Project Sales or Production Levels Using the Rolling Average © 20111.

Slides:



Advertisements
Similar presentations
Course Introduction © Dale R. Geiger Even Super Powers Can Lose a Cost War Kamchatka Peninsula, Russia Aral Sea, Kazakhstan Soviet military installation.
Advertisements

Agenda of Week V. Forecasting
Explain Change in Financial Position Over a Period of Time © Dale R. Geiger
Calculate Financial Position and Net Change in Financial Position © Dale R. Geiger
Verify Unit of Measure in a Multivariate Equation ©
Library 1 Online Postwar European History: Web Sites for a European Digital & Digital Public History 23 rd of November 2011, Historical Archives of the.
Overview of Lecture Partitioning Evaluating the Null Hypothesis ANOVA
Assumptions underlying regression analysis
Feb 1, 2011MME Orientation MME. Feb 1, 2011MME Orientation Welcome First Year Orientation for Mechanical and Materials Engineering (MME) Tue,
Calculate Cost of Goods Sold and Ending Overhead Balance
Module 4. Forecasting MGS3100.
Texas Education Agency Division of IDEA Coordination August 2011.
Milk Market Situation Brussels, 20 October Market Situation –20 October !!! Data from some Member States are confidential and are NOT included.
Communication costs of LU decomposition algorithms for banded matrices Razvan Carbunescu 12/02/20111.
Februari Organisation 22. Februari KI´s education and research DANDERYD HOSPITAL 155 FTE students Research SEK 39 million 31 FTE employees.
9: Examining Relationships in Quantitative Research ESSENTIALS OF MARKETING RESEARCH Hair/Wolfinbarger/Ortinau/Bush.
Roy Ernest Database Administrator Pinnacle Sports Worldwide SQL Server High Availability.
SE320: Introduction to Computer Games Week 2 Gazihan Alankus 10/4/20111.
Chapter 11: Forecasting Models
Chapter 10 Regression. Defining Regression Simple linear regression features one independent variable and one dependent variable, as in correlation the.
Calculate Point of Indifference Between Two Cost Scenarios
Time Series Analysis Autocorrelation Naive & Simple Averaging
Chapter 12 - Forecasting Forecasting is important in the business decision-making process in which a current choice or decision has future implications:
Forecasting.
MOVING AVERAGES AND EXPONENTIAL SMOOTHING
Calculate Total Cost and Per-Unit Cost for a Given Production Volume ©1.
Time Series and Forecasting
Slides 13b: Time-Series Models; Measuring Forecast Error
Identify Sensitive Variables through What-if Scenarios ©
Identify Sensitive Variables © Dale R. Geiger
Calculate Volume and Performance Variances ©1. What Does it Mean?? 37 Best in class or worst? Best in class or worst? 37 out of 100? or 37 out of 37?
Slides by John Loucks St. Edward’s University.
Introduction to Linear Regression and Correlation Analysis
Project Sales Or Production Levels Using The Rolling Average © Dale R. Geiger
Winter’s Exponential smoothing
LSS Black Belt Training Forecasting. Forecasting Models Forecasting Techniques Qualitative Models Delphi Method Jury of Executive Opinion Sales Force.
The Importance of Forecasting in POM
Forecasting Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Linear Trend Lines Y t = b 0 + b 1 X t Where Y t is the dependent variable being forecasted X t is the independent variable being used to explain Y. In.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Time Series Forecasting Chapter 13.
Calculate Expected Values of Alternative Courses of Action 1.
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Forecasting © The McGraw-Hill Companies, Inc., 2003 chapter 9.
1 Chapter 12 Simple Linear Regression. 2 Chapter Outline  Simple Linear Regression Model  Least Squares Method  Coefficient of Determination  Model.
Time Series Analysis and Forecasting
Calculate Present or Future Value of Cash Flows © Dale R. Geiger
Calculate Present or Future Value of Cash Flows ©
10B11PD311 Economics. Process of predicting a future event on the basis of past as well as present knowledge and experience Underlying basis of all business.
STATISTICS 12.0 Correlation and Linear Regression “Correlation and Linear Regression -”Causal Forecasting Method.
CORRELATION. Correlation key concepts: Types of correlation Methods of studying correlation a) Scatter diagram b) Karl pearson’s coefficient of correlation.
Calculate Economic Order Quantity © Dale R. Geiger
Jon Curwin and Roger Slater, QUANTITATIVE METHODS: A SHORT COURSE ISBN © Thomson Learning 2004 Jon Curwin and Roger Slater, QUANTITATIVE.
LSP 120: Quantitative Reasoning and Technological Literacy Topic 1: Introduction to Quantitative Reasoning and Linear Models Lecture Notes 1.2 Prepared.
DEPARTMENT OF MECHANICAL ENGINEERING VII-SEMESTER PRODUCTION TECHNOLOGY-II 1 CHAPTER NO.4 FORECASTING.
Forecasting is the art and science of predicting future events.
Calculate Economic Order Quantity © What do you think? Corporal O’Reilly, the supply clerk, knows that it costs the Army money to generate a purchase.
13 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Forecasting 13 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
1 Ch 3: Forecasting: Techniques and Routes Introduction Forecasting is the establishment of future expectations by the analysis of past data, or the formation.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 3 Forecasting.
Forecas ting Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 15 Forecasting. Forecasting Methods n Forecasting methods can be classified as qualitative or quantitative. n Such methods are appropriate when.
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
Chapter 4 More on Two-Variable Data. Four Corners Play a game of four corners, selecting the corner each time by rolling a die Collect the data in a table.
3-1Forecasting Weighted Moving Average Formula w t = weight given to time period “t” occurrence (weights must add to one) The formula for the moving average.
Welcome to MM305 Unit 5 Seminar Dr. Bob Forecasting.
Mixed Costs Chapter 2: Managerial Accounting and Cost Concepts. In this chapter we explain how managers need to rely on different cost classifications.
Project Sales or Production Levels Using the Rolling Average
Calculate Economic Order Quantity
Exponential Smoothing
Presentation transcript:

