS CNIT UO Firenze.
DETERMINATION OF THE TOPOLOGY OF HIGH SURVIVAL HF RADIO COMMUNICATION NETWORK Andrea Abrardo.
Rome, February 14, 2013 Status of the Project Report on the first year activities With the support of the Prevention, Preparedness and Consequence.
Presentation transcript:

System’s generalities and structure of the final report Cesidio Bianchi. INGV

Index Introduction 1.Identification of Critical Infrastructures in the Mediterranean Sea context and communications’ criticalities. 2. Determination of the topology of high survival HF radio communication network. 3.Internet criticalities and activation/deactivation of HF network. 4.High survival HF radio network. 5.HF management communication system and link optimization. 6.Design and realization of HF station prototype. 7.SWING system’s generalities. 8.Conclusions. References 2SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

SVP Supervision Program (SVP) is a general procedure for management and control as well as a methodology valid and applicable in every point (or node) of the HF network. This program contains the common concepts adopted for the protection of maritime CI in the context of the Mediterranean Sea. It also deals with the common technical requirements for the data/voice communication (radio electric parameters, network and data protocol, etc.) 3SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

SVP Supervision Program 4SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

DSVF Distributed Supervision Functions (DSVFs) follows the general procedure established by SVP. It is a program that runs in every HF network point (or critical infrastructure). It resides in the workstation (PC) to manages the fully reconfigurable hardware that constitute the transmitting/receiving stations. The system is based on the Software Defined Radio technology. Among the various techniques the USRP or Universal Software Radio Peripheralof Ettus has been employed. DSVP contains routine for internet check, activation/deactivation of the network and frequency management. 5SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

USRP 6SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Internet control 7SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Frequency selection 8SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

DSVP 9SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

DSVF Distributed Supervision Function 10SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

DSVP flow chart 11SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

DSVP flow chart-2 12SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

SWING HF network point 13SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

FINAL REPORT 14SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Introduction 1.Identification of Critical Infrastructures in the Mediterranean Sea context and communications’ criticalities. 2. Determination of the topology of high survival HF radio communication network. 3.Internet criticalities and activation/deactivation of HF network. 4.High survival HF radio network. 5.HF management communication system and link optimization. 6.Design and realization of HF station prototype. 7.SWING system’s generalities. 8.Conclusions. References

Critical Infrastructures 15SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

NETWORK TOPOLOGY 16SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 ECI CGA Link Contention based scenario (DCHF). ECI CGA Link ECI-CGA Token logical ring Local HFTP Each node that needs to transmit waits for token reception. Upon receiving the token, it is allowed to try to transmit its packet for a limited time interval before releasing the token. Every transmitting node senses the channel and then establishes a connection with the receiver

Activation/deactivation of Net 17SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

High survival HF network 18SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Example of implementation: Block diagram of an OFDM transceiver

Frequency management 19SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Spectrum analysis directly implemented in USRP

Demonstrator 20SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

SVP-DSVP 21SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

SWING deliverables 22SWING Final Meeting | CNIT - Pisa, Italy13/12/ Interface with EU authorities and coordination. 2-Technical analysis of the communication problems related to the identification and designation of CIs in the interested area. 3-Determination of the topology of high survival radio communication network. 4-Characterization of the minimal amount of information necessary for the survival of the CIs communication. 5-Operative supervision of the network architecture. 6-Analysis of the existing architecture of HF communication based on Internet protocol access with reference to the above considered infrastructures. 7-Analysis of existing HF connection system in terms of software and hardware for Internet connection. 8-Definition of the high survival HF radio network technical requirements. 9-Radio network system design. 10-Criteria of early warning alert and procedures to activate the back-up network. 11-Monthly prediction of the hourly HF set of frequencies over the N radio links given by the network, based on the available ionospheric model and methods. 12-Daily forecasting of the hourly HF set of frequencies based on the Mediterranean ionospheric measurements. 13-Ground wave propagation analysis when required. 14-Frequency management system for HF communication link optimization. 15-Identification of the professional profile able to maintain and operate network. 16-Dissemination of deliverables within communities informing about initiatives organised in the context of the project. 17-Professional training activities through courses, workshops and conferences. 18-Assessment of the potential impact and feasibility of the project for ECIs and CGAs and final recommendations for the EC. 19-Realization of a demonstrator constituted by 4-terminals HF network. 18 TR Thanks