GPS and EGNOS in the EUR-SAM CORRIDOR

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Bellwork If you roll a die, what is the probability that you roll a 2 or an odd number? P(2 or odd) 2. Is this an example of mutually exclusive, overlapping,
Advanced Piloting Cruise Plot.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
GALILEO and EGNOS Fotis Karamitsos, European Commission
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
International Civil Aviation Organization
FANS (Future Air Navigation System) Flight Crew Procedures
Introduction to Navigation Specifications
EUROCONTROL Experimental Centre EUROCONTROL Navigation Domain The Data Collection Network: EGNOS revealed GNSS 2004 – Rotterdam, The Netherlands Santiago.
International Civil Aviation Organization
1 NEXTOR Monitoring and Modeling NAS Performance at the Daily Level Mark Hansen Performance Metrics TIM May 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
International Civil Aviation Organization
EGNOS Services and LPV Implementation IWG #25 St Petersburg, June IWG #25.
EGNOS: a satellite navigation system for Europe, and an opportunity for Africa! Michel Bosco Head, Galileo and EGNOS Applications and International Cooperation.
UTS:Faculty of Engineering and IT International Leaders in Practice-Based Education The 16th Asia-Pacific Conference on Communications 31 Oct. - 3 Nov.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Lecture 8: Testing, Verification and Validation
Chapter 10 Software Testing
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
Pirazzi Gabriele Intecs S.p.A Bruxelles, 10/04/2008 “Study of an SDR GNSS receiver” Chapter of Rome M.Sc. In Advanced Communication and Navigation Satellite.
METIS First Master Training & Seminar
Indian Satellite Navigation Programme N. G. Vasantha Kumar Dy. Director (Satnav & ACS) Indian Space Research Organisation INDIA.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Absolute Receiver Autonomous Integrity Monitoring (ARAIM)
Wide Area Augmentation System (WAAS) E. Douglas Aguilar CAPT, USAF.
Introduction to GAGAN & GAGAN Enabled Receiver
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
© GMV, 2010 Propiedad de GMV Todos los derechos reservados EUROPEAN GNSS EGNOS AND GALILEO. CHARACTERISTICS AND ADVANTAGES OF BRUSSELS. OCTOBER 1 st, 2010.
10/7/ Innovative Solutions International Satellite Navigation Division ION NTM 01 Capabilities of the WAAS and EGNOS For Time Transfer SBAS, an Alternate.
IGS Workshop 2008 The Galileo Ground Mission Segment Performances Francisco Amarillo-Fernandez, Massimo Crisci, Alexandre Ballereau John Dow, Martin Hollreiser,
European GNSS for ITS: EGNOS contribution ITS WORLD CONGRESS 2011 Orlando– 18 October 2011.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
1 Airport mobiles surveillance and control by means of EGNOS METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18 November 2009 Pierre GRUYER.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding EGNOS System Definition and Benefits.
EUROCONTROL Navigation Domain
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
The Experiment on DFMC SBAS
The Status of Dual-Frequency Multi-Constellation SBAS Trial by Japan
Experiments and Potential Applications
Augmentation Service from the Zenith
International Civil Aviation Organization
Presentation transcript:

GPS and EGNOS in the EUR-SAM CORRIDOR Lisardo Rodríguez Rabanal División de Navegación por Satélite Unidad EGNOS Torrejón

INDEX What is EGNOS? EGNOS ARCHITECTURE RNP FOR SBAS EGNOS COVERAGE AREA PERFORMANCES OVERVIEW EGNOS INTEGRITY CONCLUSIONS

WHAT IS EGNOS? EGNOS (European Geostationary Navigation Overlay Service) is the European SBAS (Satellite Based Augmentation System) compliant with the OACI standard (Annex 10 of SARPS) EGNOS uses the GPS and GLONASS constellations as well as additional geostationary satellites which signals are collected by a network of ground stations for generating the EGNOS navigation message