Project Sales or Production Levels Using the Rolling Average © 20111

What if? You planned for 10 but… © 2011

Terminal Learning Objective Task: Project Sales or Production Levels Using the Rolling Average Condition: You are training to become an ACE with access to ICAM course handouts, readings, and spreadsheet tools and awareness of Operational Environment (OE)/Contemporary Operational Environment (COE) variables and actors Standard: with at least 80% accuracy Demonstrate understanding of Trend Projection concepts © 20113

Importance of Demand We have seen how demand drives cost Flexible forecasting Assumptions about probabilities may not yield useful information Precisely wrong Examining trends gives another perspective on demand © 20114

Predicting the Future © 20115

What is Trend Projection? Uses historical data about past demand to make estimates of future demand Relies on systematic methodologies and assumptions Cannot predict the future or anticipate catastrophic events © 20116

Three Methods Regression Represents a straight line with the least squared error from actual Rolling average Uses average of prior period demand to predict future period demand Planning factors Assumes a relationship between a current value and future demand © 20117

Regression Analysis Plots a linear relationship between multiple data points Minimizes the squared errors Square difference between mean and actual to eliminate negative values Uses the format y = mx + b where: ©

Regression Results Very predictable The ascending series is y = x + 4 and we can predict that the 7 th period would need 11 burgers The descending series is y = -x + 17 and we can predict that the 7 th period would need 10 © 20119

Regression Exercise Use spreadsheet to predict the 8 th, 9 th, and 10 th event burger demand if the first six demands were: ©

Spreadsheet Exercise © The spreadsheet returns the equation: y = 1.4x Enter the values in the equation to project future demand The spreadsheet returns the equation: y = 1.4x Enter the values in the equation to project future demand Demand for: Period 8 = 17 Period 9 = 19 Period 10 = 20 Demand for: Period 8 = 17 Period 9 = 19 Period 10 = 20

Regression Analysis ©

Example: Using Regression to Estimate Fixed and Variable Costs Consider four quarters of data Regression returns y = 2.2x Q1Q2Q3Q4 Units5678 Total Cost Fixed cost is 13.7 Variable cost is 2.2 per unit Total cost is *units Fixed cost is 13.7 Variable cost is 2.2 per unit Total cost is *units

Regression Analysis © Notice that four very different sets of data all have very similar regression lines The x-axis in these graphs represents time periods in series

Regression Strengths and Weaknesses Can be calculated very precisely But cumbersome to do by hand(use spreadsheet!) May be precisely wrong Can be used to identify trends But by definition cannot predict downturns or upturns Assumes relationship is linear and will remain linear ©

Learning Check In the context of trend projection, what does the regression line represent? What is the main weakness of regression in trend projection? ©

