Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Assessment of Individual Transitional Housing constructed by the DRD in Thandwe.

Slides:



Advertisements
Similar presentations
Technology Commercialisation System Richard Linley Associate Consultant.
Advertisements

Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
LIBERIA CAP: GENDER MARKER Presented by: Ayoo Osen Odicoh-Inter-Agency Gender Advisor
1 External Relations Evaluation Unit Result and Impact Indicators for the Road Sector.
Prime and Composite Numbers. These are numbers that have only two factors – themselves and one. These are numbers that have only two factors – themselves.
0 - 0.
1 1  1 =.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Wants.
Who Wants To Be A Millionaire? Decimal Edition Question 1.
Operational Material. A 7-sheet Survey Questionnaire Resource Inputs and Basic Headings Outline Overall Validation Process Timetable Overall Methodology.
Strategies for Global Value Added: Gains Comparative advantage © Professor Daniel F. Spulber.
Building a Better Future Stretch Building Code October 15, 2009.
Lessons Learnt from Past Disaster David Evans Chief Technical Advisor
Real Estate Market Analysis
Relationships Between Two Variables: Cross-Tabulation
Money, Interest Rates, and Exchange Rates
UN satellite image analysis – continuity is key to success GEO-X, Side Event by Secure World Foundation – 13 January 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Adding Up In Chunks.
2.2.1 Property Rights and Land Tenure 1 PROPERTY RIGHTS AND LAND TENURE UPA Package 2, Module 2.
Early Recovery (ER) Coordination Yemen.. What is Early Recovery “Is a multidimensional process of recovery, from a man made or natural disaster, that.
Debriefing OCHA/IASC Geneva November 2008 Inter-Agency Real Time Evaluation of the Response to Cyclone Nargis.
Joint Assessment to the Northeast: Preliminary Findings.
WASH Cluster – Emergency Training W W0 1 Water in Emergencies Opening session Introductions and the Cluster Approach.
Test B, 100 Subtraction Facts
Physics for Scientists & Engineers, 3rd Edition
1 Title I, Part D Data: SY 2012−13 Data Preview, Data Quality, and Upcoming CSPR Clarifications Dory Seidel and Jenna Tweedie, NDTAC.
Analyzing Financial Statements
What the quarterly Labour Force Survey can tell us about the economic circumstances of people with sight loss Sue Keil RNIB.
Student conference Tuesday 7 and Wednesday 8 October 2014.
gREEN KaravanGhar Low Carbon Footprint, Sustainable Architecture
Alain Bertaud Urbanist Module 1: Introduction and the Context The role of, government, urban planners and markets.
Information Management for Refugees & Displaced Persons from Myanmar Lyndy Worsham Information Management Coordinator.
RE BUILDING VILLAGES IN 30 DAYS BY PETER ROBERTS.
SHELTER IN DISASTER RESPONSE International Federation of Red Cross and Red Crescent Societies.
1 Emergency and Transitional Shelter Concepts. 2 Definition of terms 1.What is “emergency shelter”? 2.What is “transitional shelter”? 3.What are “household.
Shelter response options 1.Emergency Shelter 2.Shelter assistance kits 3.Shelter grants 4.Core Houses )T-Shelter 5.Evacuation camp assistance 6.Permanent.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
IOM Pakistan- One Room Shelter Program. The Program  The IOM ORS program is a shelter assistance program aimed at providing permanent shelter to the.
Sustainable Modular Homes Jamie Britto, Nicole DeJonghe, Max DuBuisson, Kelly Schmandt
Shelter Cluster Donors and Heads of Agencies Strategic Meeting 17:00, Nov 21 st, 2013.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by This session will look at the impacts on response of climatic.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
Fuels For Schools. II. Our Partnership I. Heating Schools With Wood 2 Main Topics:
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by This workshop discusses implementing a strategy for supporting.
Shelter Meeting 09b is hosted by UNHCR Safer Homes, Stronger Communities: Rebuilding After Disaster Update of “Safer Homes, Stronger Communities: Rebuilding.
1. Trip overview Field locations Agencies consulted 2. Executive summary Current responses Remaining shelter needs 3. Technical notes Vernacular construction.
Shelter Meeting 09b is hosted by UNHCR Shelter After Disaster: update Shelter After Disaster: transitional settlement and reconstruction Shelter After.
Production and Cost CH 7, 8. Outline Production Costs Output Decisions Pricing Market Environment and Consumer Demand Firm’s Objectives.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session introduces the six transitional settlement options.
28 th November SC Agenda – 28 nd November 2012 Opening & Introductions Minutes of the meeting 7 th November, including action.
Security Planning & Emergency Preparedness Planning Workshop Kenya June 14 th -15 th.
Cash for Repair & Reconstruction Project, Sri Lanka 1 November 16 / 2006 Cash for Rehabilitation Home owner driven housing reconstruction project in Sri.
Transitional shelter. Who do you think you are? Not an academic Recent graduate from Cardiff - did this course Working for ELRHA – part of Save the Children.
Shifts in Aggregate Demand (AD)  There are two parts to a shift in AD:  A change in C, I G, G and/or X N  A multiplier effect that produces a greater.
Terms of Reference This initiative is part of an ECHO-funded, UNHCR-led Enhanced Response Capacity (ERC) project that aims to improve capacity, coordination.
Developing a session plan S3.1 session day Text Dimension 40 Arial BOLD Position: Horizontal 5.44 Vertical 2.40 Text Dimension 24 Arial BOLD ITALICS Position:
Support the Earthquake Affected population to meet their relief and early recovery need in Rasuwa District Aug 2015 – Apr 2016 Funded By.
CaLP Asia Cash Transfer Programming and Persons of Concern Workshop Centre Point Hotel Chidlom Bangkok, Thailand March 2016.
Housing, Land and Property (HLP) Rights in Shelter:
Pre-Contract Cost Control
Economic systems Analysis Who makes the economic decisions?
SCG Barisal Field trip report
Repair and reconstruction project (Technical support) Gatlang Rasuwa
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
Shelter and settlement options
133 Implementing settlement programmes
TBC Cash Assistance Programme for IDPs in Southeast Myanmar
Presentation transcript:

