2002 November 16 CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Insertion Device Toshi Tanabe, ID group leader 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
Advertisements

Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
Sources and Beam Lines of Canadian Light Source Emil Hallin Canadian Light Source (material organized and presented by D.T. Jiang)
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
Maher Attal On behalf of SESAME Team Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East M. Attal, XXII ESLS.
Main Bullet #1 Main Bullet #2 Main Bullet #3 Canadian Light Source National Synchrotron Light Facility.
1 BROOKHAVEN SCIENCE ASSOCIATES Lonny Berman and Dario Arena, NSLS Summary The present built-out NSLS-II design includes: 30 bending magnet ports, each.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
CLS Status Update E. Matias Canadian Light Source.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities John Hill CFAC review October 18 th, 2006.
Sept.2001 Shanghai symposium D.T. Jiang Acknowledgements Deming Shu, APS Tom Rebedeue, SSRL.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
ASTeC 10 Years On SRS Support Paul Quinn October 2011.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Turkish Accelerator and Radiation Laboratory at Ankara Suat ÖZKORUCUKLU İstanbul University.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ELECTRON MOVING AT CONSTANT VELOCITY
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
BROOKHAVEN SCIENCE ASSOCIATES NSLS-II - New opportunities for high pressure research - Lars Ehm National Synchrotron Light Source Brookhaven National Laboratory.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
O. Kester, NuSTAR annual meeting, 27/02/2013
Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East SESAME, Allan, Jordan Maher Attal On behalf of SESAME Team.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
PETRA III, Status and Upgrade
Improving & combining the spatiale & temporal resolution
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
CLS Status Update E. Matias Canadian Light Source June 8, 2018
CLEX* Status and Plans CTF3 complex CLEX
SuperB Injection, RF stations, Vibration and Operations
Coupling Correction at the Australian Synchrotron
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Potential Use of PEP-II Magnets by Project X
Injector Performance Requirements Conventional Facilities Update
X-ray Pump-Probe Instrument
LCLS Injector: Introduction D. H
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
Maximum Credible Beam Event Paul Emma et al
Elettra – Sincrotrone Trieste S.C.p.A.
LCLS Injector System Overview D. H
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

2002 November 16 CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting

2002 November 16 E-gun & Linac Transfer Line & Booster ring Storage ring Beamline & End Station Synchrotron Facility

2002 November 16 Sector (1 of 12) Beamlines on a single CLS sector –Two bending magnet lines –One or more ID lines Use of chicanes to get 2 undulator lines per straight Needed to meet demand for insertion device beamlines

2002 November 16 Injector Status Linac and transfer line to Booster –Modifications for 1 Hz operation complete –Continuing to improve control system and diagnotics Booster (“Turn-key” system from Danfysik) –Commissioning of technical systems started in June and were completed in August (more detail in Les Dallin’s talk) –Formal acceptance of Booster completed by mid-September –Booster now shut down until needed for Storage ring commissioning

2002 November 16 Storage Ring Status - 1 Major Sub-systems: –Dipole magnets (Tesla) - delivered –Quadrupole and Sextupole magnets (Sigma-Phi) – first set delivered, rest by year-end 2002 –Corrector magnets (Budker Institute) – delivered by year-end 2002 –Kicker magnets (Danfysik) – delivered by mid-February 2003 –DC Power supplies (IE Power) – 50% delivered, remained by year-end 2002 –RF amplifier (Thales) – commissioning at CLS –LHe plant (Linde) – operating at CLS –RF cavity (ACCEL) – delivery by year-end –Vacuum chambers (FMB) – 8 sectors delivered, remainder by year-end –Supports and girders (Saskatoon) - delivered

2002 November 16 Storage Ring Status - 2 Installation –Water cooling and support pillar installation started in November –Install one sector by mid-December 2002 –Install remaining sectors by end of February 2003 –Commissioning of sub-systems will be done in parallel, so far as possible –Target: first injected beam in March 2003 Commissioning –Beam tests in evenings and week-ends –Main building must be evacuated until commissioning radiation surveys confirm design radiation levels –3-week on / 3-week off schedule likely –Target: light for first beamlines by mid-summer 2003

2002 November 16 IT Infrastructure Phase I of IT infrastructure complete –Dual Cisco 6509 switches (1Gb →10Gb) –Voice-over-IP telephones –Redundant multi-mode and single-mode fibre network throughout facility –Direct fibre connection available for each beamline –Virtual LANs for office, controls, users, beamlines, etc. Phase II implementation started: –1-3 Terabyte Storage Area Network –Improved user connectivity to external Internet and CA4.net –Possible upgrading of local computational resources

2002 November 16 Beamlines: IR High-resolution Far-IR Spectroscopy –Quotations received on spectrometer –RFPs for design-build of UHV and HV portions of optical system out by mid-December –Hutch construction started –~13% of budget committed by 2002 Oct 31 –Start commissioning: ~ September, 2003 Mid-IR Microscopy –Quotations due on spectrometer –RFPs for design-build of UHV and HV portions of optical system out by mid-December –Hutch construction started –~25% of budget committed by 2002 Oct 31 –Start commissioning: ~ October, 2003

2002 November 16 Beamlines: PGM & SGM VLS Plane Grating Monochromator –All major components ordered –Delivery of most components by 2003 June, except for Fixed-aperture High-Heat-Load most (2003 October) –185mm PPM undulator ready by 2003 June –ID vacuum chambers (APS) to be delivered in 2003 July –~70% of budget committed by 2002 October 31 High-resolution Spherical Grating Monochromator –Same as above for most components –Shipment of existing SGM components from Madison at the end of summer 2003 –45 mm PPM undulator ready by mid-summer 2003 –~80% of budget committed by 2002 October 31

2002 November 16 Beamline: Spectromicroscopy Soft X-ray Spectromicroscopy –Mirrors, gratings and monochromator ordered –Mirror manipulator tenders under evaluation –Started design specification of microscopy end-station –ID vacuum chambers (APS) to be delivered in 2003 July –All beamline components, including EPU (Elliptically Polarized Undulator), should be available by 2003 fall –ID straight designed to accommodate a second chicaned EPU –~40% of budget committed by 2002 October 31

2002 November 16 Beamline: CMCF-I Canadian Macromolecular Crystallography Facility –Mirrors and beamline components ordered, with delivery scheduled for 2003 September –Work continues on white beam transport line and endstation specifications –Started work on specification of control and IT requirements –Magnets ordered for Small-gap Undulator (SGU), work continues on specification of vacuum chamber –Beamline completion planned by 2003 Fall, but SGU might not be ready until early 2004 –~40% of budget committed by 2002 October 31

2002 November 16 Beamline: Micro-XAFS Hard X-ray XAFS / Micro-probe –Micro-probe capability (~2 μm resolution) and some powder diffraction capability added to design –Uses 31 mm multi-pole superconducting wiggler –Preliminary Design Report under review now –RFP for beamline and wiggler design-build expected to be issued by year end –Some risk that delivery completion will not be possible before early 2004 –~7% of budget committed by 2002 October 31

2002 November 16 SUMMARY Injection System Operational Storage Ring installation has started First injected beam in early spring 2003 First light for beamlines in mid-summer 2003 Five beamlines ready for light by fall 2003 –Two IR lines –Three soft X-ray lines CMCF line ready by fall 2003, except for ID may be delayed until early 2004 Micro-XAFS line ready in early 2004