AN OVERVIEW OF REGULATION FOR EMBEDDED GENERATION. LAGOS – JULY, 2014.

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

Nairobi, Kenya, 26 – 27July 2010 Maintaining Equipment Standards to ensure good QoS Mwende Njiraini Engineer I/NT/LCS Communications Commission of Kenya.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
To be or not to be in Romania? The perspective of Energy from Renewable Sources - Prague, Nov Konečná & Zacha ● GGI EasyMeet Adrian Achimescu.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
The Role of regulators in Energy security Sergey G.Novikov Head of Federal Tariff Service of Russian Federation Istanbul
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 11 Renewable Energy Module 11: DISTRIBUTED GENERATION: OPTIONS AND APPROACHES.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
Engineering Technology Division
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
NERC LICENSING AND REGULATORY FRAMEWORK Dr. Steven Andzenge, MON Commissioner Legal, Licensing & Enforcement, NERC Abuja, 29 th November, 2011.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Electricity Reforms in Bangladesh
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
Implementation of EU Electronic Communication Directives.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Presentation on the Green Energy Act for South Simcoe Municipalities Susan Lloyd Swail M.E.S. Planning Candidate Intern at Nottawasaga Futures Green Economy.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
Rpc Pwc A business of Transmission Services Agreement.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
Wholesale Electricity Spot Market (WESM)
Energy regulation and quality of service -Macedonian Experience- Slave Ivanovski Energy Regulatory commission of the Republic of Macedonia 4 th Poverty.
Course 3.6 Regulatory Commissions: Management & Staff Functions, Bangladesh, Mar 31- Apr 4, 2002 SOUTH ASIA REGIONAL INITIATIVE/ENERGY Regulatory Commission.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
RFPEG Belize 2013 Public Utilities Commission. Objectives of RFPEG Belize 2013 PUC Act: Section 22 (1)It shall be the duty of the Commission to ensure.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Renewable energy support schemes in the Republic of Moldova
Electricity & Regulatory Overview of Korea
Damitha Kumarasinghe Director General
Operationalizing One Nation One Grid
INTERCONNECTION GUIDELINES
Overview of the Electricity Regulation Bill
Overview of the Electricity Regulation Bill
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
Network Contracting with Generators (incl
City Council April 30, 2018 Item 13
Electricity Industry in Sri Lanka prior to 2002
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

AN OVERVIEW OF REGULATION FOR EMBEDDED GENERATION. LAGOS – JULY, 2014.

Outline of Presentation: 1.Definition & Types of Embedded Generation (EG) 2.Benefits of Embedded Generation 3.Technical & Economic Considerations of Embedded Generation 4.Aim of EG, Legal & Regulatory Provisions 5.General Provisions 6.Connection of Embedded Generation 7.Commercial Arrangements 8.Participation in other regulated activities 9.Miscellaneous Provisions 10.Conclusion

Embedded Generation:  Embedded Generation (EG) is when a generator is connected to a distribution network operated by the Distribution Company (DisCo) licensed by the Commission.  The generators are connected directly to or near the load centre on the distribution network (i.e., 33kV, 11kV or 0.415kV).  Embedded generation ensures that power generated is utilized in a particular locality, state, or geo-political region, and/or supplied to an eligible customers and others. Therefore, if a State or Local Government builds an embedded generation facility, the power generated can be supplied to its constituents.

Technology Types of Embedded Generation: Generally, EG tends to consist of smaller or modular generators that use a variety of generation technologies such as the following:  Modular Combined Cycle Turbines  OCGT  Wind Turbine  Small, Mini/Micro Hydro  Micro Steam Turbine  Solar (PV or Thermal)  Oil-fired Power  Geothermal  Biomass  Diesel and Oil fired  Tidal Wave

Benefits of Embedded Generation (EG):  Business Activities – Provision of opportunities for various manufacturing and service activities in Nigeria.  Economy – Growth in the revenue of businesses, and in the country’s economy.  Investment – Will attract investments, both from local and foreign sources (in the power sector, and other sectors)  Government Participation – Increases the participation of Local and State Governments in the power sector.  Reliability of Supply – Reliable power supply protects sensitive industrial equipments, and ensures optimal operation of the equipments.  Minimise line losses and voltage sag - Closeness to load results in more efficient power transportation.  Substitute for supply from the Grid - Source of power in areas not connected to the grid (i.e. rural areas).  Backup / Stand-by Generation - Ensure regular power when supply from grid is temporarily insufficient to meet the demand.  Ancillary Services – Provision of Voltage or Frequency Control.  Employment – Increase in power supply encourages industrialization, which translates to a decrease in the unemployment rate.

Technical Benefits of Embedded Generation  Reduced cost of connection.  Transmission use of networks costs is avoided.  Ease of deployment of the infrastructure.  Network Loss Factor is reduced.  Improved utilization of distribution assets by the Discos.  End users can benefit through adequate supply of electricity, lower end user tariffs, and potentially increased reliability and quality of supply.  EG has lower capital cost, modular construction and short build times.  Growth in EG will contribute to fuel diversity, mix and security of supply as diverse sources are tapped including Renewable Energy Plants.  Reduction of GHG emissions in Nigeria.  In the long term, reduction of overall costs of energy consumed by providing a more efficient electricity system that generates and supply power close to the point of use.