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Assessment of Individual Transitional Housing constructed by the DRD in Thandwe Township

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Inter-Communal Violence Sept 29 th – Oct 2nd houses burnt: – 11 Rakhine – 101 Kaman Most affected villages: - Tha Bye Chaing (52 HH) - Pauktaw & Shwe Lay (44HH)

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Affected HH & Type of Assistance Village TractVillage / Hamlet EthnicityType of Shelter Assistance RakhineKamanCash GrantContractor Auk Nat MawTha Byu Chaing Shwe HlayPauktaw -36 Shwe Hlay -88 Mae Kyun -10 Wet Htee TaungMya Kyun 11 Kin MawKyauk Seik 11 An Naw 11 Thandwe (Urban)Ward Thandwe (Urban)Ward (10%) 100 (90%) 57 (52%) 54 (48%)

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 8 HH 10 HH 36 HH 52 HH 1 HH 2 HH Map of the Affected Villages in Thandwe Township

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Enabling Factors  Effective Rapid Response from MRCS  Quick and Effective Decision-Making from RSG exemplified by the decision to provide cash grants  Strong Demand to Return to their point of origin  No Pre-existing Land Disputes in the affected villages  All the affected HH received Equal Assistance: Cash Grants Construction by a local contractor

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Transitional Shelter constructed by a Contractor  Small Floor Area [16ft x 15ft]  No Kitchen Area  No Partition Walls  No Area for Rice Storage  Lower Quality Workmanship / Materials  Single Design  No Anti-Pest Treatment

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter HH receiving Cash Grants  Designs Tailored to Household Specifications  Larger Floor Areas  Attached Kitchens  Higher Quality Materials used  Reasonable Workmanship

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Factors Requiring Improvement  IDPs were unable to make structural alterations to the generic designs constructed by contractors  Local economies have limited technical skills available directly affecting the rate of construction  IDPs had limited influence over the quality of materials used on structures built by contractors  Limited technical support provided particularly for those receiving cash grants

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Key Learnings  Preferred implementation strategy: – Cash Grants with supporting Technical Assistance  Private Building Contractors: – Reduce the sense of ownership – Increase the risks of sub-standard workmanship  BoQs must reflect ‘real’ market prices  Local Carpenters require capacity building prior to construction  Full-Time Engineers required on-site throughout [Technical Assistance & Monitor Workmanship]

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Draft Minimum Technical Standards for Transitional Shelter Floor Area: ( 18ft x17ft ) + Kitchen ( 9ft x 6ft ) Concrete Footings 5 “ x 5” Scantling Timber Columns Planked Floor Bamboo Mat Walling Thatched Roof

Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter The Way Forward