The Winslow Geo Anchor in Pool Foundations Delivering Superior Performance for Lower Cost when Compared to Drilled Concrete Piers 2013 - 2014.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Fundamentals of Engineering
Chapter 12 Keynesian Business Cycle Theory: Sticky Wages and Prices.
Advanced Piloting Cruise Plot.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Previous Conclusions Concrete will continue to be a dominant construction material Reinforced concrete must crack in order for reinforcing to work lower.
Whiteboardmaths.com © 2004 All rights reserved
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
You will need some paper!
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Module Floor Systems.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Classification of Building Construction Types
TRONCO BUILDING SUPERSTRUCTURES IN HAITI
for Storm Survival, Long Term Reliability and Safety
Helical Piles Defined Presentation by: Howard A. Perko, Ph.D., P.E. Magnum Geo-Solutions, LLC Copyright 2011 – Magnum Piering, Inc., All Rights reserved.
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Success with ModelSmart3D
© © QA Software Pty Ltd All rights reserved 1 Project Information Management Tools Inspection and Defects Management System for Projects By QA Software.
Copyright © 2009 EMC Corporation. Do not Copy - All Rights Reserved.
The IP Revolution. Page 2 The IP Revolution IP Revolution Why now? The 3 Pillars of the IP Revolution How IP changes everything.
Career in Civil Engineering… Maharashtra Engineering Service Exam
Case Management Techniques
American Iron and Steel Institute American Iron and Steel Institutes Technical Session Steel Distribution Poles - The Material of the Future - presented.
Steel Construction.
Introduction Future Steel Buildings offer great value due to their truss-free design which ensures 100% usable interior space. They are based on the strongest.
March 21, 2012 An Advanced Manufacturer in Steel California Steel Industries, Inc. Fontana, CA.
IIT Madras, SERC Madras, Anna Univ., INSDAG
Lightweight Forming System and Roofs for Concrete Floors.
TRANSPORTATION OF DANGEROUS GOODS
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
Helical Pile Product Numbering
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Transportation Engineering Name Title Company School, Date, or Other information on where you are making the presentation.
Factors, Prime Numbers & Composite Numbers
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
REVOLUTIONARY BUILDING SYSTEM TM. TIMECOSTENERGY THE PROBLEM A NEED FOR INNOVATION.
Squares and Square Root WALK. Solve each problem REVIEW:
CMPT 275 Software Engineering
© 2012 National Heart Foundation of Australia. Slide 2.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
Functional Areas & Positions
25 seconds left…...
Equal or Not. Equal or Not
We will resume in: 25 Minutes.
Concrete Construction Part 1
VALMONT WIND ENERGY, INC. MODULAR TOWER SYSTEMS. Presentation Overview Bigger Machines Modular Tower Systems (MTS) Transportation Restrictions Flexible.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Copyright 2011 – Magnum Piering, Inc. Helical Pile Selection and Sizing Presentation by: Howard A. Perko, Ph.D., P.E. Director of Engineering, Magnum Geo-Solutions,
1 Fundamentals and Application of Stress Ratio in Concrete Pavement Design Edward H. Guo Consultant April , 2012 FAA Working Group Meeting.
School Bus Drivers In-service School Bus Drivers In-service Develop a Special Needs Emergency Exit Plan.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
The Wafflemat™ Foundation Forming System On-grade Mat Foundation for Expansive, Collapsible and Rocky Soils.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
CONSTRUCTION OF SOIL NAILING WALLS
Concrete Pre Cast Panel By Peter Spence ID:
AN INTRODUCTION TO MICROPILES CIVL 141 Spring 2011.
Cathodic Protection of Tower Anchors
Foundation Engineering CE 483
METAL FOUNDATIONS The strongest, most durable, most reliable and most cost-effective alternative to concrete foundations. You can add personalized information.
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
DIAGRAM Basic Foundation Design Basic Foundation Design Central Pipe Column.
A Better Foundation Alternative DESIGNING METAL FOUNDATIONS Shaner Industries |
AN OVERVIEW OF SHALLOW AND DEEP FOUNDATION SYSTEMS
Ryan Thurston | Duncan McLennan
The Wafflemat® Foundation-Forming System On-grade mat foundation when building on expansive, compressible, rocky, or liquefiable soils.
Presentation transcript:

The Winslow Geo Anchor in Pool Foundations Delivering Superior Performance for Lower Cost when Compared to Drilled Concrete Piers

Best Base Confidential. All Rights Reserved. 2 Upfront The Winslow Geo Anchor: A rotary installed steel anchor, with single or multiple helix flights, providing extremely high compression & tension capacity. Supports heavy loads, eliminates concrete, and reduces soils work. – Why the Winslow Geo Anchor – How it delivers superior performance for less money – Drawings and details of anchors in a pool foundation – Photo Sequence of anchors in a pool foundation – Cost study of anchors vs. drilled concrete piers in a pool project – Corrosion protection

Best Base Confidential. All Rights Reserved. 3 Why the Winslow Geo Anchor Todays engineers and contractors place tremendous value on performance, cost, and environmentally friendly technology, and want to provide each of those elements to their customers. Thousands of Winslow Geo Anchors have been installed in foundations during the past 20 years without one structural failure or callback -- including five major pool projects in the past two years. In addition to an unparalleled record of performance, it often costs % less than drilled concrete piers. And, since steel has a much smaller C02 footprint than concrete, its a far greener solution too. Bottom line: were passionate about delivering this product.

Best Base Confidential. All Rights Reserved. 4 How the Winslow Geo Anchor delivers superior performance for less money and is green Each anchor is custom fabricated to exact project specs by certified welders using a-grade materials at a controlled facility. Installed anchors are tested to ensure load capacity – a check not done with drilled concrete piers. Installs in minutes vs. days, in any weather, and produces no spoils/off- haul. Cost per ft. is often % less than drilled concrete piers. The production, transportation, and installation of steel anchors has a significantly smaller CO2 footprint than drilled concrete piers.

It is

Used on Multi Levels

8 is not... Dual-helix flights on anchor

Setup

11

Slab Pour

Finish Cut to length

Top plate attached

15 Note: Plumbing already up

16 Waffleboxes left out for point loads

Cables in Clips

Strong enough to walk on

orkiHawaii

Best Base Confidential. All Rights Reserved. 20 Cost Comparison (Page I) The following is a summary of costs where 18 Winslow Geo Anchors were used instead of 18 drilled concrete piers in the foundation of a large pool built in the hills of Orinda, California: Winslow Geo AnchorConcrete Drilled Piers Materials: 18 anchors, 15 feet long, installed18 drilled piers, 15 feet, installed 3.5 O/D, 3/8 thick, Schedule 8016 diameter, caissons $53.32 per sf, $799 per anchor$62.40 per sf, $936 per pier Total: $14,382$16,848 Engineering: $4,000 structure $4,000 structure $4,900 geotechnical $3,500 geotechnical Total: $8,900$7,500

Best Base Confidential. All Rights Reserved. 21 Cost Comparison (Page II) Additional Labor: None$2,500 Installation cycletime: 4.5 hoursThree (3) days Other costs: NoneSoil off haul: $800 Grand totals pages I & II $23,282 for Winslow Geo Anchors$27,648 for Drilled Concrete Piers Final cost analysis: Winslow Geo Anchors were $4,366 less (16.8%)

Best Base Confidential. All Rights Reserved. 22 Additional Benefits The Winslow Geo Anchor also provided benefits in: Ease of construction: Anchors were done when installed (avg. eight minutes per), vs. 3 days for piers (drill, 1.5 days, off haul spoils,.5 days, set caissons/pour, 1 day). Logistics: An array of trucks required for drilled piers vs. one tractor for anchors (no mixers or pump trucks – and accompanying neighborhood congestion – required). Safety issues: Amplified with the drilled piers solution (18 holes 16 diameter x 15 deep introduces dangerous environment for humans and/or animals). Documentation: Each anchor installed is observed by a geotechnical engineer to ensure torque and depth requirements – checks not done with drilled piers.

Best Base Confidential. All Rights Reserved. 23 Corrosion Protection Every Winslow Geo Anchor is coated based upon project specific soil conditions (Resistivity, pH, Sulfates, Chlorides), and appropriate corrosion protection applied (epoxy, galvanization, cathodic). Consultation provided by Carrie Howell, recognized leader in corrosion engineering in construction industry. Technical paper: Corrosion of Helical Anchors in Soils (2008, Dr. Tom Bragg, Director, Special Projects, Best Base Foundation Systems. Available at:

Best Base Confidential. All Rights Reserved. 24 Contacts Tom Richards, Sales: Jim Winslow, Implementation: Rich Treanor, Planning/Production: Tom Bragg, Engineering Liaison: John Cook, S.E.: Greg Carr, P.E.: