CERN IT Department CH-1211 Genève 23 Switzerland www.cern.ch/i t The Agile Infrastructure Project Part 1: Configuration Management Tim Bell Gavin McCance.

Slides:



Advertisements
Similar presentations
Implementing Tableau Server in an Enterprise Environment
Advertisements

About Me CTO, Individual Digital, Inc. (Startup) Author of ext/tidy, PHP 5 Unleashed, Zend Ent. PHP Patterns
Configuration management
Software change management
Continuous Integration (CI) By Jim Rush Version Control Build Test Report.
EHarmony in Cloud Subtitle Brian Ko. eHarmony Online subscription-based matchmaking service Available in United States, Canada, Australia and United Kingdom.
Mike Azocar Sr. Developer Technical Specialist Microsoft Corporation
Slide 1 of 9 Presenting 24x7 Scheduler The art of computer automation Press PageDown key or click to advance.
DNN LOVES JENKINS FOR CONTINUOUS INTEGRATION
CERN IT Department CH-1211 Genève 23 Switzerland t Integrating Lemon Monitoring and Alarming System with the new CERN Agile Infrastructure.
Getting to Push Button Deploys Moovweb January 19, 2012.
Cloud computing is the use of computing resources (hardware and software) that are delivered as a service over the Internet. Cloud is the metaphor for.
 Cloud computing  Workflow  Workflow lifecycle  Workflow design  Workflow tools : xcp, eucalyptus, open nebula.
CERN - IT Department CH-1211 Genève 23 Switzerland t Monitoring the ATLAS Distributed Data Management System Ricardo Rocha (CERN) on behalf.
M.A.Doman Short video intro Model for enabling the delivery of computing as a SERVICE.
CERN IT Department CH-1211 Genève 23 Switzerland t The CERN Agile Infrastructure Project: Configuration and Operations Tools Helge Meinhard.
608D CloudStack 3.0 Omer Palo Readiness Specialist, WW Tech Support Readiness May 8, 2012.
CERN IT Department CH-1211 Genève 23 Switzerland t Experiences running a production Puppet Ben Jones HEPiX Bologna Spring.
Configuration Management Evolution at CERN Gavin
CERN IT Department CH-1211 Geneva 23 Switzerland t Daniel Gomez Ruben Gaspar Ignacio Coterillo * Dawid Wojcik *CERN/CSIC funded by Spanish.
Continuous Integration and Code Review: how IT can help Alex Lossent – IT/PES – Version Control Systems 29-Sep st Forum1.
1 The new Fabric Management Tools in Production at CERN Thorsten Kleinwort for CERN IT/FIO HEPiX Autumn 2003 Triumf Vancouver Monday, October 20, 2003.
Quattor-for-Castor Jan van Eldik Sept 7, Outline Overview of CERN –Central bits CDB template structure SWREP –Local bits Updating profiles.
Large Farm 'Real Life Problems' and their Solutions Thorsten Kleinwort CERN IT/FIO HEPiX II/2004 BNL.
20-May-2003HEPiX Amsterdam EDG Fabric Management on Solaris G. Cancio Melia, L. Cons, Ph. Defert, I. Reguero, J. Pelegrin, P. Poznanski, C. Ungil Presented.
Jose Castro Leon CERN – IT/OIS CERN Agile Infrastructure Infrastructure as a Service.
CERN IT Department CH-1211 Genève 23 Switzerland t The Agile Infrastructure Project Part 1: Configuration Management Tim Bell Gavin McCance.
Microsoft Management Seminar Series SMS 2003 Change Management.
IBM Bluemix Ecosystem Development Hands on Workshop Section 1 - Overview.
CERN IT Department CH-1211 Geneva 23 Switzerland t CF Computing Facilities Agile Infrastructure Monitoring CERN IT/CF.
Introduction To BlueMix By: Ryan
CERN IT Department CH-1211 Genève 23 Switzerland PES 1 Ermis service for DNS Load Balancer configuration HEPiX Fall 2014 Aris Angelogiannopoulos,
CERN IT Department CH-1211 Genève 23 Switzerland t IT Configuration Activities Gavin McCance Online Cross-experiment Meeting, 14 June 2012.
1 CERN IT Department CH-1211 Genève 23 Switzerland t Puppet in the CERN CC Tomas Karasek Steve Traylen Oct
2012 Objectives for CernVM. PH/SFT Technical Group Meeting CernVM/Subprojects The R&D phase of the project has finished and we continue to work as part.
Tim Bell 04/07/2013 Intel Openlab Briefing2.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF Agile Infrastructure Monitoring HEPiX Spring th April.
SPI NIGHTLIES Alex Hodgkins. SPI nightlies  Build and test various software projects each night  Provide a nightlies summary page that displays all.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
CERN IT Department CH-1211 Genève 23 Switzerland t CERN IT Monitoring and Data Analytics Pedro Andrade (IT-GT) Openlab Workshop on Data Analytics.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF Alarming with GNI VOC WG meeting 12 th September.
CERN IT Department CH-1211 Genève 23 Switzerland t Migration from ELFMs to Agile Infrastructure CERN, IT Department.
CERN - IT Department CH-1211 Genève 23 Switzerland t Operating systems and Information Services OIS Proposed Drupal Service Definition IT-OIS.
CERN IT Department CH-1211 Genève 23 Switzerland t CERN Agile Infrastructure Monitoring Pedro Andrade CERN – IT/GT HEPiX Spring 2012.
CERN AI Config Management 16/07/15 AI for INFN visit2 Overview for INFN visit.
The Next Level Of Agile: DevOps and CD אוקטובר 2015.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF Cluman: Advanced Cluster Management for Large-scale Infrastructures.
Virtual Lab Overview 5/21/2015 xxxxxxxxxx NWS/MDL/CIRA.
Cloud Installation & Configuration Management. Outline  Definitions  Tools, “Comparison”  References.
Platform & Engineering Services CERN IT Department CH-1211 Geneva 23 Switzerland t PES Agile Infrastructure Project Overview : Status and.
Configuration Services at CERN HEPiX fall Ben Jones, HEPiX Fall 2014.
Automating operational procedures with Daniel Fernández Rodríguez - Akos Hencz -
Cofax Scalability Document Version Scaling Cofax in General The scalability of Cofax is directly related to the system software, hardware and network.
DECTRIS Ltd Baden-Daettwil Switzerland Continuous Integration and Automatic Testing for the FLUKA release using Jenkins (and Docker)
CERN IT Department CH-1211 Genève 23 Switzerland M.Schröder, Hepix Vancouver 2011 OCS Inventory at CERN Matthias Schröder (IT-OIS)
Agenda:- DevOps Tools Chef Jenkins Puppet Apache Ant Apache Maven Logstash Docker New Relic Gradle Git.
From manual test shop to fully automated test coverage: A How-To session to speed up your journey Jayshree Bhakta ITHAKA/JSTOR.
Stress Free Deployments with Octopus Deploy
IT Services Katarzyna Dziedziniewicz-Wojcik IT-DB.
Infrastructure Orchestration to Optimize Testing
Work Package 4 Software Integration and Distribution
Running Computers in CC
4th Forum How to easily offer your application as a self-service template by using OpenShift and GitLab-CI 4th Forum Alberto.
Drupal VM and Docker4Drupal For Drupal Development Platform
Drupal VM and Docker4Drupal as Consistent Drupal Development Platform
Dev Test on Windows Azure Solution in a Box
Simplified Development Toolkit
OpenStack Summit Berlin – November 14, 2018
Harrison Howell CSCE 824 Dr. Farkas
Presentation transcript:

CERN IT Department CH-1211 Genève 23 Switzerland t The Agile Infrastructure Project Part 1: Configuration Management Tim Bell Gavin McCance

Configuration and Operations Tools IT Technical Forum – 27 Jan 20122

Project scope The project is reviewing the entire CERN computer-centre management toolset –What happens from the bare metal up –Asset management, inventory –Sysadmin tools and maintenance workflows –Service management and configuration tools –Dynamic configuration for ‘virtual’ hosts –Operations monitoring –Workflow automation and continuous deployment IT Technical Forum – 27 Jan 20123

Configuration and Operations Tools IT Technical Forum – 27 Jan 20124

Why? Current production system built around the Quattor toolset is successfully managing 10k servers –(CERN) Quattor + many CERN components Why are we changing the toolset? IT Technical Forum – 27 Jan 20125

What are the issues Uncompressible technical debt –The cost to develop and maintain our own solution is not reducing and clearly exceeds our resources –Small community (less funding) and general support problem. At CERN, we’ve fallen into the “sticky hands” support model We need better automation and integration between the sub-components –Lack of automated workflow: everything is a ticket Script™ : your added value in the process is often your CERN password –The 15-min “CDB commit walk” – context switch cost IT Technical Forum – 27 Jan 20126

What are the issues Transferrable skills and training –Learning curve for our tools is steep and remains high –It’s easier to hire people who have skills in a widely- used tool than your internal tools Depending on where you look IT Technical Forum – 27 Jan 20127

Jobs adverts – indeed.com IT Technical Forum – 27 Jan Index of millions of worldwide job posts across thousands of job sites These are the sort of posts our departing staff will be applying for. Puppet Quattor

Integration is hard IPv6, virtualisation, Windows Server all need a solution –We could leverage lots of open source tools But piecemeal integration of these requires high investment due to our complex system Years of organic growth have made the system way too ‘hairy’ It’s often easier to reinvent rather than integrate –Lack of ‘dynamic-ness’ in the infrastructure We hack the config system for dynamic VMs It’s critical to look at the system as a whole IT Technical Forum – 27 Jan 20129

Where to look? Large ops community out there taking the “tool chain” approach whose scaling needs match ours: O(100k) servers, many apps Become standard and join this community IT Technical Forum – 27 Jan

Use Puppet for the core The tool space has exploded in the last few years –In configuration management and ops –Large, shared ‘tool forges’, and lots of experience Puppet and Chef are the clear leaders for the ‘core’ tool –other tools in our ‘scope’ try to integrate with those Many large-scale enterprises use Puppet –It’s declarative approach fits better with what we’re used to –Large installations: friendly, wide-base community and commercial support and training –You can buy books on it IT Technical Forum – 27 Jan

Scaling challenges: nodes Currently we have O(10k) physical nodes IaaS approach: –Moving to virtual machines –More (smaller, load-balanced) service nodes –VMs for raw compute (batch or pilot jobs) –Homogeneous: compute + storage on the same node Add another computer centre, 24/48 SMT cores per node, you get 100k – 300k virtual nodes to be managed –99.6% (1) node update success-rate means 1200 manual interventions to “fix it” (1) in a recent intervention on lxbatch IT Technical Forum – 27 Jan

Scaling challenges: people IT Technical Forum – 27 Jan Many, diverse applications (“clusters”) managed by different teams..and 700+ other “unmanaged” Linux nodes in VMs that could benefit from a simple configuration system

IT Technical Forum – 27 Jan 2012 Agile Infrastructure 1 st Try First started investigating tools in September using ‘part- time’ resources from CF, DB, DSS, GT, OIS and PES –Trying iterative “agile-sprint” style (Scrum): short sprints, feedback, sprint review, visible –Take first, best-guess at architecture and tool selection, iterate Mixed success with this agile style –What works: Good visibility and reviews. Daily “scrum” meeting useful. Weekly review meeting open to management. –What doesn’t: The “time boxing” part of of Scrum sprints is hard with part-time resources –The project planning now foresees more dedication of staff 14

Agile Infrastructure 1 st Try We’re currently running: –OpenStack as cloud software for virtual machines, image management, bulk storage Future IT forum presentation –Puppet for the configuration management core –…with Foreman as a dashboard IT Technical Forum – 27 Jan

Foreman dashboard IT Technical Forum – 27 Jan

Agile Infrastructure 1 st Try We’re currently running: –OpenStack as cloud software for virtual machines, image management, bulk storage Future IT forum presentation –Puppet for the configuration management core –…with Foreman as a dashboard None of the tools are “perfect” out-of-the-box –..but we’d rather submit patches to a good open source tool than re- implement it –We’ve experienced very good community support: RFCs and patches are quickly accepted –Very active community: often problems are fixed and missing features implemented before you even report them IT Technical Forum – 27 Jan

Agile Infrastructure 1 st Try We’re currently running: –yum for software distribution (replacing spma) –git for template management: why git? Almost all the Puppet (and Chef) usage schemes out there assume you use git to handle the templates Many of the tools we can benefit from also assume git We should not be different from the rest of the community IT Technical Forum – 27 Jan

Puppet Client/server architecture –“puppetmaster”: horizontally scalable Rails application –X509 cert authenticated nodes: integrate with CERN CA IT Technical Forum – 27 Jan

Puppet Puppet runs on the client, applying the configuration changes –It detects the current state and only runs if there’s something to do It runs every few minutes –new configuration will be ~immediately applied (“fail-fast”). –This is a change from CDB where ‘latent’ changes can be stacked up Normal mode is client-side compile (“assume success”) –No more CDB commit waits –Change from CDB: the compilation fails later Good monitoring is a pre-req: puppet sends reports back to the puppetmaster –The Foreman tool can collect these for you IT Technical Forum – 27 Jan

Puppet language Puppet uses it’s own Ruby-like language for the templates to “assert” the desired state of the nodes –With Ruby fall-back for hard stuff (we’ve only needed this once) Being declarative rather than procedural, there are quirks –Takes a bit of practice to ‘get it’ –There are books, online docs, online cook-books, and a large community to help It dispenses with the need for ncm components –All the work is done by puppet on the node itself – you just provide the template part to assert what you want done –Less software -> easier to move to new OS versions IT Technical Forum – 27 Jan

Externals Puppet uses an external DB for much of the configuration that we currently store in textual CDB templates Node function + hardware –Moving a host between clusters is a DB update Your configuration can use variables the node detects itself –e.g. reconfigure daemons based on where a newly live-migrated VM has found itself Query the compiled configuration of other hosts –e.g. Open my firewall to the lxadm nodes IT Technical Forum – 27 Jan

Moving towards PaaS Parametrisable recipes –Just fill in the blanks The aim is to make it easy to use “pre-canned” recipes without even touching a Puppet template –e.g. stick a standard CERN SSO-enabled apache / mod_wsgi / Django server on my box –…with these parameters Moving us in the PaaS direction –Ultimately, it would be better if you never even needed to log into this node (J2EE public service, IT web hosting service, MySQL service) IT Technical Forum – 27 Jan

Standard workflow IT Technical Forum – 27 Jan check out from CDB update templates CDB commit run and check on test node notify with nc-client n minutes Iterate CDB on lxadm check out from git update templates git commit and push run and check on test node notify with mcollective 1 minute Iterate Puppet on lxadm check out from git on the test node update templates run puppet-apply check on test node notify with mcollective Iterate Puppet-apply on test node check on foreman check on node(s) check on foreman git commit and push

Modernising our processes Our software processes for the computer centre are fairly limited –fire-and-forget broadcasts to project-elfms …and rather manual –The manual test/ -> preprod/ -> prod/ template dance –Our toolset RPMs are ‘built on laptop’ and uploaded to ‘swrep’ by hand Add standard CI (e.g. Jenkins, Bamboo, Cruise) and automated build (Koji) as the only route to get new packages into the CC –.. then automate the testing –e.g. suitably tagged RPMs are automatically deployed to /test nodes. IT Technical Forum – 27 Jan

Modernising our processes We’re working out which of the many puppet / git models suits us –code review, sign-off and automated notification for changes that will affect multiple clusters –How to automate the test/preprod/prod advancement Pre-req is flexible monitoring and alarming –you need to trust that an automation failure will be signaled to you Script-generated s are banned –Need good monitoring to hang these notifications on Integrate components rather than use Script™ –Script-generated tickets (where your value in the process is your password), are banned IT Technical Forum – 27 Jan

Current tool snapshot (liable to change) IT Technical Forum – 27 Jan Jenkins Koji, Mock Puppet Foreman AIMS/PXE Foreman AIMS/PXE Foreman Yum repo Pulp Yum repo Pulp Puppet stored config DB mcollective, yum JIRA Lemon git, SVN Openstack Nova Hardware database

Preliminary timelines YearWhatActions 2011Agree overall principles 2012Prepare formal project plan Establish IaaS in CERN CC Production Agile Infrastructure Monitoring Implementation as per WG Migrate lxcloud Early adopters to Agile Infrastructure 2013LSD 1 New Data Centre Extend IaaS to remote CC Business Continuity Support Experiment App re-work Migrate CVI General migration to Agile with SLC6 and Windows LSD 1 (to November) Phase out Quattor/CDB/… IT Technical Forum – 27 Jan Aggressive schedule if we are to make it for new data centre

Initial steps Decide on tools now and integrate them together to make a production setup (Q1) –We can still change.. But we’re starting to commit… Looking for early adopters (from Q1) –In particular to understand the people-scaling / ACL issues: which of the git/puppet models is best? e.g. PES/OIS services: batch/VMs, JIRA, Drupal rs2012https://twiki.cern.ch/twiki/bin/view/AgileInfrastructure/EarlyAdopte rs2012 –Help with integration / coding –Help with ideas –Help with building the task list IT Technical Forum – 27 Jan

Summary IT has started a new project to move our infrastructure to a new toolset based around industry standard open source components –Puppet for the core configuration tool –Better integration between components –Use of more modern software processes to aid deployment –Better monitoring –Engage with the community rather than re-implement Overall project scope is wider (future IT forums) –Cloud and virtualisation, improved monitoring Please get involved early and give feedback IT Technical Forum – 27 Jan

Backup slides IT Technical Forum – 27 Jan

Code ownership model The “sticky hands” support model (“you touched it last!”) We’re working out an FE-based model where –Code is owned by the related service Functional-Element –“Ownership” confers the responsibility to maintain a decent “standard config” for the computer centre, and the responsibility to roll out new versions of that code/config –Patches from interested people can be offered, and if you take them, you support them not the guy that gave you the patch IT Technical Forum – 27 Jan

mcollective and messaging mcollective is a notification framework –Mix of CERN’s not.d / wassh –It broadcast instructions to run “pre-canned” tasks to nodes selected by a filter collects the results from the nodes then renders that result for the CLI e.g. restart all my webservers, do a puppet run now It requires a messaging framework that all nodes subscribe to (to receive the notification) –Typically: AcvtiveMQ or RabbitMQ –Both Openstack and our (future) monitoring system need a CC wide messaging system as well IT Technical Forum – 27 Jan