EGNOS ARCHITECTURE ( 2 INMARSAT III ( 2 INMARSAT III GPS GLONASS + 1 Artemis ) + 1 Artemis ) Spatial Segment GPS GPS GLONASS GLONASS User Segment Ranging Integrity and Monitoring Stations NLES NLES (dos por GEO) RIMS1 RIMS1 RIMS2 RIMS2 RIMS 34 RIMS … n Ground Segment EGNOS Network (EWAN) Red EGNOS (EWAN) MCC1 MCC1 MCC2 MCC2 MCC3 MCC3 MCC4 MCC4 Mission Control Centres PACF PACF ASQF ASQF DVP DVP Support Segment

RNP FOR SBAS (I) ACCURACY difference between the estimated position and the actual position. INTEGRITY is a measure of the trust which can be placed in the correctness of the information supplied by the system. Integrity includes the availability of the system to provide timely and valid warnings to the user (alerts) when the system must not be used for the intended operation.

RNP FOR SBAS (II) CONTINUITY It is the probability that the system will function properly for the duration of the flight operation given that the system was functioning properly at the beginning of the operation. AVAILABILITY The portion of time during which the system is to be used for navigation during which reliable navigation information is presented to the crew, autopilot or other system managing the flight of the aircraft.

RNP FOR SBAS (III)

EGNOS COVERAGE AREA EGNOS shall provide down to and including RNP 0.3 in the joint union of the ECAC Flight Information Regions (FIR). The shaded area comprises the footprint of all FIR of ECAC member States (including Canary Islands FIR) and the oceanic control areas of Reykjavik, Shanwick and Santa Maria.

PERFORMANCES OVERVIEW (GPS)

PERFORMANCES OVERVIEW (GPS)

PERFORMANCES OVERVIEW The accuracy of GPS achieved in the Canary Islands is quite good. As the Canary Islands are located in the border of the EGNOS service area (landmasses of the ECAC) the EGNOS accuracy will be quite similar to the GPS one. The reason is that some satellites are discarded during the solution computation because of the lack of the ionospheric computation.

EGNOS IONOSPHERIC MODEL

SATELLITES USED vs. IN VIEW

EGNOS INTEGRITY So the GPS/GLONASS performances in terms of accuracy could achieve the required performances for En-route, Terminal Area and Non-Precision Approach. However GPS as standalone system does not reach the performances in terms of integrity, continuity and availability. We need a measure of the trust which can be placed in the correctness of the navigation solution and timely alerts to the users when the navigation system must not be used for the intended operation.

EGNOS INTEGRITY To ensure that the GNSS position error is acceptable an alert limit is defined that represents the largest position error which results in a safe operation. At the same time EGNOS provides us the means to compute an estimation of the navigation error (Protection Level). Position errors greater than the alarm limit must be indicated to the crew, otherwise integrity has failed and flight safety is at risk. The GNSS integrity requirement is validated my means of measurements and simulations (due to the stringent probability 10-7) checking that the Navigation Error is bounded by the Protection Level.

EGNOS INTEGRITY (SIMULATIONS) The next slides contain results obtained with the EGNOS End-To-End Simulator. A constellation of 27 GPS satellites + 1 EGNOS GEO has been configured. The EGNOS performances are evaluated in several airports in Canary Islands The results allow us to obtain an overview of the accuracy and integrity achieved with EGNOS in the Canary Islands.

APV-I IN LANZAROTE

APV-I IN LANZAROTE

CONCLUSIONS Good GPS accuracy in the Canary Islands region “When you get a GPS navigation signal, how do you know you can trust it?” EGNOS will tell you whether you can trust the signal. It will tell you that you are at a particular spot with a high degree of certainty and definitely within an area enclosed by a circle with the spot at the centre. In effect, it will give you your position and say by how much it could be out.”

CONCLUSIONS En-route phases of flight can also take advantage of the EGNOS Integrity, Continuity and Availability benefits Operational EGNOS (Operational Validation, ATC interface, Procedures Design)

CONTACT DETAILS Lisardo Rodríguez Rabanal Aena / Satellite Navigation Division EGNOS UNIT Phone: 91 678 54 00/06 e-mail: lisardor@aena.es jacuadron@aena.es