EURORAIL Project Organizational model. EURORAIL Project Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration.

Slides:



Advertisements
Similar presentations
GRIDS infrastructures under the 6th FP Contractual and financial modalities Christophe KOWALSKI European Commission, Information.
Advertisements

An accessible and attractive region: to improve internal and external transport links Aleksandrs Antonovs EU Funds Managing Authority in Latvia.
1 China Country Report FINAL INTERNATIONAL WORKSHOP ON RURAL ICT DEVELOPMENT Regulatory Framework.
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Joining Forces Europe's first cross-border Transmission System Operator J.M. Kroon MBA, CEO TenneT Holding Düsseldorf, 10 November 2009.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
InvestInLviv.com: Ryasne Industrial Park. Why Lviv? Study by FDi Intelligence, member of Financial Times: European Cities & Regions of the Future 2010/11.
Part-financed by the European Union (European Regional Development Fund) From expectations to contributions towards Rail Baltica development in Kaunas.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Policy Design and Implement in Developing Countries Le Thu Trang (MET11305)
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU CONCESSIONS IN TURKISH LAW İbrahim BAYLAN Legal Adviser Public.
The Process of Including Pan-European Corridor X (Xa) in the Rail Freight Corridor Network (in Line with Regulation 913/2010/EU)
PROJECTS TO BRING THE BALTIC STATES TOGETHER: RAIL BALTICA AND VIA BALTICA Arijandas Šliupas, Vice-Minister of Transport and Communications Republic of.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Development of North Adriatic ports multimodal connections and their efficient integration into the Core Network Project: NAPA STUDIES Trans-European.
COUNTRY STUDY - POLAND POLISH PROGRAMME OF MOTORWAYS CONSTRUCTIONS - BARRIERS OF IMPLEMENTATION Prof. Jan Burnewicz, dr Monika Bak University Of Gdansk.
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
1 Transport sustainability and green corridors TransBaltic Project 1-2 February 2010, Gdańsk Prepared by: Urszula Kowalczyk, Marcin Burchacz Maritime Institute.
DECREE OF THE PRESIDENT OF UZBEKISTAN «ON ADDITIONAL MEASURES TO STIMULATE ATTRACTING FOREIGN DIRECT INVESTMENTS» ON APRIL 10, 2012 #UP-4434 Ministry for.
State company «Russian highways» General presentation June 2011.
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. CENTRAL EUROPE Annual event – 23./ ,
1 ABSTRACT PRESENTATION OF THE FINANCIAL STRATEGY FOUNDER OF INSFRASTRUCTURE SUSTAINABLE DEVELOPMENT RK B.O.T PROGRAM.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
Project Implementation Plan and Principal Activities
TRACECA PROJECT EVALUATION
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
PPP in Lithuania March, 2011.
RBGC First Transnational Roundtable Vilnius 24th November 2011 « Core Corridors and the « Rail Baltica » James Pond DG MOVE European Commission.
1 Developing and Structuring PPP projects in Lithuania 2006/11/22.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Building of multifunctional geothermal rehabilitation town InterMedicalEcoCity Project goal: «InterMedicalEcoCity» - is an International Medical Rehabilitation.
COOPERATION AND INFORMATION EXCHANGE BETWEEN ROMANIA, CANDIDATES COUNTRIES AND WESTERN BALKANS COUNTRIES.
Rail Investments in the new Member States Overview of the situation and debriefing on UNIFE activities Michael Clausecker UNIFE Director-General Appendix.
1 Program of construction the high speed lines in Poland Warsaw, r.
2 UEFA EURO 2012 in Poland Adriana Bronikowska 27 February 2008, Polish-Italian Business Forum EURO 2012 Opportunities for the construction sector related.
 PPP Department within the Ministry of Economy and Transport  Government Decree in May 2003 to set up an Interdepartmental Committee – Ministry of Economy.
EURO 2012 Football Championship As Business Opportunity Israel Business Conference December 2007 European Bank for Reconstruction and Development Your.
Public transport on Estonia Arne Tilk. Public transport on Estonia 1. Is collective transport (in Estonia) considered as a service of general interest?
Presentation of investment projects of Kherson Sea Port.
ESCWA Expert Group Meeting on transport and trade facilitation in the ESCWA region Beirut 7./ Proposal for a work schedule for ESCWA Work Group.
Администрация свободной экономической зоны «Гродноинвест» Тел Факс The TLC.
Public Private Partnership + EU Funds in Poland general overview and the future outlook.
1 Workshop of the Ministry of Finance of the Czech Republic How to use European funds within a PPP project? Jana Maláčová Ministry for Regional Development/
A European Commission funded Regional Programme since Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
System of Export Support in the Russian Federation.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Development of Riga and Pieriga Mobility Plan and Action Program Māra Tapiņa Director.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
National Planning Department. Mobilizing private investment for low carbon development October 14 th, 2015.
H\projects\controls\ekdilosi\tecnoman\ ppt Prospects of drafting Prospects of drafting Black Sea Ring Highway Black Sea Ring Highway Master Plan.
Public-Private Partnership Development Platform in Ukraine Non-governmental organization “Public-Private Partnership Development Platform” Київ
Sustainable public transport – electric transport development project for the capital.
“South East Europe Alliance for Railway Innovation” (SEESARI)
The National Strategy of Slovak Republic
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
INTERNATIONAL SEMINAR «INTERMODAL TRANSPORT BETWEEN EUROPE AND ASIA: OPPORTUNITIES AND CHALLENGES» SPEECH OF THE DEPUTY MINISTER OF TRANSPORT AND COMMUNICATION.
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
on the Conference of PPP world centers within the frames of the III Astana Economic Forum in July 1, 2010 in Astana by the representatives PPP centers.
Reaching beyond the borders Dins Merirands, Deputy State Secretary Ministry of Transport of the Republic of Latvia Railway PRO Technology & Services Forum,
FEZ GRODNOINVEST ADMINISTRATION
PLANNING OF RAILWAY INFRASTRUCTURE IN THE CZECH REPUBLIC
The current situation of intermodal transport in Serbia
Government of Montenegro Ministry of Transport and Maritime Affairs
A "Jean Monnet" project in terms of Erasmus + programme
Presentation transcript:

EURORAIL Project Organizational model

EURORAIL Project Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration Lviv City Council Cost: 500 mln. EUR Terms: Prerequisites: Discrepancy of Ukrainian and CIS countries railways (1520) with the EU railway standard UIC (1435) Increased demand for fast and qualified communication between Ukraine (CIS) and Europe

EURORAIL Project

Project main statements Project subject: The construction of 84 km long EU standard rail track and all required infrastructure between Lviv and Polish- Ukrainian border (Prezemysl/Mostyska and Krakivets). Goal: to provide high speed railway connection between Lviv and Polish-Ukrainian border within III Euro transport corridor. Mechanism: Concession for construction and further operation of the rail track and its infrastructure. Participants: Cabinet of Ministers of Ukraine, Ministry of transport and communication of Ukraine, Lviv Oblast State Administration, Lviv City Council, private companiesЛьвівська обласна Рада, Львівська міська Рада, приватні компанії. Participation of Ministry of infrastructure of Poland is also needed.

Implementation algorithm 1. JSC Evrokoliya set up by experienced in this field companies. 2. The Cabinet of Ministers of Ukraine is to issue the Resolution regarding Eurorail Project implementation and assign core Ministry (Ministry of transport and communication of Ukraine) to be responsible for its realization. 3. The Concession Agreement is to be signed with the Company- contractor identified through the Tender. 4. The Concession Agreement is to be prepared and signed by Ministry of transport and communication of Ukraine, Lviv Oblast State Administration, Lviv City Council and JSC Evrokoliya and is to contain Project implementation mechanisms. 5. JSC Evrokoliya attracts all required financial funds and contractors for the Project implementation. 6. After the project is implemented it is to be managed and used by Ministry of transport and communication of Ukraine. The last is to make payments for the benefit of JSC Evrokoliya.

Project scheme JSC Eurokoliya Ministry of transport Rail track and infrastructure operation Ownership for the rail track and the part of infrastructure JSCEurokoliya Plots Specifications І Information Ministry of transport Lviv Oblast Administration Investme nts Lviv City Council Founders Construction process Euro rail track usage payments according to the Concession Agreement as the investments return source Ownership for the part of infrastructure

JSC Evrokoliya set up Evrokoliya is to be joint-stock company JSC Evrokoliya founders (companies) are to be able to provide qualified Project implementation. Companys dominant task – is to develop contract and legal platform for its further activity (including possible relations coordination between core Ministers of Ukraine and Poland and between Lviv Oblast Administration and Lviv City Council). JSC Evrokoliya is to hold a research on a Project, provide its feasibility study and approve the Project with all Participants. The last stage – Project Business Plan, investments attraction and Project implementation.

Concession Agreement Main regulations: Project participants collaboration mechanism. Participants obligations (land plots, information, specifications provision for the Project by its Participants). Constructed objects ownership (tracks, terminals, technical buildings, warehouses etc.). Relations among Project Participants on the after construction stage when the rail track and its infrastructure will be operated. Rail track and its infrastructure usage payments as the investments return source

Implementation phases Phase I: Pre-feasibility study Memorandum of Understanding with Dutch MOVARES and NEA for pre- feasibility study, 133,000 EUR attracted from the Dutch government. Additional investment required for Phase 1 – 250,000 eur Phase II: 2009 – 2010 Pre-feasibility study presentation to all the stakeholders for final decision- making The establishment of the International Project Implementation Consortium Finalizing Project Finance Structure and Legal Model (PPP) Phase III: 2010 – 2013 Project Implementation: Construction the rail track from Polish/Ukrainian border to Lviv (86 km) New rail infrastructure development, including modern passenger and goods terminal near and in Lviv

Project impact assessment Increase of passenger and cargo flows Maximum shortening of the travel time Social and economic development of the region Ukraines integration with main European cities

Leonid Bogdanov, CEO Yuryi Stetskiv, CFO Kyiv, Ukraine Lesi Ukrainki Blvd, Tel.: Fax: