High Performance Public Buildings Proposed Final Report Joint Legislative Audit & Review Committee June 23, 2011 Mark Fleming, JLARC Staff.

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
1 Career Pathways for All Students PreK-14 2 Compiled by Sue Updegraff Keystone AEA Information from –Iowa Career Pathways –Iowa School-to-Work –Iowa.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
April 23, 2014 Sunset Review of Alternative Process for UW Medical Facility Construction Projects Proposed Scope & Objectives Mark Fleming, JLARC Staff.
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
Stormwater Permit Requirements at the Department of Transportation Proposed Final Report Joint Legislative Audit & Review Committee January 5, 2011 Stephanie.
Prescription Drug Purchasing Consortium Performance Audit Proposed Final Report Joint Legislative Audit and Review Committee October 22, 2008 John Bowden,
Manufacturing Innovation Sunset Review: Proposed Final Report Joint Legislative Audit & Review Committee December 1, 2011 John Woolley, JLARC Staff Legislature.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
DNR Helicopter Use and Cost Proposed Final Report Joint Legislative Audit & Review Committee January 5, 2011 John Bowden, JLARC Staff.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
State Ferry Terminals: Procedures to Account for and Request Capital Funds Have Improved, but Additional Actions Are Needed Joint Legislative Audit & Review.
BRIEFING REPORT Preparing for JLARCs 2011 and 2016 Performance Audits of the Puget Sound Partnership Joint Legislative Audit & Review Committee June 17,
Developmental Disabilities Employment and Day Services Proposed Final Report Joint Legislative Audit & Review Committee October 20, 2010 Elisabeth Donner,
May 17, 2012 Lottery Marketing & Incentive Pay: Jackpot and Economy, Not Advertising or Beneficiary Change, Appeared to Impact Ticket Sales Peter Heineccius.
VOORBLAD.
Accuracy of Capital Project Cost Estimates Proposed Final Report Joint Legislative Audit & Review Committee September 23, 2009 Mark Fleming, JLARC Staff.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
7/16/08 1 New Mexico’s Indicator-based Information System for Public Health Data (NM-IBIS) Community Health Assessment Training July 16, 2008.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
How Cells Obtain Energy from Food
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
December 10, 2014 The Legislature Should Reauthorize the UW Medical Construction Contractor Alternative Process Because Timeliness and Quality Have Improved.
Tax Preference Performance Review: Beef Processors Proposed Final Report Joint Legislative Audit & Review Committee March 21, 2007 Lizbeth Martin-Mahar.
Presentation transcript:

High Performance Public Buildings Proposed Final Report Joint Legislative Audit & Review Committee June 23, 2011 Mark Fleming, JLARC Staff

June 23, 2011High Performance Public Buildings2 Overview of Audit Results High performance requirements add 1 to 3 percent to public building design and construction costs High performance building energy efficiency is mixed Lack of data and methodology issues limit evaluation of building performance Definitive conclusion is premature

June 23, 2011High Performance Public Buildings3 Public Buildings Must Meet High Performance Standards Required by ESSB 5509 (2005) to: −Promote efficient use of energy and other resources; and −Create productive learning and working environments for occupants Legislation establishes reporting requirements −Legislature intended to monitor results Report Pages 3-6

June 23, Projects as of June 2010 High Performance Public Buildings4 Report Page 7 Source: JLARC analysis of information provided by GA, OSPI, and Department of Commerce. Number of Projects School Districts State Agencies & Higher Ed Institutions Commerce- Housing Trust Fund Commerce- Community Development 74 projects 90 projects 65 projects 45 projects Total projects 176 Incomplete 98 Complete: 66 Data not reported 32 Data available

5 Impact of high performance requirements on public building design and construction costs The Evergreen State College Seminar II building

June 23, 2011High Performance Public Buildings6 Added Cost of Meeting High Performance Requirements Ranges from 1% to 3% Estimate presented to Legislature in 2005 −High performance requirements would add about 2% to design and construction costs Average percent of added cost: Report Pages State agency/higher education projects 14 K-12 school projects 0.9% 2.6%

7 How high performance buildings actually perform Rachel Carson Elementary Library Media Center

June 23, 2011 Compared to Actual use JLARC Review Analyzed Energy Performance in Four Ways High Performance Public Buildings8 Report Pages Design estimate 2 of 7 buildings achieved estimated energy efficiency High performance buildings Similar conventional buildings In 5 of 8 school districts high performance buildings were more energy efficient than conventional buildings 2. Energy useNational benchmark 5 of 13 schools earn Energy Star designation 3. Energy useChange over time 8 of 9 schools with more than 22 months data improved energy efficiency 4. Compared to

June 23, 2011High Performance Public Buildings9 Energy Performance is Mixed JLARC review shows that for each measure some high performance buildings demonstrate greater energy efficiency while others do not Definitive conclusion is premature at this time Report Page 18

June 23, 2011 Why Actual Energy Use May Not Meet Estimates Building managers and construction professionals identified various factors, including: −Operation and maintenance practices −How occupants use or don’t use high performance features Some school districts have created positions to educate building managers and occupants in energy conservation practices High Performance Public Buildings10 Report Page 12

11 Lack of data and methodology issues limit evaluation Lynnwood High School

June 23, 2011High Performance Public Buildings12 Information About High Performance Buildings Is Not Complete GA and OSPI created procedures for collecting cost and operational data −Information for many projects has not been reported Department of Commerce −Has not reported on affordable housing projects −Interprets law as not requiring reports on community development projects Report Pages 21-22

June 23, 2011 JLARC Was Not Able to Assess Building Impact on Workers and Students Most studies of worker productivity are based on subjective information, such as surveys −Two studies that measure productivity focus on industrial production National Academy of Sciences found no evidence-based studies that analyze whether green schools differ from conventional schools on student performance High Performance Public Buildings13 Report Pages 23-24

June 23, 2011High Performance Public Buildings14 Recommendation 1 The Department of General Administration, OSPI, and Department of Commerce should develop plans to ensure that they receive complete and accurate data on high performance buildings and analyze program results. −Report to JLARC and legislative fiscal committees by December 2011 Report Page 25 General Administration OSPI Commerce OFM Concurs No comment Agency Responses

June 23, 2011 Recommendation 2 If the Legislature wants information on high performance projects supported by community development grants, it should clarify Chapter 39.35D RCW to specifically require the Department of Commerce to obtain that information from grant recipients. High Performance Public Buildings15 Report Page 26 General Administration OSPI Commerce OFM No comment Concurs No comment Agency Responses

June 23, 2011High Performance Public Buildings16 Contact Information Mark Fleming