Technical Considerations for Embedded Generation: Load Requirement - Profile of load plus running regime at load centres Network Protection - Over current protection of Embedded Generation infrastructures under short-circuit conditions (e.g. protective devices), reverse power protection etc.. Connection to Distribution network - Conditions for connecting to Distribution network (e.g. min/max generation, metering etc.) Technology of plant - Suitability of Embedded Generation type to load condition

Economic Considerations for Embedded Generation: Cost / Benefits of Embedded Generation - Measure and quantify the costs and benefits of / against supply from the grid network. Income Generation - Expected revenue from sale of excess power to the Distribution network. Operating Costs - Start up and running costs and expected payback period. Fuel requirement - Source and reliability of fuel supply, especially for hydro carbon fuel based Embedded Generation (e.g. gas, oil, diesel etc.)

Legal and Regulatory provisions for Embedded Generation EPSR Act S. 62 states that engaging in the business of electricity generation of 1MW and above requires a licence be issued by NERC, excluding captive (i.e., strictly for own use). Specifically, S. 64 explains further the activities of a generation licensee, which includes successor companies or IPPs. Distribution Code - Part 2 S of the Planning and Connection Code provides for the requirements for connecting generators to distribution networks. Market Rules - Sections & 2 permits the distributor to purchase embedded generation under certain conditions. The main aim of this Regulation is to provide a regulatory framework for fair competition between grid supplied power and distribution connected supplied power that will ultimately result to improved availability, reliability, quality, safety and affordability of supply to meet the demands of the consumers.

Eligibility  Distribution Licensees intending to procure embedded generation shall first apply to the Commission for permission and shall satisfy S &2 of the Market Rules prior to approval by the Commission.  The maximum embedded generation capacity allowable for a given Distribution System shall be a percentage of the peak system load as determined by the Commission from time to time.

Commercial Arrangements:  Network Agreements: The Embedded Generator and the Distribution Licensee shall enter into the following Agreements: o Connection Agreement/Interface Agreement o Use of Networks Agreement o Ancillary Services Agreement  The Distribution Licensee shall develop and publish standard agreements, and such other additional terms and conditions approved by the Commission.  Network Charges : All Charges by the Distribution Licensee shall be as approved by the Commission.  The Distribution Licensee shall provide in the connection offer a disaggregation of the proposed charges which shall indicate the cost of the following:  dedicated connection assets required for the connection;  extension of the existing asset ;  modification and augmentation of the existing network;  metering and data collection; and  any provision for operation, repair and maintenance of relevant network assets.

 Eligible Customers: Subject to the declaration of eligible customers by the Hon. Minister, the EG may enter into agreements with eligible customers (not covered by MYTO). o The EG shall agree with the Distribution Licensee on the use of its network. o The Distribution Use of System (DUoS) Charge shall be guided by the provisions of the tariff methodology in force.  Distribution and Trading Licensees: The tariff methodology in force shall apply, subject to the satisfaction of conditions specified in Section (a)&(b) of the Market Rules.  Feed-In-Tariffs (FITs): Feed-In-Tariffs (FITs) approved by the Commission, shall be applied for energy supplied by Renewable Energy Embedded Generators.  Recovery of Costs by the Embedded Generator: Where the Distribution Licensee cannot undertake the re-enforcements and extension needed to evacuate the power into its network, the Connection Agreement shall provide for the recovery of the cost incurred by the EG. Tariff

Billing and Metering  Metering of Customers and Embedded Generators shall be mandatory.  Billing shall be consolidated in the master database system of the Distribution Licensee for proper energy accounting irrespective of metering technology.

Licensing Requirements and Procedures: General Provisions  The process of licensing of an Embedded Generator shall not exceed six (6) months.  An application shall be submitted in the form and manner approved by the Commission. Conditions for Grant of a Licence The Commission may issue a licence to construct, own, operate and maintain, or to procure the construction, operation and maintenance of an Embedded Generation facility; provided that a licence shall not be issued unless the Commission is satisfied that S &2 of the Market Rules as well as other conditions stipulated in these regulations are complied with. Embedded Generation Licence Application Procedure All applications for an embedded generation licence, and related proceedings shall be governed by NERC Application for Licence Regulations 2010.

Licensing Requirements and Procedures: The application shall be accompanied by the following documents:  Power Purchase Agreement (PPA);  Connection Agreement;  Use of Distribution System Agreement;  Ancillary Services Agreement;  Fuel Supply Agreement (FSA);  EIA Approval (above 10MW) or plan for managing effluents if below 10MW;  Registered title deed; and  Corporate Documents.

Miscellaneous Provisions: Proceedings before the Commission All proceedings before the Commission shall be governed by the Business Rules. Amendment or repeal The Commission may amend or repeal any provision of the Regulation. Dispute resolution Disputes between the Distribution Licensee and Embedded Generator which are not resolved by the parties will be handled in accordance with the procedure outlined in Rule 43 of the Market Rules (market participants), or the Dispute Resolution procedure approved by the Commission (non-market participant).

Conclusion :  Approval of this Regulation – A positive move towards laying out the regulatory frameworks and conditions for the operation of EG, which will be a better option for several investors intending to participate in the market. (e.g., state and local governments).  Network Access – The Commission shall ensure open access to the distribution networks by all EGs by supervising the activities of the Discos regarding applications for connections ( e.g., review of the periodic reports submitted by the Discos).  Provision of information - Information regarding the distribution network(s) must be freely available to prospective investors and EG for the project to succeed (e.g., all necessary information required should be easily accessible).