1 Public Utilities Commission of the State of California March 23, 2004 Wyoming Wyoming Natural Gas Pipeline Authority.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Transwestern Pipeline
Energy Supply Opportunities: the Economic Advantage for Northeast Wyoming Campbell County Economic Development Corporation, Wednesday, May 11 th, 2005,
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Presented to the Wyoming Pipeline Authority March 23, 2004
WYOMING PIPELINE AUTHORITY
Bob Mishler Director Business Development January 15, 2008 LLC.
APPA CEO Roundtable Phoenix, AZ March 15, 2011
Advanced Piloting Cruise Plot.
Jubail Industrial City A $45 Billion Super Project
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
R O A D U S E R F E E T A S K F O R C E 1 OREGONS TRANSPORTATION FUNDING CHALLENGE.
1 Williams Current Drilling and Producing Operations n Currently have 25 drilling rigs operating in Garfield and Rio Blanco Counties. 16 in Valley and.
1 Williams Current Drilling and Producing Operations n Currently have 25 drilling rigs operating in Garfield and Rio Blanco Counties. 18 in Valley and.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
ZMQS ZMQS
1 Update on Water Issues in Wyoming IPAMS Summer 2007 Meeting Vail, Colorado Brian Jeffries Executive Director Wyoming Pipeline Authority.
ABC Technology Project
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
Available Capacity to Serve AZ
Squares and Square Root WALK. Solve each problem REVIEW:
Chapter 5 Test Review Sections 5-1 through 5-4.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
1 AEC October 31, To Chicago Western U.S. Gas Grid Northern Border Kern PGT Northwest El Paso CIG & WIC Trailblazer CIG KN Potential Connect to.
Dena E. Wiggins February 16, 2015 National Association of Regulatory Utility Commissioners Winter Meeting CONNECTING THE DOTS: FROM THE WELLHEAD.
Natural Gas & Oil Infrastructure in the Rockies An Update JOINT MINERALS, BUSINESS AND ECONOMIC DEVELOPMENT COMMITTEE Casper, Wyoming May 25, 2006.
Shelley A. Wright Wyoming Pipeline Authority January 27, 2004 Expansion Projects Update.
Ultra Petroleum Corp. Michael D. Watford Chairman,President & CEO Chairman, President & CEO.
Bryan Hassler, Executive Director Western Energy Institute Domestic Supply Perspectives October 23, 2003 Las Vegas, NV.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
Wyoming Pipeline Authority August 30, 2005 Gaylen Haag Business Development Questar Pipeline Company.
5/10/07 Pipeline CO2 Spec Columbia Gas1.25 ANR Pipeline2.00 Panhandle Eastern2.00 Texas Eastern3.00 Tennessee3.00 Rockies Express Northern Natural Another.
1 JOINT MINERALS, BUSINESS AND ECONOMIC DEVELOPMENT COMMITTEE December 5, 2005.
1 Questar Pipeline Current Capacity and Development Shelley A. Wright Director, Business Development May 15, 2007 Wyoming Pipeline Authority Meeting.
Rockies Alliance Pipeline Wyoming Pipeline Authority Meeting Casper, Wyoming October 21, 2008 Gaylen Haag.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Leadership Wyoming Class of 2005 Gillette, WY October 21,
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Presentation to Wyoming Natural Gas Pipeline Authority: Financing Natural Gas Pipeline Projects in Wyoming August 26, 2003.
Promoting Energy Infrastructure, Creating Opportunities, and Enhancing Reliability Business Continuity Strategies Houston, TX November 9-10, 2006.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
Energy Action Plan Natural Gas Update California Public Utilities Commission California Energy Commission Randy Roesser December 8,
Page 0 WYOMING’S NATURAL GAS – At a Glance October 26, 2004.
Wyoming Natural Gas Pipeline Authority Wyoming State Emergency Response Commission, January 20, 2006, Cheyenne, WY Presented by Colby Drechsel, Technical.
1 Legislative Session February 17, Proposed Legislative Changes Increase WPA bonding capacity from $1 billion to $3 billion Expand State Treasurer’s.
Wyoming Pipeline Authority October 28, 2003 Mark Quinlan Director Marketing. Mark Quinlan Director Marketing.
1 Casper Cheyenne Questar Wamsutter Pipeline Project Description Montana North Dakota South Dakota Nebraska Colorado Utah Wyoming Phase1 245 mile pipeline.
Major Changes in Natural Gas Transportation Capacity, 1998 – 2008 Next  The following presentation was prepared to illustrate graphically the areas of.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Wyoming Enhanced Oil Recovery Institute Joint Producers Meeting CO 2 in Wyoming June 26, 2007 Casper, WY Brian Jeffries Executive Director Wyoming Pipeline.
Totem Gas Storage Project Wyoming Pipeline Authority March 23, 2004.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
Natural Resources Infrastructure Needs Colorado Oil and Gas Association Denver, CO August 9, 2006.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Member Companies Aka Energy Group, LLC Anadarko Petroleum Anadarko Petroleum / Fort Union Gas Gathering Anadarko Petroleum / MGTC, Inc. Anadarko Petroleum.
Rocky Mountain Production and Pipeline Capacity 2004 BLM National Fluid Minerals Conference June 24, 2004.
2 The Bison Pipeline Project Open Season planned for 2 nd Quarter of 2004 Proposed Interconnects -Deadhorse (Bighorn, Fort Union) -MIGC, Thunder Creek.
1 Rockies Outlook For Internal Use Only April 12, 2001.
Wyoming Business Alliance/Wyoming Heritage
Presentation transcript:

1 Public Utilities Commission of the State of California March 23, 2004 Wyoming Wyoming Natural Gas Pipeline Authority

Where is Production Growing ……………….. ……………And Where is it Not Growing

5 Growth In Production - Wyoming Wyoming Production From Major Plants and Fields (Sales) Production is stated in MMCFD and is average daily production for a particular year. BlacksEchoLostPowder OpalGrangerForkSpringsCabinPavillion River Basin Oct 03 Average

6 Jonah Field ( EnCana Interest Only ) Unrestricted Development – If we dont keep drilling production will decline as illustrated in red below

7 Growth In Production – Colorado (Garfield County) ,000 Mcfd ,000 Mcfd ,000 Mcfd ,000 Mcfd March 03365,000 Mcfd Oct 03423,000 Mcfd Going to?1 Bcfd + Major Operators include: EnCana, Williams, Calpine, Mesa, Tom Brown, Exxon/Mobil Data Source: Colorado Oil and Gas Conservation Commission

8 Producer Critical Success Factors Access to Federal Lands Gas Price Timing of Regulatory Approvals Gathering System Capacities and Pressures Transportation Export Capacity Capital Efficiency Public Acceptance

9 Lack of Access to Federal Lands

10 Nymex vs Wyoming Prices

11 Nymex vs Wyoming Prices

12 Pipeline Projects In-service or Full Market Support Kern River Pipeline Expansion Williston Basin Grasslands Pipeline Northwest Pipeline Expansion El Paso Cheyenne Plains Pipeline TransColorado

13 Kern Expansion online May 03 WBI Grasslands online Nov 03 Northwest PL Expansion online Nov 03 Proposed El Paso Cheyenne Plains and Kinder Advantage EnCana Proposed Piceance to Cheyenne lateral TransColorado Expansion

14 Pipeline Export Projects Proposed Kinder Morgan Advantage Northern Border Bison Project Enbridge Chicago Project Southern Star Western Frontier Project El Paso Ruby Project Kinder Morgan TransColorado Expansion.

15 Intraregional Projects Questar Kern Expansion El Paso Front Range Expansions Xcel Front Range Projects Kinder Huntsman Storage Project Totem Gas Storage Project Questar Gas Storage Project Wyoming Interstate/Overthrust Backhaul Projects Jonah/Opal/Powder/Wind River Gathering/Processing Expansions EnCana NW Colorado to Cheyenne Project

16 Expansions Since 2001 Acquisition: Phase I: 9000 HP 50 miles of 20 Phase II: 9000 HP 40 miles of 20/24 Phase III: 3000 HP 90 miles of 20/ MMcf/d Plant 2001 Capacity: 450 MMcf/d 2004 Capacity:1180 MMcf/d Current Volume: 925 MMcf/d Teppco Jonah Gas Gathering System

17 Cost of Limited Infrastructure to Wyoming $130 + million in Federal/State royalties and severance taxes – $1 million per day in March Stalled investment in development of mineral resources. Limited ability to predict revenues with certainty.

18 $1 Billion in Bonding Authority

19 Our Team of Finance Professionals Goldman Sachs – Jeff Brown Merrill Lynch – Ed Burdett and Greg Dawley George K. Baum – Mary Keating-Scott and Geoff Urbina Kutak Rock – John Wagner

20 The Wyoming Pipeline Authority Will Promote all industry sponsored and supported projects. Proactively promote infrastructure development within the state and the Rocky Mountain Region. Promote efficient utilization of existing infrastructure in a cost effective manner. Promote development of Wyomings mineral resource base in a systematic, streamlined and environmentally responsible manner. Utilize its bonding authority to build or cause to be built infrastructure projects that will enhance state netbacks and promote development of a resource base that is in the nations best interests.

21 Thanks for the opportunity to speak with you. Bryan Hassler Interim Executive Director - Wyoming Natural Gas Pipeline Authority Ph Cell Fax Wyoming Pipeline Authority Presentations Can be Accessed via the Wyoming Oil & Gas Conservation Commission Website at: