© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP 2009 3GPP The Training Course / Module 8 1 All you always wanted to know about.

Slides:



Advertisements
Similar presentations
Supplementary International Search (SIS) (PCT Rule 45bis)
Advertisements

Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
1 Advanced with GMail A CYC Electives Module
Armstrong Process Group, Inc. Copyright © , Armstrong Process Group, Inc., and others All rights reserved Armstrong Process.
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
SEM14-05 Approving your draft ETSI Seminar © ETSI All rights reserved.
EditHelp! Louise Webster editHelp! service © ETSI All rights reserved ETSI seminar.
SEM11-06 COMMITTEE PROCEDURES ETSI Seminar © ETSI All rights reserved.
SEM14-05 APPROVING YOUR DRAFT ETSI Seminar © ETSI All rights reserved.
The National Connection for Local Public Health Model Practice Reviewer Guide April - May 2010.
Click to edit Master title style Page - 1 OneSky Teams Step-by-Step Online Corporate Communication Support 2006.
Michigan Electronic Grants System Plus
Making the System Operational
©2010 AECsoft USA Confidential External User Guide AECsoft USA, Inc Yorktown, Suite 435 Houston TX ©2010 AECsoft USA Confidential.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 12a 1 All you always wanted to know about.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 4 1 All you always wanted to know about.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
Effectively applying ISO9001:2000 clauses 6 and 7.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 14 1 All you always wanted to know about.
“The Honeywell Web-based Corrective Action Solution”
1 1Line Training Capacity Release - Phase II Awards and Recall/Reput.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 3 1 All you always wanted to know about.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
CREATING A PAYMENT REQUEST FOR VENDOR IN SYSTEM
CREATING A PAYMENT REQUEST FOR A NEW VENDOR
1 3GPP TSGs SA Meeting #49, San Antonio, Texas, USA, September 2010 SP © 3GPP Organizational Partners Satisfaction survey results In.
1 REVIEWER ORIENTATION TO ENHANCED PEER REVIEW April
Waste Management External Supplier User Guide SciQuest USA, Inc 5433 Westheimer Ste 925 Houston, TX
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
CMPT 275 Software Engineering
Lecture 8: Testing, Verification and Validation
Lectures on File Management
XHTML Week Two Web Design. 2 What is XHTML? XHTML is the current standard for HTML Newest generation of HTML (post-HTML 4) but has many new features which.
Brief introduction to Secondary Care SOAR users Last updated: 13 th December 2012.
Brief introduction to Primary Care (GP) SOAR users Last updated: 24 th August 2012.
School Census Summer 2011 Headlines Version Jim Haywood Product Manager for Statutory Returns.
How to sign up for unite! To begin your registration, go to Employers and Volunteers, and click “Join Now” If you wish.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
New Rubrics? Create Assignment and Project Templates and Send the Assignments in Tk20 Must do before you can use updated rubrics Theresa Dorn.
Page 1 of 34 The Search Agreements functionality in Transfers enables you to find existing agreements pertaining to registered interests. Using the search.
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 10 1 All you always wanted to know about.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
All you always wanted to know about 3GPP … but were too afraid to ask.
Making online claims for OCR Nationals A step-by-step guide for centres.
E-Portfolio July2014 Managing Multi-source Feedback.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 7 1 All you always wanted to know about.
Design Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 2 1 All you always wanted to know about.
The change control cycle Or Where little 3GPP specifications come from …
SMART Agency Tipsheet Staff List This document focuses on setting up and maintaining program staff. Total Pages: 14 Staff Profile Staff Address Staff Assignment.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
SPSA Tool User Manual. Contents About the SPSA Tool……….…………………………………………………………………………… Login…………………………………………………………………………………………..……….……..……..8 Home.
WPM What’s behind the icon? Work Programme Management.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
The change control cycle Or Where little 3GPP specifications come from … Move to next slide.
Human Resources 1 G-Top Global Workflow Employee View September 2014.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 WPM What’s behind the icon? Work Programme Management.
In preparation for this training please read the articles ‘Using Fixture Templates’ and ‘Allotting Seeding Numbers to Sides’. If you do not have these.
SCC P2P – Collaboration Made Easy Contract Management training
Transmitted by the expert
Response to Comments Received on the a PAR and CSD
Managing Multi-source Feedback
Catalog Manager Standard Supplier Training.
DSG Governance Group Recommendations.
Presentation transcript:

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 1 All you always wanted to know about 3GPP … but were too afraid to ask. The 3GPP Seminar

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 2 The 3GPP Seminar Module 8 Work Items

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 3 WORK ITEM DESCRIPTION How to produce a correct WID

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 4 WORK ITEM DESCRIPTION The WID describes what is going to be done, the responsibility, and the timing for the development of a new “Feature” and/or “Building Block” (a WID is seldom drafted to describe a “Work Task” …) The WID template has been (recently) modified, but still seems to need further changes to improve it … The WID template is available on the 3GPP FTP site, at

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 5 WORK ITEM DESCRIPTION A 3GPP Release is made up of Features, and each proposed Feature is evaluated, discussed, and approved by “consensus”; the WID document is the tool used by Companies to propose new (or revise existing) work items to be developed by one or more WGs. If the responsible Working Group wishes to produce new (or revise existing) specification(s) to complete a new Feature … … the working group must agree upon one WID (F), and, if needed, upon one or more WID(s) (BBs).

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 6 WORK ITEM DESCRIPTION The WID template does not have any content in the Heading … but the usual information, e.g. Meeting number, location, date, agenda item, etc. SHOULD BE ADDED THERE ! At present, the heading is the following : 3GPP™ Work Item Description For guidance, see 3GPP Working Procedures, article 39; and 3GPP TR GPP Working Procedures3GPP TR

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 7 WORK ITEM DESCRIPTION Title: [Help1] Consider the title of the work item carefully, and keep the text reasonably brief. Avoid titles already in use, including in previous Releases. Do not mention the intended Release in the title, since timescales may change and move the item to a later Release. Once assigned, avoid changing the title in any substantive way, even if this means the title no longer embraces the full scope of the intended work, as the contents of that work becomes clearer with the passage of time.[Help1] Acronym: [Help2] This code will appear in the work plan and is to be used on Change Requests relating to this work item; see "A word on WI codes/acronyms" at The code proposed by the originator of the work item may be changed at approval time by the TSG if the original proposal is deemed inappropriate.[Help2] Unique identifier: [Help3] Leave this blank for new work items. For revisions, insert the unique_id value allocated by the Work Plan Coordinator; see

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 8 WORK ITEM DESCRIPTION Put an X in one or more of the boxes. Put an X in one of the boxes in the table above. A work item must be classed as one and one only of the listed categories. For more guidance, see 3GPP TR §6.0.2.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 9 WORK ITEM DESCRIPTION * Identify any work, possibly in a previous Release, which gave rise the current Feature. Note that there is no direct link from a Feature and the related Building Block(s) in the WID for a Feature. However, the link will appear in the 3GPP Work Plan.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 10 WORK ITEM DESCRIPTION * Normally, put an X in one box only. In simple cases, a single WID can be used to specify two or more stages. For guidance on the definition of stages, see 3GPP TR §4.1. Normally, put an X in one box only. * Identify any requirements specified in, e.g., an OMA specification, and which need to be considered during the elaboration of the current stage 1 work.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 11 WORK ITEM DESCRIPTION * It is recommended that the stage 1 specification justifying the stage 2 work be identified. This will typically be in a 3GPP stage 1 TS (give the TS number if already allocated) or, if no TS is yet available, in the corresponding WID (give the Unique_ID value). Alternatively, it is possible that the stage 1 is to be found in the publication of another body, in which case the second table should be used; be as explicit as possible in identifying the stage 1. * If no identified source of stage 1 information, justify: briefly explain why no stage 1 is necessary. If the stage 1 is specified by a body other than 3GPP, then identify the source and explain why stage 1 harmonization with 3GPP is not needed. This situation is exceptional.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 12 WORK ITEM DESCRIPTION * It is recommended that the stage 2 be identified, or, if none, the stage 1 work which gives rise to the stage 3 WID being specified. Occasionally a stage 3 work item will arise from implicit provisions of another stage 3 TS, or even a Change Request to an existing stage 3 TS (which must itself be associated with a work item). * If no identified source of stage 2 information, justify: briefly explain why no stage 2 is necessary. If the stage 2 is specified by a body other than 3GPP, then identify the source and explain why stage 2 harmonization with 3GPP is not needed. This situation is exceptional.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 13 WORK ITEM DESCRIPTION * All testing items must be associated with the provisions of a testable stage 3 requirement. * This clause is intended to be used in rare cases where the work does not fit into the foregoing classifications.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 14 WORK ITEM DESCRIPTION * For guidance on the use of work tasks, see 3GPP TR § * Explain in sufficient detail why this work is needed. * Give details of the goals to be achieved under this work item. The level of detail required is explained in 3GPP TR § Generally, the deeper the work item is in the hierarchy, the greater the level of technical detail needed in the WID. For high level items (Study Items, Features), the text of this clause should avoid technical language insofar as possible, and concentrate on the benefits which the work will bring to the 3GPP system or its users.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 15 WORK ITEM DESCRIPTION * Put an X in one or more boxes. Use the "don't know" row only if the impacts are unpredictable at the time of writing the WID, not as an excuse for failure to consider the greater picture.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 16 WORK ITEM DESCRIPTION * The time scale for the work is implied by the plenary TSG meeting at which the resulting deliverables will be seen and approved. There is no need to revise the WID if these initial estimates change during the course of the work, unless other significant changes (e.g. a change of objectives) are also required, in which case the plenary meetings can be corrected and, if known, the formal numbers for the new TSs and TRs given in place of the original placeholder numbers. List, in the top part of the table: the new specification(s) which will be produced under this work item if possible, give the spec series intended (see 3GPP TS §4.0); identify the remaining three digits with a temporary designation - eg 34.tpw in the case of TRs, indicate whether the TR is: xx.9xx = intended for publication by the Organizational Partners; or xx.8xx = for internal use of 3GPP and not to be published List, in the bottom part of the table: existing specifications

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 17 WORK ITEM DESCRIPTION * The name of a physical person. If the person is new to 3GPP work, give full contact coordinates, in particular, address. * Identify the lead working group (or parent Technical Specification Group) responsible for coordination of the work. Mention also any other groups from which input may be required. * See 3GPP Working Procedures, article 39, which specifies the minimum number of supporting IMs required (four), and the duties of those organizations. There is no upper limit to the number of supporting IMs.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 18 WORK ITEM DESCRIPTION Prior to each TSG plenary, all new WIDs are collected by the Secretary of the WG responsible for the WID. In case, the Secretary cleans the front page, e.g. accepts all revision marks (except if it is a revised WID), and checks that the fields are correctly filled in. A single TDoc is created for each WID. The WID is presented to the plenary TSG for approval. Presentation is the responsibility of the WG Chairman, assisted by the Secretary (if attending the Plenary). The TSG examines each WID and approves (or rejects, or postpones it). Some WIDs may be revised during the TSG meeting and re-presented (with a new Tdoc number). A WID may be withdrawn as well. The Support Team (MCC Specification Manager) uploads the approved WIDs onto the 3GPP FTP site, at The Support Team (MCC Work Plan Manager) incorporates the approved WIDs into the 3GPP Work Plan.

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 19 For more information visit Or contact