From the Box to Packing in 30 minutes Pack-in-a-Box components Remove components and assemble bracket as shown Follow the instructions to pack your first.

Slides:



Advertisements
Similar presentations
Spiro Vision 3+ This slide show will advance automatically. To manually advance, click on the screen, or press enter.
Advertisements

How to use the NEC projector Its easy! Really!. How to use the NEC projector IMPORTANT-make sure you have reserved the equipment (projector and/or laptop).
Dimension BST 1200 Rapid Prototype Printer Located in GJ 115 Cost: $25 set-up fees as well as $10/in 3 material To build, contact Russ Porter
Zebra® 105SL™ * Removing and Installing Printhead
Enter the address as shown below in the address bar.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Optical Manufacturing Solutions 1 Probe Assembly.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Tools Material Pre-Assembly Assembly Purpose Test 4/24/2015 JTOT Jet A – Thermal Oxidation Test Training Memphis Refinery Lab Tools Material Pre-Assembly.
Click on this image to open the full PDF document.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Unit Test Calibration Training
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
CHEMISTRY 1105 Determination of Absolute Zero using Vernier Equipment.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions BioRad Set Up 8 groups Grossmont Kit.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Fluke thermometer 54II Press green button to turn the thermometer on or off. If it does not turn on replace batteries.
AccuMax Multi-Point Injection Mechanics
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
With experience you can develop the skills needed to clean and maintain your computer, and diagnose and resolve basic problems that may occur when using.
RIMS II Online Order and Delivery System Tutorial on Downloading and Viewing Multipliers.
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
After Receiving this error code, Follow these steps to correct the problem… Click for next slide.
Automated Tooth Paste Dispenser By: Cameron Bauer.
Introduction to Computers Connie Dalrymple. What is a computer? Sources:
Submitted by Ravi Prakash PGT(Computer Sc.) KV39 GTC Varanasi
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
SPT-Soft Pack Technology. Produce the best HPLC columns !
Setting up the Ricoh C305 Press F5 to start the Presentation
Geo CE-XM ch 4 Edited 10/14/05 1 The XM is the newest of the rovers, and unlike other units, it comes with software installed on the unit as well as using.
InteractiveMedia’s Imagine Software Platform When user clicks on the Imagine desktop icon or installed app. This is the first thing the user will see full.
Ultralyte LRB Speed Gun Pocket Manual
CHM 101/102 Laboratory Manual Gas Laws General Chemistry 101/102 Laboratory Manual University of North Carolina at Wilmington.
AJ5806 PCA INFUSION PUMP Quick Operating Instructions.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
CMPF124:Basics Skills for Knowledge Workers Basic Windows Administration.
Using Stress Analyzer for Tensile Testing © 2012 Project Lead The Way, Inc.Principles Of Engineering.
Adapted from “Cooling Systems” – CTAE Information Technology Essentials PROFITT Curriculum.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
Overview of MSWS Control of 212-LC July 15, 2006.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
JFTOT Analysis 1 Preparation for test: 1. Inspect all O-Rings for degradation/cuts. 2 Assembly of Heater Tube Test Section: 1.Always use new tubes, o-rings,
Important! Be sure to connect the communication cable to your computer before opening the Aqua4Plus Lite software. (Click to continue)
Forging new generations of engineers. USING THE STRESS ANALYSER FOR TENSILE TESTING.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
5/14/2003Sprint TekNet IP Train the Trainer1 Open TekNet Software If working at a client station, enter the IP address of the server and mark page as a.
Shaft Replacement Standard Operating Procedure
PostBase Automatic Feeder Component Removal Service Training
Apparatus Setup Jason Quill Eric Richardson.
3.3 PC ICOM Card Driver Installation
Medela Symphony Breast Pump
Service Procedure For Changing Engine Oil And An Oil Filter
How To Setup HP Printer For USB Connection In Windows?
Connecting hardware and Booting the computer
Gel Electrophoresis Teacher Instructions BioRad Set Up 12 groups
Using Stress Analyzer for Tensile Testing
CHAPTER 45 Engine Lubrication.
Jet A – Thermal Oxidation Test Training Memphis Refinery Lab
Determination of Absolute Zero using Vernier Equipment
Quick Start Guide   Micrometer GM Pro 7.4.
Jet A – Thermal Oxidation Test Training Memphis Refinery Lab
Gas Laws When looking at how gas particles react in different situations, we want to look at four different variables and how they affect each other: Temperature.
Diagnostics Analytical 920 LC Semi-Prep 940 LC
How to Connect a Dell Printer to Your PC. Connecting a Wired Printer on Windows 1. Set your printer near your PC.
Dell Latitude Laptop Student setup.
Conference room user manual
Thank You For Purchasing Coeur Designs 11” Shower Extension
Downloading to the NXT requires the correct hardware setup
Revised 1/08, RJE.
Presentation transcript:

From the Box to Packing in 30 minutes

Pack-in-a-Box components Remove components and assemble bracket as shown Follow the instructions to pack your first column and learn how to use the system

Additional Equipment & Chemicals ¼ wrench 5/8 wrench 7/16 wrench Phillips head screwdriver 30ml beaker Waste container Methanol Chloroform Spatula Balance Computer Ultrasonic bath

Pre assembled for supplied SSI column hardware. Column Packer Assembly

Mounting Packing Stand to Pump Screw stand to side of pump using the two #6 screws provided.

Plumbing the Pump

Priming pumps Use MeOH for this column Open prime purge valve press prime button With prime purge valve open use the supplied syringe to draw solvent through the pump Prime pump When pump is primed close the prime purge valve

Packing Ring Seal Installation Place ring in adapter as shown Make sure ring is flat in bottom of adapter

Packer Mounted to Stand Mount packer to stand and tighten wing nuts No wrenches are required to seal reservoir Hand tighten end nuts

Column Assembly Assemble lower fitting of column and add frit to top end fitting and set aside to put on column after it is packed.

System Assembled Correctly The use of the Quick-Set software is not required but gives the most flexibility and will be used for this example

Installing Quick Set Insert Disk Run the Quick-Set setup.exe program file & follow prompts. Due to the many versions of Windows in use, your PC may have newer files than the ones being loaded. You will be prompted for a course of action, when in doubt,keep your existing files orignore other messages. Connect RS 232 Cable provided to the computer and pump Turn on pump

Click QuickSet Go to Start/Programs Click on Quick-Set The screen below appears with the information on the program

Automatic Set Up Initial screen is for locating the SSI / LA pump If communication does not initialize or if the pump is not on this list: Click on the Poll Com Port For Device button. This will scan 9 possible PC COM ports for the attached device. When the device is found, click on the Continue button.

Getting To CP Screen

Setting Flow and Pressure Set to pressure limited ramp and click send Set upper pressure to 9999 psi; click send Set lower pressure to 0 psi; click send Set ramp speed to 100; click send Set max flow and pressure from table

Adding Steps

Packing program to load PressureFlow RateTime Send to pump

Saving Your Packing Program Click on Save Settings Enter file name Save

Mounting Column Make sure packing ring seal is in adapter Hand tighten column in adapter Place plug in bottom of column Remove plug just prior to starting pump

Tighten Column on Packer Use a ¼ wrench and 5/8 or adjustable wrench to snug column to packer Do not over tighten ¼ turn past snug is fine Fill column with 3 mL MeOH

Setting up Graphing and Data Collection

Saving Packing Data Select Log data Give file a name

Making the Slurry Weigh 3 gm of silica into 30 mL beaker Add 20 ml of 50:50 Chloroform:Methanol (Straight MeOH can be used but is not as efficient) Use a spatula to break up packing Place in ultrasonic bath until uniformly dispersed Pour in packing reservoir as soon as possible and pack column

Adding Slurry Use 20 mL of silica slurry and pour carefully into reservoir Fill reservoir with washings of beaker and close

Is It Closed? Make sure the reservoir is full with slurry Remove silica from threads Hand tighten top nut

Make Sure You Are Ready Is the program loaded? Is the pump primed? Is there a waste collection vessel below the column? Did you tighten the fittings? Is there slurry in the reservoir and is the reservoir closed? Are you set to graph the process and save your data? If so, proceed

Packing The Column To run program, click on Pump; or if program is loaded click on Start

Initial Packing Profile

Running a Column Packing Profile

Removing the Column Stop the pump and let the pressure drop to 0 psi Carefully unscrew the column, and using a flat spatula or razor blade, remove excess silica Remove silica from threads if present Place end fitting and frit on column and seal

Removing Excess Silica Work quickly with a spatula edge or razor blade

Getting Ready to Pack Again Pump remaining silica from precolumn for reuse or disposal Empty reservoir Install next column and repeat steps