Application of User Pays Principles to Existing Service Lines 22nd November 2006.

Slides:



Advertisements
Similar presentations
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
Advertisements

RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
1 Project Nexus Modelling costs and benefits Andrew Wallace, Cesar Coelho Ofgem Project Nexus IA Subgroup 25 July 2012.
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
User Admission Steps Legal Opinion Obtain copy of Uniform Network Code
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
Xoserve Services Workgroup. xoserve Funding Arrangements - Model Comparison ModelKey Benefits User Pays Model AUser Pays Model B Baseline Services (Core)
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
IGT Single Service Provision Requirements Update – 27 th March 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
PN UNC Workgroup iGT Services 7 th February 2012.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Références, date, lieu Xoserve Service Model – Shipper’s View Total Gas and Power Ltd Gaz de France ESS.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Agency Charging Statement Overview of Consultation 11 th February 2008.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
SoS Report PAC – 13th December 2016.
User Pays User Committee 12th November 2013
FGO: ASA Service Line Review
PN UNC Workgroup Invoicing 4th October 2011.
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Cost Allocation review – CoMC update July 18
Must Read Process Guide For Shippers
Chris Warner Network Code Manager
Incentives 26 September 2018.
Connected System Exit Points Administration Options
CSEPs Reconciliation Proposals
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
UNC Modification Proposal 0362
PN UNC Workgroup iGT Services
Connected System Exit Points - Update
Project Nexus Workgroup
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
User Pays Principles and Governance
Gemini Code Contingency Review
xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper
Modification 440 Project Nexus iGT Single Service Provision
PN UNC Workgroup (AQ topic)
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

Application of User Pays Principles to Existing Service Lines 22nd November 2006

User Pays Criteria for Existing Services  The key stakeholder of a service line is the party who has the most interest in the way the service operates.  The key stakeholder is not necessarily  The recipient of the output from the service line or  The owner of the obligation.  Criteria for applying user pays arrangements to an existing service:  The key stakeholders are Users and  Users have discretion on whether to use the service and  [Users have discretion on how to use the service and]  The cost of the service line is usage dependent.

User Portfolio Report  User portfolio report (Part 3 – 35).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -  The cost of the service line is usage dependent - ?  Issues  Not sending a report may be more expensive than sending to all.

Supply Point Information Services  Provision of relevant data to gas shippers or their agents or non-domestic customers of a gas supplier or persons acting on their behalf (Part 2 – 8).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -  The cost of the service line is usage dependent -  Issues  Internet Access to Data is largely fixed cost.  Different approach for different aspects of a single service line.

Record Meter Reference Number  Record the number for a New Supply Meter Point on the Supply Point Register. (Part 1E - 18).  Criteria  The key stakeholders are Users -   Users have discretion on whether to use the service -   The cost of the service line is usage dependent - ?  Issues

Must Reads  Notify user and obtain meter read following failure by user to provide valid meter read for a monthly read meter. (Part 1E – 16).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -  The cost of the service line is usage dependent -  Issues  A charge is already made.

SPA Data From iGTs  Validation of relevant supply point administration data submitted to a network operator by a connected system operator or independent gas transporter in relation to an NDM CSEP. (Part 1E - 12).  Criteria  The key stakeholders are Users -   Users have discretion on whether to use the service -   The cost of the service line is usage dependent -  Issues

User Admission  Coordinate admission requirements for an applicant user. (Part 1E – 1).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -  The cost of the service line is usage dependent -  Issues  Could include provision of IX equipment (Part 3 – 8)

Energy Balancing  Credit Risk Management and Cash Collection. (Part 1D).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -   Users have discretion on how to use the service - ?  The cost of the service line is usage dependent -  Issues  Transporters have a strong interest in the financial incentives to balance the system.  Unlikely to provide incentive to manage costs imposed on xoserve.

Invoicing  Submission of supporting data for Invoice Documents. (Part 1C - 4).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -   The cost of the service line is usage dependent - ?  Issues  Not sending supporting information may be more expensive than sending to all.

User Provisional Annual Quantity  Respond to notification of User Provisional Annual Quantity. (Part 1B - 17).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -  Users have discretion on how to use the service -  The cost of the service line is usage dependent -  Issues

Retention of Meter Reads  In relation to NDM Supply Meters maintain a record of valid Meter Readings for no longer than 5 years. (Part 1B - 5).  Criteria  The key stakeholders are Users -   Users have discretion on whether to use the service -   The cost of the service line is usage dependent -   Issues

Query Management  Standards of service query management. (Part 1A - 25).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -  Users have discretion on how to use the service -  The cost of the service line is usage dependent -  Issues

Supply Point Nomination  Respond to Supply Point Nomination. (Part 1A - 3).  Criteria  The key stakeholders are Users -  Users have discretion on whether to use the service -   Users have discretion on how to use the service -  The cost of the service line is usage dependent - ?  Issues

Summary of User Pays Analysis (1) User is StakeholderGT is Stakeholder User Pays Applicable Transportation Charge 1A – Provide and Maintain a Supply Point Register Manage Supply Point Register Provide Query Management Record, submit data in compliance with UNC 1B – Recording & Calculating Transportation Volumes Metered Volume & Quantity Annual quantity, DM supply point capacity and offtake reviews. 1C – Provision of Transportation and balancing invoices.

Summary of User Pays Analysis (2) User is StakeholderGT is Stakeholder User Pays Applicable Transportation Charge 1D – Energy Balancing 1E – Other SPA Services User admission & termination Connected System Exit Points NExA Supply Meter Points Must Reads Generation of a supply meter point reference number. 1F – Demand Estimation Services.

Summary of User Pays Analysis (3) User is StakeholderGT is Stakeholder User Pays Applicable Transportation Charge 2 – Provision of services in relation to obligations under GT licence. 3 – Other ServicesUK Link services Provision of User Reports and Information. Network Operator and User relationship management. Data flows to Network Operators. 4 – AT Link & RGTA systems services (Gemini).

User Pays Analysis Caveats  Not all individual service lines are appropriate for user pays, even within a user pays category.  Service lines identified as user pays candidates can have a significant fixed cost element.  It’s likely that if a materiality criteria were to be applied, the number of user pays service lines would reduce.