Rolling Average Uses average of prior periods to predict future periods Evens out highs and lows by using a number of periods Key assumption for predictions: Assumes that the average will be maintained Example: Average of Periods 2, 3 & 4 will equal average of periods 1, 2 & 3 ©

Rolling Average Calculation The demand for our last twelve periods has been: Task: Calculate the 3-month rolling average for periods 3-12 ©

Rolling Average Calculation The 3-month rolling average is the average value for the most recent 3 months Per1 + Per2 + Per3 3 Add the most recent period to the calculation and drop the oldest Per2 + Per3 + Per4 3 ©

Rolling Average Calculation © Period 1not enough data 2 not enough data 3( )/3 = 6.0 4( )/3 = 5.0 5( )/3 = 4.7 6( )/3 = 5.0 Period 7( )/3 = ( )/3 = 6.3 9( )/3 = ( )/3 = ( )/3 = ( )/3 = 5.0

Rolling Average Calculation © Period 7( )/3 = ( )/3 = 6.3 9( )/3 = ( )/3 = ( )/3 = ( )/3 = 5.0

Rolling Average Calculation © Period 7( )/3 = ( )/3 = 6.3 9( )/3 = ( )/3 = ( )/3 = ( )/3 = 5.0

Rolling Average Calculation © Period 7( )/3 = ( )/3 = 6.3 9( )/3 = ( )/3 = ( )/3 = ( )/3 = 5.0

Rolling Average Calculation © Period 1not enough data 2 not enough data 3( )/3 = 6.0 4( )/3 = 5.0 5( )/3 = 4.7 6( )/3 = 5.0 Period 7( )/3 = ( )/3 = 6.3 9( )/3 = ( )/3 = ( )/3 = ( )/3 = 5.0

Graph of Rolling Average © This is a time series. X-axis represents sequential time periods

Graph of Rolling Average © This is a time series. X-axis represents sequential time periods

Rolling Average vs. Regression © This is a time series. X-axis represents sequential time periods

Using Rolling Average to Project Future Demand Assume that the previous rolling average will be maintained Our forecast for period 13 will assume a rolling average of 5, same as period 12 (Per11 + Per12 + Per13)/3 = 5 ©

Using Rolling Average to Project Future Demand Plug in the known values and solve the equation: (Per11 + Per12 + Per13)/3 = 5 ( Per13)/3 = 5 3 * ( Per13)/3 = 5 * Per13 = 15 Per13 = 6 ©

Using Rolling Average to Project Future Demand Plug in the known values and solve the equation: (Per11 + Per12 + Per13)/3 = 5 ( Per13)/3 = 5 3 * ( Per13)/3 = 5 * Per13 = 15 Per13 = 6 © What would regression analysis project? Which is right? What would regression analysis project? Which is right?

Rolling Average vs. Regression © This is a time series. X-axis represents sequential time periods 13 3 month rolling average suggests an inflection point has changed the trend Regression picks up the long term downward trend, predicting another decrease

Rolling Average Strengths and Weaknesses Can be calculated very precisely But may be precisely wrong Simple to calculate The main strength of rolling averages is that they dampen the effect of short term changes This helps decision makers avoid knee jerk responses to changes in demand that may not be significant Decision makers are often looking for inflection points An inflection point in a six month rolling average carries a lot of weight ©

Learning Check What would be the equation for a six-month rolling average calculation? What is the primary assumption when using rolling average to project future demand? ©

Planning Factors Assume some cause and effect relationship If we suspect that demand for education counseling decreases when a unit deploys We could study the history of that relationship and determine a planning factor (or ratio) of sessions per soldier as a We could then use that factor to plan for the drop in session demand when X soldiers deploy as New demand = a*X ©

Planning Factor Example Given the recent history determine the planning factor relating sessions and soldiers Use that factor to predict sessions as population goes to ©

Planning Factor Example Given the recent history determine the planning factor relating sessions and soldiers Use that factor to predict sessions as population goes to 8000 *.032 = *.032 = *.032 = 192 © Total = /62365 =.032 or 3.2%

Leading Indicators Leading indicators are similar to planning factors with a couple differences Leading indicators often have a weaker cause and effect relationship Changes in consumer confidence index may foreshadow an increase in sales at the post exchange There is a period of time before the effect is seen (i.e. thats why they are called leading indicators) ©

Learning Check What are planning factors? How are planning factors generally expressed? ©

Practical Exercise ©